Forwards Insp Rept 50-295/93-02 & 50-304/93-02 on 930119-29 & Notice of Violation
ML20034E844
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/19/1993
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20034E845 List:
References
NUDOCS 9303020010
Download: ML20034E844 (3)


See also: IR 05000295/1993002

Text

- .

.

-_.

_ _

_ _ - - - - - - - - -

t

t

.

1E*

'l

.:

!

,

FEB 151993

!

Docket No. 50-295

Docket No. 50-304

i

Commonwealth Edison Company

ATTN:

Mr.

L.

O.

DelGeorge, Vice President

j

Nuclear Oversight and Regulatory

i

Services

!

Executive Towers West III

,

1400 Opus Place, Suite 300

Downers Grove, IL

60515

i

Dear Mr. DelGeorge:

?

!

This refers to the inspection conducted by Messrs. A.

Dunlop and

l

M.

Huber of this office on JanuEry 19-29, 1993.

The inspection

i

included a review of activities for your Zion Nuclear Power

1

Station.

At the conclusion of the inspection, the findings'were

discussed with those members of your staff identified in the

enclosed report.

i

The areas examined during the inspection are identified in the

report.

These areas consisted primarily of a review of the Zion

I

program for inservice testing (IST) of pumps and valves and'of

the effectiveness of the program regarding the performance of

'

check valves.

Within these areas, the inspection consisted of a

selective examination of procedures and representative records,

observations, and interviews with personnel.

!

Based on the results of this inspection, we noted that certain of

your activities appeared to be in violation of NRC requirements,

j

as specified in the enclosed Notice of Violation (Notice).

The

violation is of concern because the duration of pump tests were

not in accordance with the ASME Section XI Code for testing of

pumps and valves and could result in erroneous test data.

R

You are required to respond to this letter and should follow the-

instructions specified in the enclosed Notice when preparing your

response.

In your response, you should document the specific

actions taken and any additional actions you plan to prevent-

recurrence.

After reviewing your response to this Notice,

including your proposed corrective actions and the results of

future inspections, the NRC will determine whether further NRC

enforcement action is necessary to ensure compliance with NRC

regulatory requirements.

!

e

,

,r

9303020010 930219

PDR

ADOCK 05000295

G

PDR

1

1

-v

-.

M Ol

j

A

__

_

_

.

.-

_

..

_ _

. . ,

. :.

' s

,

Commonwealth Edison Company

2

FEB i s Eg3

':

I

i

In addition, two unresolved issues are identified in the report.

I

These issues concern your use of the pump curves for IST without

relief from ASME Section XI Code requirements and your basis for-

!

not performing quarterly testing of several safety injection

r'

check valves.

You are requested to respond to these issues

within 60 days of your receipt of this report.

Your response

,

should include your evaluation of these issues and, if

'

.i

applicable, your intended corrective actions.

}

4

?

In accordance with 10 CFR 2.790 of the Commission's regulations,

a copy of this letter, the enclosures, and your responses to this

i

i

letter will be placed in the NRC Public Document Room.

,

The responses directed by this letter and the accompanying Notice

l

are not subject to the clearance procedures of the Office of

i

Management and Budget as required by the Paperwork Reduction Act

I

of 1980, PL 96-511.

l

l

We will gladly discuss any questions you have concerning this

inspection.

!

.

Sincerely,

l

1

d

OBC: mal. SGNED BY CE0fHH C. WRIEHI

'

!

G.

C. Wright, Chief

j

Engineering Branch

j

!

'

Enclosures:

1.

Notice of Violation

I

2.

Inspection Reports

,

No. 50-295/ 93002 (DRS) ;

No. 50-304/93002(DRS)

l

!

See Attached Distribution

l

s

.

i

!

N c5

t

RIIJ '1

RIIIh

> II

RIII

RIII

bi f

,

(j$.hr

I

(!(.

6

l'

h,

Dudlop*/ad/jk

Huber

Jacobson

Farb2r

fi

t

j

02/19/93

02/ri/93

02/l]/93

02/11/93

02/[{/93

^

-

.

-

-

-

-

,, .

. - . . .

_

_-

-

..-..

.

. -

-

_

.

!

. . :.

3-

)

,

~ !

!

~

!

FEB i s 7993

l

Commonwealth' Edison Company

3

!

1

Distribution

!

!

cc w/ enclosures:

l

R. Tuetken, Site Vice

.j

President

l

T. Joyce, Station Manager

j

S.

Kaplan, Regulatory

- j

Assurance' Supervisor

I

D.

Farrar, Nuclear Regulatory

L

Services Manager

'

DCD/DCB (RIDS)

oC/LFDCB

j

l

Resident Inspectors-Byron,

i

.Braidwood, Zion

j

'

Richard Hubbard

-

Mayor, City of Zion

}

J. W. McCaffrey, Chief

.

Public Utilities Division

LPM, NRR

j

l

J.

Norberg, NRR/EMEB:

1

T. Kobetz, TSS, DRP .

1

Robert Newmann, Office of Public

Counsel, State of Illinois

i

Center-

' l'

Robert M. Thompson, Administrator

i

!

Wisconsin Division of Emergency

Government

State Liaison Officer

chairman, Illinois Commerce

Commission

I

i

,,

-

. . - .

.m.,

_ . - --- ,

.

- , _

.. ..

.

~ .

..

4..

.

, - , _ ' .