a' O

i

' TENNESSEE VALLEY. AUTHORITY NUCLEAR POWER GROUP SEQUOYAH NUCLE /.R PLANT MONTHLY OPERATING REP 01T:

TO THE-NUCLEAR REGULATORY.COMH7SSION I

FEBRUARY 1990 i

UNIT 1 00CKET NUMBER 50-327' LICENSE' NUMBER DPR-77 UNIT 2' DOCKET NUMBER 50-328 LICENSE-NUMBER DPR-79 i

E V

4 5

.Y.

.q.,

i

't 9005070271 900314 Q

DR ADOCK 050003p7

,{

PDR

~

. 2.._ _...

.m _._..,. g.., _d L. ~ i ~., x. &. v.......,4.. n m u-. 2w,

4 OPERATIONAL'

SUMMARY

FEBRUARY 1990

/

UNIT'l Unit 1 generated 789,450 MWh (gross) electrical power during. February wlth a capacity factor of-99.30 percent.

The unit operated at approx'mately 100 percent power untti february 26, 1990, when the unit entered coastdown to Unit 1 Cycle 4 refueling outage; Unit I was operating at approximately 96 percent power at the end'of the month.

i UNIT 2 Unit 2 generated-784,910 MHh (gross) electrical power during February'with a capacity factor of 98.73 percent.

SI-106.3, " Ice Condenser - Ice Bed (Unit 2)," was performed with the unit' operating at 100 percent power.

The following page summarizes the results of the SI-106.3 performance..

Unit 2 experienced no power reductions during the month and was operating at approximately 100-percent power at the end.of-the month.

3 POWER-OPERATED RELIEF VALVES (PORVs) AND SAFETY VALVES

SUMMARY

There were no chs11enges to PORVs or safety valves in the mo:.th of February.

OFFSITE DOSE CALCULATION MANUAL (00CM)-CHANGES Revision 24 to the 00CM is attached, t

-,me..

E f

h 4

.4 j.l

~ uu [$$AwAn GE.-

w_n.,

...k n

-n

~. -. ~., -

A 4

UNIT 2 ICE CONDENSER INSPECTION

SUMMARY

OF SI-106.3 TEST RESULTS Bays 1, 2,17, and 20 met 33 percent inspection-criteria.

Fifty-four flow passages were inspected.

Bays 3, 5. 6, 8, 9,10,13,15,16. - 18.19, 23,- and.24 met the :100 percent inspection criteria. All 162 flow passages were inspected.

Bays 4, 7, 11,-12, 14, 21.-and 22 failed the 100 percent inspection criteria. -These bays were cleaned reinspected, and met.the 100 percent inspection criteria.

Approximately 7 percent (275 out of 3888) of the flow passages were inspected using the camera.

The remaining flow passages were inspected-using the drop light.

Two CAQRs were written during the-performance of the test.

CAQR SQP901502 was written because of miscellaneous debris found during the inspection.

CAQR SQP901503 was written when Bays 4, 7, 11, 12, 14.- 21, and 22 failed to meet'the'15 percent blockage criteria.

l M

{

t

J 1
n.

1.

2 s

-1 1

o -~: s. 4 -

..+

.a,.. Al e,,

..;ig,,a.j$mu;.,,,i,,;,,;_,ma Q") _.

,,n

r i

AVERAGE DAILY UNIT POWER' LEVEL' I

DOCKET NO.

50-327 UNIT-tone DATE

_03-01-90~

. COMPLETED BY T; J. Hollomon' TELEPHONE (615) 843-7528 l

l1 MONTH FEBRUARY 1990 DAY

. AVERAGE DAILY POWER LEVEL DAY AVERAGE:0AILY POWER LEVEL-(HWe-Net)-

3(HWe-Net)

(

1 1144 17-1140-2 1145 18 1138 3

1146 19 1137 4

1144 20 1138' 5

1144 21-1139 6

1144 22 1137 4

7 1142 23 1139 8

1142 24 1140 7

9 1142 25 1140 10 1141

'26

. _,_1_1 30 11 1141 27-1117

[

12 1137 28 1118 il 13 1140 29

,4 14 1141 30 15 li40 31 16 1138 ii i

e, 1

b

(

'.sj<

s-..-

au m

.w ece,,4 :

4 3.--

, % t o,.

m..

y _,,

se-w 5**.h*M*i== M y[

$' '+^* M AI*** } A*

ra a

  • a

AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO.

