Responds to Re Concern Expressed by Constituent Re Util Request to Convert License DPR-13 to Full Term Ol. NRC Satisfied W/Util Implementing Compensatory Administrative Controls to Assure Plant Safety
ML20034C566
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 05/02/1990
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Packard R
HOUSE OF REP.
Shared Package
ML20034C567 List:
References
CCS, NUDOCS 9005040147
Download: ML20034C566 (8)


Text

_

'T i

=.

J ff je UNITED STATES

( ' f-

' NUCLEAR REGULATORY COMMISSION y

)

g 5

,oE-W ASHINGTON, D. C. 20S55 J

h....+

May 2,1990 1

The Honorable Ron Packard United States' House of Representatives-Washington, D.C.

20515

Dear Congressman Packard:

q 1.am responding to your letter of April 3,1990, regarding a concern that.was expressed by one of your constituents. Specifically, Mrs. Geismar of Mission Viejo, California, questioned why Southern California Edison Co'. (the licensee) requested conversion of Provisional Operating License (POL) No. DPR-13.for San OnofreNuclearStation, Unit 1,toafull-termoperatinglicense(FTOL)..

Between 1969 and 1971, the Atomic Energy Commission (AEC) issued 15 POLS.

These licenses allowed continued. plant-operation while the AEC staff and the licensees evaluated plant operating characteristics and resolved.any generic concerns. The AEC intended to convert these POLS to FTOLs upon-completion of this review process. -The AEC did-not intend the POLS to be permanent licenses and only issued them to allow the facilities an interim period of-operation' In the case of San Onofre Unit 1, the licensee requested that the-AEC convert the POL to an FTOL in July.1970. However, at that time, the AEC staff was still evaluating a large backlog of unresolved generic issues, and_the staff determined that it was not appropriate to convert any of the' remaining POLS:to FTOLs until these issues were resolved.

L In 1977, the U.S. Nuclear Regulatory Connission (NRC) initiated the Systematic l

Evaluation Program (SEP) as a mechanism to review the designs of older operating nuclear reactor plants to reconfirm and document their safety, and it sub-sequently became a prerequisite for conversion of POLS to FTOLs. The review provided the following:

(1) an assessment of how these plants' compare with current licensing safety requirements relating to selected issues; (2) a basis for deciding how these differences should be resolved in an integrated plant review; and (3) a documented evaluation of plant safety. The NRC completed this evaluation for San Onofre Unit 1 and documented the results in NUREG-0829,

" Integrated Plant Safety Assessment Systematic Evaluation Program," dated December 1986.

As a result of the NRC staff's evaluation, a large number of action items were identified for licensee resolution. Although Southern California Edison Co.

has resolved many of these action items, a number of them still require resolution. To facilitate conversion from a POL to an FTOL-for San Onofre

~

Unit 1, the NRC issued a Confirmatory Order dated January 2,1990, which confirms the licensee's schedule for resolving these FTOL open items.

In the interim, while these FTOL open items are being resolved, the licensee has implemented compensatory administrative controls to assure plant safety. The NRC is satisfied with the licensee's actions in this regard and we believe that the plant is safe to operate while these FTOL open items are being resolved.

90050401h h 206 PDR ADO PDC M

H

+,

...~..i-

.. _,... ~.. ~.

1 i

The Honorable Ron Packard 2-For your information, I have enclosed a copy of our Confirmatory Order dated January 2,1990,- that pertains to the scheduling of FTOL open items applicable to San Onofre Unit 1.

If you have any further questions on this matter, please contact me.

Sincerely,

ginal Signed Byi James M. Taylor '

James M. Taylor Executive Director for Operations

Enclosure:

Confirmatory Order dated January 2,1990

  • See previous concurrence

,0FC

DRSP/PD5*
DRSP/PD5*
TECH EDITOR * :(A)DR5P:D:PD5*:(AJAD/DRSP*

_ NRR/ADPR-A-p.....:................:..............:...___........:___....__.....:..............:.............

CAME - :PShea

JTatum:sg
BCalure
CTrammell
JZwolinski-
GHolahan c.....:....... __......:..............:.......___...:...__.........:..............:.............

PATE :4/16/90

4/10/90
4/13/90
4/13/90
4/16/90
4/ /90 e.

