a' O
i
' TENNESSEE VALLEY. AUTHORITY NUCLEAR POWER GROUP SEQUOYAH NUCLE /.R PLANT MONTHLY OPERATING REP 01T:
TO THE-NUCLEAR REGULATORY.COMH7SSION I
FEBRUARY 1990 i
UNIT 1 00CKET NUMBER 50-327' LICENSE' NUMBER DPR-77 UNIT 2' DOCKET NUMBER 50-328 LICENSE-NUMBER DPR-79 i
E V
4 5
.Y.
.q.,
i
't 9005070271 900314 Q
DR ADOCK 050003p7
,{
~
. 2.._ _...
.m _._..,. g.., _d L. ~ i ~., x. &. v.......,4.. n m u-. 2w,
4 OPERATIONAL'
SUMMARY
FEBRUARY 1990
/
UNIT'l Unit 1 generated 789,450 MWh (gross) electrical power during. February wlth a capacity factor of-99.30 percent.
The unit operated at approx'mately 100 percent power untti february 26, 1990, when the unit entered coastdown to Unit 1 Cycle 4 refueling outage; Unit I was operating at approximately 96 percent power at the end'of the month.
i UNIT 2 Unit 2 generated-784,910 MHh (gross) electrical power during February'with a capacity factor of 98.73 percent.
SI-106.3, " Ice Condenser - Ice Bed (Unit 2)," was performed with the unit' operating at 100 percent power.
The following page summarizes the results of the SI-106.3 performance..
Unit 2 experienced no power reductions during the month and was operating at approximately 100-percent power at the end.of-the month.
3 POWER-OPERATED RELIEF VALVES (PORVs) AND SAFETY VALVES
SUMMARY
There were no chs11enges to PORVs or safety valves in the mo:.th of February.
OFFSITE DOSE CALCULATION MANUAL (00CM)-CHANGES Revision 24 to the 00CM is attached, t
-,me..
E f
h 4
.4 j.l
~ uu [$$AwAn GE.-
w_n.,
...k n
-n
~. -. ~., -
A 4
UNIT 2 ICE CONDENSER INSPECTION
SUMMARY
OF SI-106.3 TEST RESULTS Bays 1, 2,17, and 20 met 33 percent inspection-criteria.
Fifty-four flow passages were inspected.
Bays 3, 5. 6, 8, 9,10,13,15,16. - 18.19, 23,- and.24 met the :100 percent inspection criteria. All 162 flow passages were inspected.
Bays 4, 7, 11,-12, 14, 21.-and 22 failed the 100 percent inspection criteria. -These bays were cleaned reinspected, and met.the 100 percent inspection criteria.
Approximately 7 percent (275 out of 3888) of the flow passages were inspected using the camera.
The remaining flow passages were inspected-using the drop light.
Two CAQRs were written during the-performance of the test.
CAQR SQP901502 was written because of miscellaneous debris found during the inspection.
CAQR SQP901503 was written when Bays 4, 7, 11, 12, 14.- 21, and 22 failed to meet'the'15 percent blockage criteria.
l M
{
t
- J 1
- n.
1.
2 s
-1 1
o -~: s. 4 -
..+
.a,.. Al e,,
..;ig,,a.j$mu;.,,,i,,;,,;_,ma Q") _.
,,n
r i
AVERAGE DAILY UNIT POWER' LEVEL' I
DOCKET NO.
50-327 UNIT-tone DATE
_03-01-90~
. COMPLETED BY T; J. Hollomon' TELEPHONE (615) 843-7528 l
l1 MONTH FEBRUARY 1990 DAY
. AVERAGE DAILY POWER LEVEL DAY AVERAGE:0AILY POWER LEVEL-(HWe-Net)-
3(HWe-Net)
- (
1 1144 17-1140-2 1145 18 1138 3
1146 19 1137 4
1144 20 1138' 5
1144 21-1139 6
1144 22 1137 4
7 1142 23 1139 8
1142 24 1140 7
9 1142 25 1140 10 1141
'26
. _,_1_1 30 11 1141 27-1117
[
12 1137 28 1118 il 13 1140 29
,4 14 1141 30 15 li40 31 16 1138 ii i
e, 1
b
(
'.sj<
s-..-
au m
.w ece,,4 :
4 3.--
, % t o,.
m..
y _,,
se-w 5**.h*M*i== M y[
$' '+^* M AI*** } A*
ra a
- a
AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO.