50-328:

Unit Two DATE 03-01-90 COMPLETED BY

,T. J.'Ho11omon TELEPHONE (615) 643-7528'

. MONT.H FEBRUARY 1990 1

j DAY AVERAGE DAILY POWER LEVEL DAY =-

AVERAGE DAILY POWER LEVEL d

(MWe-Net)

-(MWe-Net) 1 1132 17 1126 2

1133 B

1125

'3 1132 19 1126-4 1129 20 1127 j

5 1131 21 1129 k

6 1131 22 1134~

7 1129-23

'1139 8

1130 24.

1140 i

9 1129 25-1139 10 1128 26-1136 t

11-1128 27 1139L 12 1127 28 1140 l

j 13 1127 29 1

14 1126 30 l

15 1126 31 i

16 1126 I

A o

a

. i

. hl F1 1

~.

c 7.a,

.~.

-[

OPERATING DATA REPORT 00CKE1 NO.

50-327 DATE N rch 1. 1990 CopFLETE0 BY T. J. Hollymon

[

TELEPHONE f615)843-7528

i RRATING STATUS

! Notes 1.

Unit Name:,,,,,jggpvah Unit One 1

2.'

Reporting Period:

February 1990 1

1 1

3.

L.lcensed Thetual Power (Pldt): 3411.0

_-1 l

l 4.

Nameplate Rating (Gross fede): 1220.6 1

5.

Design Electrical Rating (Net fWe): - 1148.0 1

1 6.

Maniers Dependable Capacity (Gross Ptie): 1183.0

_ -1 1

7.

Maximum Deperb ble Capacity (Net flie): 1148.0 t

8.

If Changes occur in L4acity Retings (Items Ihauber 3 Through 7) Since Last Report, Give Reasons: -

t d/A h

9.

Power Level To Which Restricted, If Any (Net Plie):

N/A

10. Reasons For Restrictions, If Any:

N/A 1

f l

This Month Yr-to4 ate Criutative~

m l

11. Hours in Reporting Period ts72 1.416' 75.961
12. Nun 6er of Hours Reactor Was Critical 672 1.416 34.912-
13. Reactor Reserve Shutdown Hours 0-0 0

l

14. Hours Generator on-Line 672.0 1.416.0 34.105.4
15. Unit Reserve Shutdown Hours 0

0 0

l

16. Gross Thermal Energy Generated (ftdH) 2.281.894 4.658.530 110.994.409
17. Gross Electrical Energy Generated (ftm) 789.450 1.617.220 37.640.976'
18. Net Electrical Energy Generated (leM) 765.134 1.565.536-36.037.565-l
19. Unit Service Factor 100.0

-100.0 44.9

20. Unit Availability Factor 100.0 100.0 44.9
21. Unit Capacity Factor (using IOC Net) 99.2 96.3 41.3
22. Unit Capacity Factor (Using DER Net) 99.2 96.3 41.3
23. Unit Forced Outage Rate' O.0-0.0 -

48.3 1

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

I!

Unit 1 Cycle 4 refuel outace in %rch 1990 with a duration of 70 days.

j 25, if Shut Down At End Of Report Period, Est mated Date of Startup:

N/A f

I

-4 f

i b

A 8

i j J

,, t 1

a w%v a

w a

1

~

OPERAi!NG DATA REPORT SOCKET ND.

W-328 D4ft Inarch 1. 1990 CorFLETED BY

f. J. Hollanon TELEPHONE [615) 843-7528 OPERATING STATUS INotes 1.

Unit Man:

Seeuovah Unit Two i

1 2.

Reporting Period:

February 1990 t

i 3.

Licensed Thermal Power (ptA): 3411.0 t

1 4

Nameplate Rating (Gross fede): _j220.6 1

i S.