OFC

NRR/ADP* )
D QRg
ED

/: Conc. b

..... 3s

..F_......:........_y FM with changes 4/18: {)(7.J._.

g.....:........

FAME :JPartlow

tiurley
JTa ob g(' 57 7,

p.....:...............:..............:..

RATE

4/16/90
4/01/90
44h6//90
Y 9o

'1 0FFICIAL RECORD COPY Document Name:

GREEN TICKET 05335 l

i l

  • v,,, = ' --

DISTRIBUTION.

i -

Docket File NRC PDR w/cy'of:-incoming Local PDR w/cy of incoming ED0#05335-ED0 Readind

., ~

-T. Murley/f.' Miraglia (12G18).

J;Partlow(12G18)f G.~Holahan-PD5 Reading w/cytof. incoming cC. Trarmell J. Zwolinski.

OGC GPA/CA-SECY l

J. Taylor D.,Mossburg, PMAS;(ED0#05335)'w/cy of incoming-l J. Tatum w/cy;of incoming P..Shea:

PD5 Green Ticket File F.Gillespie.,(12G18)

D. Crutchfield (7D24)

W.-Russell-.(PGN-1)

J. Martin '(RV)

-t I

s I

l q

4 1

._.-_i

4 The Honorable Ron Packard-2 It was the original intent of the AEC and is the current desire of the NRC to convert all POLS to FTOLs. We view conversion from a POL to an FTOL as a necessery step that should be completed as soon as possible, j

For your information, I have enclosed a copy of our Confirmatory Order dated January 2,1990, that pertains to the scheduling of FTOL open items applicable to San Onofre Unit 1.

If you have any further questions.on this' matter, please contact me.

Sincerely, James M. Taylor s

\\

Executive Director

\\

for Operations

\\

Enclosure:

\\

Confirmatory Order

\\

dated January 2, 1990

\\

\\

\\

4

  • See previous concurrence

\\

i

</e +

\\

/

p

/

OFC

DR5P/PD5
DR M' __5
TECH' EDITOR *
tA)DR
D:PD5 :(AJAD/

R R

r....

...___:.....'.........:dI/mmell 0.....:

BCalur'e
JZwolinski Holahan NAME -:PShea m:sg s.....:..........___.

...____...___:....2....__:.___...__.....:........._____:.............

? ATE

4 A @90
4//o/90
4/13/90\\
4/\\@/90

.:4/t k /90

4/// /90

/ \\

h i

0FC

NRR/ADP
D:NRR-
EDO s

e.....:___......

IAME

JPartlow
TMurley
JTaylor s

m.____:....___..______:_........__

% ATE

4/\\b/90
4/ /90 es:4/ /90

\\:

OFFICIAL RECORD COPY f# O!!#

Document Name: GREEN TICKET 0 385 l

l-

The Honorable Ron Packard

'-2 It was the original intent of the AEC and is the current desire of the NRC to' convert all POLS to-FTOLs.

As Southern California Edison Co. continues to /

resolve.the remaining FTOL open items, San Onofre Unit I will become inhersntly safer and the obstacles to POL /FTOL conversion will be removed. When the'HRC issues the FTOL, this action will indicate that improvements have been made to the features of the facility, thereby reducing the risk to the public ealth and safety. Therefore, we view conversion from a POL to an FTOL as necessary l

step that should be completed as soon as possible.

For your information, I hava enclosed a copy of our Confirmatory rder dated January 2, 1990, that certains to the scheduling of FTOL open i ems applicable to San Onofre Unit 1.

If you have any further questions on this atter, please contact me.

Sincerely, James M. Taylor /

Executive Dir'ector for Opera'tions

Enclosure:

/

Confirmatory Order

/

dated January 2,1990

/

/

/

  • See previous concurrence DFC
DRSP/PD5 iDRSV/PDB--~iTEtR TUTTDR*
(A)DRsP:D:PD5 :(AJAD/DR5P THRIUADPR-NAME :PShea
JTatum:sg
BCalure
CTrammell
JZwolinski
GHolahan
4/ /90
4/ /90

