Forwards Insp Rept 50-293/93-02 on 930111-15.No Violations Noted,However Unresolved Item Was Observed Re Accuracy of ISI Isometric Drawings That Govern ISI & IST Programs
ML20034F012
Person / Time
Site: Pilgrim
Issue date: 02/18/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boulette E
BOSTON EDISON CO.
Shared Package
ML20034F014 List:
References
NUDOCS 9303020197
Download: ML20034F012 (3)


See also: IR 05000293/1993002

Text

M6

'

'

..

7

t

FEB 181993

'

Docket No. 50-293

Dr. E. Thomas Boulette

Acting Senior Vice President-Nuclear

Pilgrim Nuclear Power Station

Boston Edison Company

RFD #1 Rocky Hill Road

-

Plymouth, Massachusetts 02360

Dear Dr. Boulette:

SUBJECT: INSPECTION REPORT NO. 50-293/93-02

This letter refers to the inspection conducted by Mr. J. E. Carrasco of this office on

January Il-15,1993, at the Braintree office and the Pilgrim Nuclear Power Station, in

Plymouth, Massachusetts. The inspector discussed the results of the inspection with '

Mr. W. C. Rothert and other members of your staff at the conclusion of the inspection.

This inspection focused on activities important to the public health and safety and was

'

directed towards engineering acdvities with emphasis on the adequacy of the design,

installation, and modification of safety related dynamic pipe restraints (DPRs) and static

'

(rigid) pipe supports, including snubber surveillance program. This inspection was also

conducted to determine the status and the adequacy of activities related to the replacement of

i

the Salt Service Water piping.

Details on the areas examined during the inspection are described in the NRC Region I

inspection report, which is enclosed with this letter. Within these areas, the inspection

,

consisted of selected examinations of procedures and representative records, interviews with

personnel, and observation by the inspector.

Within the scope of this inspection, no violations were observed. However, an unresolved

item was observed regarding the accuracy of the inservice inspection (ISI) isometric drawings -

that govern the ISI and inservice testing (IST) programs. This configuration control

deficiency was discussed with your staff during the inspection and they have initiated

corrective actions.

,

9303020197 930210

PDR

ADOCK 0500

3

0

1

.

.

.

FEB 181993

,.

Dr. E. Thomas Boulette

2

We noted that your staff has effective and efficient management and practical engineering to

support the activities related to the replacement of your Salt Service Water (SSW) piping.

ho reply to this letter is required. Your cooperation in this matter is appreciated.

'

Sincerely,

t

a rtrot5UwaEn

x: y v. : n

Jacque P. Durr, Chief

Engineering Branch

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-293/93-02

cc w/ encl:

E. Kraft, Acting Vice President, Nuclear Operations and Station Director

L. Schmeling, Plant Manager

V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department

i

D. Tarantino, Nuclear Information Manager

N. Desmond, Compliance Division Manager

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

-,

!

R. Adams, Department of12bor and Industries, Commonwealth of Massachusetts

The Honorable Edward M. Kennedy

>

The Honorable John F. Kerry

(

The Honorable Edward J. Markey

l

The Honorable Terese Murray

The Honorable Peter V. Forman

B. Abbanat, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

l

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

Paul W. Gromer, Massachusetts Secittary of Energy Resources

Sarah Woodhouse, Legislative Assistant

A. Nogee, MASSPIRG

l

Regional Administrator, FEMA

Office of the Commissioner, Massachusetts Depanment of Environmental Quality

Engineering

Office of the Attorney General, Commonwealth of Massachusetts

T. Rapone, Massachusetts Executive Office of Public Safety

Chairman, Citizens Urging Responsible Energy

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Massachusetts, SLO Designee

.

P

\\

.

FEB 181993

l

'

Dr. E. Thomas Boulette

3

bec w/ enc 1:

Region I Docket Room (with concurrences and IFS Forms)

DRS/EB SALP Coordinator

J. Linville, DRP

E. Kelly, DRP

l

J. Macdonald, SRI - Pilgrim (with concurrences and IFS Forms)

W. Butler, NRR

!

l

R. Eaton, NRR

V. McCree, OEDO

,

l

W.12nning, DRS

{

1

l

!

t

i

,

!

!

l

l

.

!

,

,

RI:DRS

RI:DRS

R :DRS

,

l

C

p

Durr

2 h/93

2/L/93

2////93

1

'

OFFICIAL RECORD COPY

A:PIL9202.JC

1

,

i

l

D

l