I NOTICE OF VIOLATION lowa Electric Light and Power Company Docket No. 50-331 Duane Arnold Energy Center License No. DPR-49 During an NRC inspection conducted on January 11-15, 1993 and January 27 -
February 10, 1993, one violation of NRC requirements was identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below:
Technical Specification 6.8.1 requires that written procedures involving nuclear safety, including applicable check-off lists and instructions for preventive and corrective maintenance operations which could have an effect on the nuclear safety of the facility be prepared, approved, implemented, and maintained. Administrative Control Procedure 1407.2, " Material Control in the Spent Fuel Pool and Cask Pool", implements this requirement by requiring a Fuel Storage Pool / Cask Pool Storage Permit to be initiated and approved for each item, other than tools, that will be stored in the Fuel Storage or Cask Pool.
This procedure also prohibits the storage of items with contact dose rates greater than 35 Rad per hour in the Cask Pool.
Contrary to the above, on September 4, 1992, workers did not initiate and obtain approval on a fuel Storage Pool / Cask Pool Storage Permit prior to storing a stellite bearing from a control rod blade in the Cask Pool.
Further, the stellite bearing had contact dose rates greater than 20,000 Rad per hour.
This is a Severity Level IV violation (Supplement IV).
Pursuant to the provisions of 10 CFR 2.201, Iowa Electric Light and Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington D.C. 20555 with a copy to the U.S. Nuclear Regulatory Commission, Region III, 799 Roosevelt Road, Glen Ellyn, Illinois, 60137, and a copy to_the NRC Resident Inspector at the Duane Arnold Energy Center within 30 days of the date of the letter transmitting this Notice of Violation (Notice).
This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results :chieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified in this Notice, an order or demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.
Dated at Glen Ellyn, Illinois Oll)/7)[Fr U dawa da this/1 day of February 1993 Tynthia D. Pederson, CMef #
Reactor Support Programs Branch 9303020111 930219 PDR ADOCK 05000331 G