50-328:
Unit Two DATE 03-01-90 COMPLETED BY
,T. J.'Ho11omon TELEPHONE (615) 643-7528'
. MONT.H FEBRUARY 1990 1
j DAY AVERAGE DAILY POWER LEVEL DAY =-
AVERAGE DAILY POWER LEVEL d
(MWe-Net)
-(MWe-Net) 1 1132 17 1126 2
1133 B
1125
'3 1132 19 1126-4 1129 20 1127 j
5 1131 21 1129 k
6 1131 22 1134~
7 1129-23
'1139 8
1130 24.
1140 i
9 1129 25-1139 10 1128 26-1136 t
11-1128 27 1139L 12 1127 28 1140 l
j 13 1127 29 1
14 1126 30 l
15 1126 31 i
16 1126 I
A o
a
. i
. hl F1 1
~.
c 7.a,
.~.
-[
OPERATING DATA REPORT 00CKE1 NO.
50-327 DATE N rch 1. 1990 CopFLETE0 BY T. J. Hollymon
[
TELEPHONE f615)843-7528
- i RRATING STATUS
! Notes 1.
Unit Name:,,,,,jggpvah Unit One 1
2.'
Reporting Period:
February 1990 1
1 1
3.
L.lcensed Thetual Power (Pldt): 3411.0
_-1 l
l 4.
Nameplate Rating (Gross fede): 1220.6 1
5.
Design Electrical Rating (Net fWe): - 1148.0 1
1 6.
Maniers Dependable Capacity (Gross Ptie): 1183.0
_ -1 1
7.
Maximum Deperb ble Capacity (Net flie): 1148.0 t
8.
If Changes occur in L4acity Retings (Items Ihauber 3 Through 7) Since Last Report, Give Reasons: -
t d/A h
9.
Power Level To Which Restricted, If Any (Net Plie):
N/A
- 10. Reasons For Restrictions, If Any:
N/A 1
f l
This Month Yr-to4 ate Criutative~
m l
- 11. Hours in Reporting Period ts72 1.416' 75.961
- 12. Nun 6er of Hours Reactor Was Critical 672 1.416 34.912-
- 13. Reactor Reserve Shutdown Hours 0-0 0
l
- 14. Hours Generator on-Line 672.0 1.416.0 34.105.4
- 15. Unit Reserve Shutdown Hours 0
0 0
l
- 16. Gross Thermal Energy Generated (ftdH) 2.281.894 4.658.530 110.994.409
- 17. Gross Electrical Energy Generated (ftm) 789.450 1.617.220 37.640.976'
- 18. Net Electrical Energy Generated (leM) 765.134 1.565.536-36.037.565-l
- 19. Unit Service Factor 100.0
-100.0 44.9
- 20. Unit Availability Factor 100.0 100.0 44.9
- 21. Unit Capacity Factor (using IOC Net) 99.2 96.3 41.3
- 22. Unit Capacity Factor (Using DER Net) 99.2 96.3 41.3
- 23. Unit Forced Outage Rate' O.0-0.0 -
48.3 1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
I!
Unit 1 Cycle 4 refuel outace in %rch 1990 with a duration of 70 days.
j 25, if Shut Down At End Of Report Period, Est mated Date of Startup:
N/A f
I
-4 f
i b
A 8
i j J
,, t 1
a w%v a
w a
1
~
OPERAi!NG DATA REPORT SOCKET ND.
W-328 D4ft Inarch 1. 1990 CorFLETED BY
- f. J. Hollanon TELEPHONE [615) 843-7528 OPERATING STATUS INotes 1.
Unit Man:
Seeuovah Unit Two i
1 2.
Reporting Period:
February 1990 t
i 3.
