ML20034E513

From kanterella
Jump to navigation Jump to search
Amend 186 to License DPR-59,adding Operability & SR to Tables 3.12.1, Water Spray/Sprinkler Protected Areas & 4.12.1, Water Spray/Sprinkler Sys Tests to Reflect Plant Mod Installed to Improve Fire Protection at Facility
ML20034E513
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/19/1993
From: Capra R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20034E514 List:
References
NUDOCS 9302260259
Download: ML20034E513 (5)


Text

  1. pc09%9'o
  • UNITED STATES t

NUCLEAR REGULATORY COMMISSION h

WASHINGTON, D. C. 20555

%, +..../

POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.186 License No. DPR-59 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Power Authority of the State of New York (the licensee) dated September 25, 1992, complies with the standards and requirements of the Atomic Energy Act of.1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common -

defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:

9302260259 930;:.19 PDR ADOCK 05000333

.p PDR

A

' (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 186, are hereby incorporated in the license.

The licensee shall operate the facility.in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance to be-implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION h U d~

Robert A. Capra, Director Project Directorate I-1 Division of Reactor Projects - I/II Office cf Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: February 19, 1993 7

I mad & - -

1

~

ATTACHMENT TO LICENSE AMENDMENT NO.186 FACILITY OPERATING LICENSE NO. DPR-59I DOCKET NO. 50-333

-fise Appendix A as follows:

l Remove Paoes Insert Piggi t

244j 244j 244q 244q I

?

P i

I J

h v

w t'

JAFNPP TABLE 3.12.1 WATER SPRAY / SPRINKLER PROTECTED AREAS AREA FIRE DETECTION TYPE PROTECTION (3)

TYPE INITIATION 1)

West Cable Tunnel lonization and Electric Heat Water Spray Automatic / Manual Activated Device 2)

East Cable Tunnel lonization and Electric Heat Water Spray Automatic / Manual Activated Device 3)

Recirculation MG Room Electric Heat Activated Device Fusible Link Sprinklers A.itomatic/ Manual 4)

Emergency Diesels (1)

Electric Heat Activated Device Fusible Link Sprinklers Automatic / Manual 5)

HPCI Electric Heat Activated Device Water Spray Manual 6)

RCIC Electric Heat Activated Device Water Spray Manual 7)

Standby Gas Treatment Trains (2)

Electric Heat Activated Device Water Spray Manual 8)

West Diesel Fire Pump Room Sprinkler Flow Alarm Fusible Link Sprinklers Automatic 9)

Battery Room Corridor Ionization and Sprinkler Fusible Link Sprinklers Automatic Flow Alarm Notes for Table 3.12.1 1.

Each of two (2) Emergency Diesel Generator Systems is a separate protected area, each system contains two (2) separate rooms.

2.

Each of two (2) Standby Gas Treatment trair s is a separate area.

3.

All areas are also protected by fire hoses and portable dry chemical and/or CO fire extinguishers.

2 1[,186 Amendment No.

244j

JAFNPP TABLE 4.12.1 WATER SPRAY / SPRINKLER SYSTEM TESTS CYCLING SPRAY NOZZLE HEADER INTEGRITY NOZZLE AIR AREA EACH VALVE INSPECTION INSPECTION FLOW TEST

.1)

West Cable Tunnel Once/6 Months Once/1.5 Years Once/1.5 Years Once/3 Years 2)-

East Cable Tunnel Once/6 Months Once/1.5 Years Once/1.5 Years Once/3 Years 3)

Recirculation MG Room Oncel6 Months

'N/A Once/1.5 Years N/A-4)

Emergency Diesel Rooms Once/6 Months N/A Once/1.5 Years N/A 5)

HPCI Once/6 Months Oncet1.5 Years Once/1.5 Years Once/3 Years -

6)_. RCIC

. Once/6 Months Once/1.5 Years Once/1.5 Years Once/3 Years 7)

Standby Gas Treatment Trains Once/6 Months Once/1.5 Years Once/1.5 Years Once/3 Years l

- 8)

West Diesel Fire Pump Room None(1) '

N/A-Once/1.5 Years N/A~

.4)

Battery Room Corridor None(1)

N/A Once/1.5 Years -

'N/A

-l Notes for Table 4.12.1 1.

Wet pipe sprinkler system.

i e

g 4 '"

.244q

.m