Des)en Electrical Ratine (Net pese): 114a.0 t

t 6.

Maalem Dependable Capacity (Gross Pter): 1183.0 t

i 7.

Maalam Dependable Capacity (Net phle): 1140.0 l

8 If Changes Occur in Capacity Ratings (Items Neuber 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Whict. Restricted, if Any (Wet Pede):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Cate Cum:14tive

11. Hours in Reporting Period 672 1.416 67.921
12. Number of Hours Reactor Was Critical 672 1.416 34.946
13. Reactor Reserve Shutdown Hours 0

0___

0

14. Hours Generator On-Line 672.9 1.416.0 34.111.8
15. Unit Reserve shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (ptdH) 2.287.291 4.656.425

_105.066.684

11. Gross Electrical Energy Generated (pedH) 784.910 1.600.970 35.621.666
18. Net Electrical Energy Generated (ptdH) 750.416 1.544.354 33.992.608
19. Unit Service Factor 100.0 100.0 50.2
20. Unit Availability Factor 100.0 100.0 50.2
21. Unit Capacity Factor (bsing 2C Net) 98.3 95.0 43.6
22. Unit Capacity Factor (Using DER Wet) 98.3 95.0 43.6
23. Unit Forced Outage Rate 0.0 _

0.0 43.9

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End of Report Period, Estimated Date of Startup:

N/A

'i

^t i

i a.-

-+,"~,.sa.

- +

. -~ i A ~ + -

1

-,e - w,- m

w..

g tMIT SHJTD0tet5 Afe POWER REDUCTI0sts IMIT meME!

Dae T 4' DME:

avot/ge i'y

~ CONPLETED BY:T. 1. Halleman 5

REP 07T MONTH: February 1990 TELEPM04E:(615) 843-7528 "l

1g "i

h

! Method of

! Licensee Cawse and Corrective !

j

! Duration !

! Shutting Down ! Event

! System

! Component !

Action to 8

! No.

! D te

! Type'

! (Hours) ! Reason'

! Reactor

! Report No.

! Code'

! Code' Prevent Recorrence i

?

?

?

?

?

?

?

?

J e

! No outage er power I reductions dvring the

.j

! month. Unit began

's

! coastdown en 2/26/90 y

! for UTC4 and was at Q

! appreminately 96 1

! percent power level

~

! en 2/28/98.

4

!}

+

i 8

8 F! Forced Reason:

Method:

  • Enhibit G-Instrections 5: Scheduled A-Equipment Failure (Emplain) 1-Manual for Properation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage (muREG-061)

E-Operator Training and License Examir.a' ion 5-Reduction F-Administrative 9-Other G-Operational Error (Emplain)

'Enhibit I-Same Seerce i

H-Other (Emplain) 7 a

. s b

.4 '

t-f

+

._m.

_m____-_

M ET no-sa-m

  • ~ ~ - + - * * ~

LMIT 5"JTDOWt3 AfD POWEst REDUCTIONS ImIT senME:

Tue DATE:

03/01/90 REPORT MONTH: February 1990 COMPLETED BY:T. J. Hollaman TELEPHONE:4151 843-7528

! Method of

! Licensee Cawse and Corrective !

! Duration !

! Shutting Down ! Event

! Systes

! Component !

Action to

! No.

! Date

! Type'

! (Hours) ! Reason'

! Reactor'

! Report No.

! Code *

! Code

Prevent Recwcresce t

! Ito outage er power l

! reductions dering the j

! month. tinit at appremi-!

I mately 100 percent remer!

! level entire month.

j i

~

}

g

'F: Forced

  • Reason:

8Method:

  • Enhibit G-Instructions 5: Scheduled A-Equipment Failure (Emplain) 1-Manual-for Preparation of Data B-Maintenance or Test 2-Maaval Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report'(LER) File D-Regulatory Restruction 4-Continuation of Existing Outage (NUREG-061)

E-Cperator Training and License Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Emplain)

  • Enhibit I-Same Seerce H-Other (Emplain) 1

.