Licensed Thermal Power (ptA): 3411.0 t
1 4
Nameplate Rating (Gross fede): _j220.6 1
i S.
Des)en Electrical Ratine (Net pese): 114a.0 t
t 6.
Maalem Dependable Capacity (Gross Pter): 1183.0 t
i 7.
Maalam Dependable Capacity (Net phle): 1140.0 l
8 If Changes Occur in Capacity Ratings (Items Neuber 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Whict. Restricted, if Any (Wet Pede):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Cate Cum:14tive
- 11. Hours in Reporting Period 672 1.416 67.921
- 12. Number of Hours Reactor Was Critical 672 1.416 34.946
- 13. Reactor Reserve Shutdown Hours 0
0___
0
- 14. Hours Generator On-Line 672.9 1.416.0 34.111.8
- 15. Unit Reserve shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (ptdH) 2.287.291 4.656.425
_105.066.684
- 11. Gross Electrical Energy Generated (pedH) 784.910 1.600.970 35.621.666
- 18. Net Electrical Energy Generated (ptdH) 750.416 1.544.354 33.992.608
- 19. Unit Service Factor 100.0 100.0 50.2
- 20. Unit Availability Factor 100.0 100.0 50.2
- 21. Unit Capacity Factor (bsing 2C Net) 98.3 95.0 43.6
- 22. Unit Capacity Factor (Using DER Wet) 98.3 95.0 43.6
- 23. Unit Forced Outage Rate 0.0 _
0.0 43.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
N/A
'i
^t i
i a.-
-+,"~,.sa.
- +
. -~ i A ~ + -
1
-,e - w,- m
- w..
g tMIT SHJTD0tet5 Afe POWER REDUCTI0sts IMIT meME!
Dae T 4' DME:
avot/ge i'y
~ CONPLETED BY:T. 1. Halleman 5
REP 07T MONTH: February 1990 TELEPM04E:(615) 843-7528 "l
1g "i
h
! Method of
! Licensee Cawse and Corrective !
j
! Duration !
! Shutting Down ! Event
! System
! Component !
Action to 8
! No.
! D te
! Type'
! (Hours) ! Reason'
! Reactor
! Report No.
! Code'
! Code' Prevent Recorrence i
?
?
?
?
?
?
?
?
J e
! No outage er power I reductions dvring the
.j
! month. Unit began
's
! coastdown en 2/26/90 y
! for UTC4 and was at Q
! appreminately 96 1
! percent power level
~
! en 2/28/98.
4
!}
+
i 8
8 F! Forced Reason:
Method:
- Enhibit G-Instrections 5: Scheduled A-Equipment Failure (Emplain) 1-Manual for Properation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage (muREG-061)
E-Operator Training and License Examir.a' ion 5-Reduction F-Administrative 9-Other G-Operational Error (Emplain)
'Enhibit I-Same Seerce i
H-Other (Emplain) 7 a
. s b
.4 '
t-f
+
._m.
_m____-_
M ET no-sa-m
- ~ ~ - + - * * ~
LMIT 5"JTDOWt3 AfD POWEst REDUCTIONS ImIT senME:
Tue DATE:
03/01/90 REPORT MONTH: February 1990 COMPLETED BY:T. J. Hollaman TELEPHONE:4151 843-7528
! Method of
! Licensee Cawse and Corrective !
! Duration !
! Shutting Down ! Event
! Systes
! Component !
Action to
! No.
! Date
! Type'
! (Hours) ! Reason'
! Reactor'
! Report No.
! Code *
! Code
Prevent Recwcresce t
! Ito outage er power l
! reductions dering the j
! month. tinit at appremi-!
I mately 100 percent remer!
! level entire month.
j i
~
}
g
'F: Forced
- Reason:
8Method:
- Enhibit G-Instructions 5: Scheduled A-Equipment Failure (Emplain) 1-Manual-for Preparation of Data B-Maintenance or Test 2-Maaval Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report'(LER) File D-Regulatory Restruction 4-Continuation of Existing Outage (NUREG-061)
E-Cperator Training and License Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Emplain)
- Enhibit I-Same Seerce H-Other (Emplain) 1
.