___
d..
j OPERATIIIG DATA REPORT
-l DOCKET NO., 50-341 COMPLETED BY-P. M. Anthony-DATE May 15, 1990 TELEPHONE (313) 586-1617 OPERATING STATUS
- 1. = UNIT NAME:
Fermi 2' l Notes l
- 2. -REPORTING PERIOD: ' April, 1990' l
l
- 3. = LICENSED THERMAL POWER (MWt):
3293 l.
I 4.
NAMEPLATE RATING (GROSS MWe)':
1154 l
l~
5.
DESIGN ELECT RATING (Net MWe):-1067 l
l 6.
MAX DEPENDABLE CAP (GROSS MWe): 1154 I
l 7
MAX. DEPENDABLE CAP-(NetLMWe):
-1067 l
-l 8.
IF CHANGES OCCUR IN CAPACITY RATINGS-(ITEMS-NUMBER 3 THROUGH 7) SINCE' LAST REPORT, GIVE REASONS:
9 POWER LEVEL TO WHICH RESTRICTED, IF ANY'(MWe Net):
None q
-10. REASONS FOR RESTRICTION, IF ANY: None h
.THIS MONTH.
YR TO DATE CUMULATIVE:
- 11. HRS IN REPORTING PERIOD 719 2879 19,885 l
- 12. HRS REACTOR WAS CRITICAL 609.1 2769.1' 13,8661
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE'
'589.7 12749.7-113,046.5',
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0- _
- 16. GROSS THERMAL ENERGY GEN (MWH) 1,578,696 8,474,496
.-37,836,458_
- 17. GROSS ELECT ENERGY GEN (MWH) 508,980' 2,838,980' 12,583,337 -
- 18. NET ELECT ENERGY GEN (MWH) 485,703-2,721,609' 12,034,460
~
- 19. UNIT SERVICE FACTOR 82.0-95 5 65.6
-20. UNIT AVAILABILITY FACTOR 82.0 95.5 65.6-
, 88.6 55.6
- 22. UNIT CAP FACTOR (USING DER NET) 63 3-88.6-55.6
- 23. UNIT FORCED OUTAGE RATE 18.0 4.5 15.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS'(TYPE, DATE, DURATION 10F EACH)
None.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED
(-
INITIAL CRIT 7CALITY N/A N/A l
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9005210273 900515 h
PDR ADOCK 05000341 R
PDC g
)
.e;.
AVERAGE DAILY UNIT POWER LEVEL 1
DOCKET NO.
50-341 UNIT FERMI 2 3
I DATE' May 15, 1990 j
COMPLETED BY-
'E. Dawson TELEPHONE
~(313) 586-5027 I
Month
. April, 1990 DAY AVERAGE DAILY POWER' LEVEL DAY -AVERAGE ~ DAILY. POWER LEVEL (MWe-Net)
(MWe-Net)'
l 1
947-
-17 572 2
1068L 18 949 3
1075' 19
-1060-4 1070 20
'1054-5 1071
. 21
'1040 6
1078 22 1063
.[
7 1045 23 1057:
8 1073 24 1040 9
1064 25.
299 10 93 26 254-11 0
27 252 t
12 0
28 311-i 13 0
29 556 i
'i 14 0
30 772
?i 15 78 31 16 347 k
g 11
- i
,j
UseIT Se=JTOOWses Aced POWER REDUCTIONS
.-.i L 00CEET NO.
50-341 DATE mer 15.'1990 UNIT NAaBE.-
Feral 2'
COtsPLETED BV P.
W.
Anthony TELEPHONE (313)S86-1617 REPORT MONTH Apr41 1990' 1
I j
i i
I l
l l
t NETHOO OF l LER l SYS l CORIP I CAUSE & CORRECT!vE-l NO4 DATE TVPE l DUR REASON l SHUTTING DOwN l-NO.
l CODE l CODE {
ACTION TO PREVENT l
l l (1) l (HRS)l (2) l THE REACTOR l
(4) l (S)
- ECURRE88CE-l l
. l l
(3) l l
l_
1 I
i 129.3 l
-l 90-004 ^
04/10/90 l FL, l l.
A-3 90-003 l JC l RLY l The coli of the Mi relay for the l-l' l
l l
l 55 l ISV l Division.I RPS motor generator set l l
l-l l
l l
l l
lA burned up.- This caused a toss of I l
l l
l l
l
]
l Divisf ore I power and subsequently ~ l l.
l l
l l
l l.wortous isolations occurred.
l
-l l
l l
l l
l including Olvision I drymett l
l l
l l
l
- 1. l.
I pneumatics.- Leekage in the-4 l
l l
l l
l l 1solated pneumatic system mes such l t.
l l
l l
l 1
l that the inboard WSIVs closed ln I
l l
l l
l l
{-
l l sopro=4mately 6 minutest cousing a e l
l l
l l
1 l
l l
1 screm.
l l
l l
t l
l --
l 58 l V
-l Reduced power to reptoce leakinga 1
l l
l 90-005 l 04/24/90 l F l'-
l A
l
'd 1
l l
]
l l
l
.l-
. l l GISIV Leekage Control valve 82tF434 l
l l
l l -.
l l
l.
l end perfarm schedu ed meintenence.
I l
l l
1 l
l l
I l
1 (1) F: FORCEC (2) REASON:
-(3) 98ETHOOr (4) EXHIBIT G - INSTRUCT 10seS S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - SBA900AL FOR PftEPARATION OF DATA B - 90AINTENANCE CR TEST-2 - MANUAL SCRAtB ENTRY SHEETS FOst LICENSEE C - REFUELING 3 - AUTOthATIC SCRAlf Ev1ENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED
'(NUREG-0161).
E.- OPERATOR TRAINING & LICENSE EXAef! NATION S'- REDUCED LOAD F '- ADERINISTRATIVE 9 - OTHER G.- OPERATICMAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN).
(S) EJHIBIT 1 - SAmE SOURCE