=:4/ /90 DATE :4/

/90

_,_ 4 / / 9,0,,,,

4/,1,3,/90 DTC-~~ilikTt7FD)""
0:HRR ~~ ~ ~~ E00 NAME. :JPartlow
TMurlef
JTaylor DATE :4/ /90
4// /90
4/ /90 OFFICIAL RECORD COPY Document Name': GREEN TICKET 05335 i

/

./

8 f

[

The Honorable Ron Packard /

It was the original intent of the AEC and the current desire of the NRC to

/

convert all POLS to FTOLs. As Southern California Edison Cc. cortinues to,'

resolve the remaining FTOL open items, San Onofre Unit I will become inherently safer and the obstacles to POL /FTOL conversion will be removed. When the<NRC issues the FTOL, this action will indicate that improvements have been made to the features of the facility, therby reducing the risk to the public health-and safety. Therefore, we view conversion from a POL to _an FTOL as a'necessary step that should be completed as soon as possible.

For your information, I have enclosed a copy of our ConfirmatorycOrder dated January 2,1990, that pertains to the scheduling of FTOL open items applicable to San Onofre Unit 1.

If-you have any further questions on this matter, please contact ne.

Sincerely, l

James M. Taylor' Executive Director for Operations

Enclosure:

Confirmatory Order

/

dated January 2,1990

/

/

f

/

/

PFC

DRSP/PDS 7 Dit W /f D 3
TF0H' EDITOR
(A)DRSP:D:PD5 :(A)AD/DRSP
NRR/ADPR f..... : _ _... _ _ _....... :.............. ;,dekt....... :.... _ _........ :....... _ _ _.... :.............

AME

PShea-
JTatum:sg
BCalure
CTrammell
JZwolinski
GHolahan L.....:....__..........:..............:.'.............:.________.__.:..............:._______.....

IATE

4/ /90
4/ /90

,:4/3/90

4/ /90
4/ /90
4/ /90 iFC
NRR/ADP iDiitilR

/

E00

......:................:......_..i._..:..............:.............:..............:.............

CNE

JPartlow
TMurley
JTaylor

,,,4/ //90

4/- /90

,, 1,,

BTE

4/ /90 0FFICIAL RECORD' COPY Document flame':

GREEN TICKET 05335

/

f'

/

/

/

/

,/

/

/

f

.j

/

[

'o, =

UNITED STATES

[

g_

~ NUCLEAR REGULATORY COMMISSION -

E WASHINGTON, D. C. 205% '

g,

't 0

(

+

%g * * * * ',[

EDO Principal Correspondence Control

[

PROM; DUE: 04/19/90 CDO~ CONTROL: 000533b DOC DT: 04/03/90 FIN (il ttEPLY:

no. Ron Packard 0

Chairo;.sn C$rr CRC'NO: 90-0345 FOR TIGNATURE-OF:

    • GRN Ekecutive' Director DESC:

ROUTING:

CONSTITUCNT, BETTY GEISMAR WANTG TO KNOW WHY JMartin, RV

-SOUTHERN CALIFORNIA EDISON. CO. HAS REUESTED THE NRC CONVERT-THEIR PROVISIONAL OPERATION LICENSE NO.'DPR-12 ON UNIT 1 TO A FULL-TERM OPERATING LICENSE DATE: 04/06/90 i

ASCIGNED T0; CONTACT:

NRR Murley

~

GPECIAL JNOTRUCTIONC OR REMARKS:

NRR RECEIVED: APRIL _6u1990 fACTIONE R HDRSP':HOLAHAN0l'ey L(I*

NRR ROUTING:

MURLEY/MIRAGLIA PARTLOW RUSSELL CRUTCHFIELD GILLESPIE ACTION 1

i 0

M0SSBUaG DUE TO NRR DIRECTOR's c i

BY -

](pl9gy-i t

/

p i

r

-t

-t-

> ;1

' OFFICE ~OF THE SECRETARY

CORRESPONDENCE CONTROL TICKET

. PAPER NUMBER:.

CRC-90-0345

. LOGGING.DATE: Apr 5:90 ACTION OFFICE:

EDO AUTHOR:

Ron;Packard

. AFFILIATION:

U.S. HOUSE OF REPRESENTATIVES-t

~ LETTER DATE:

Apr 3L90 FILE CODE:

SUBJECT:

Southern CA Edison Co. req for'their provisional operation license No..DPR-13 cn1 unit 1.to a. full-term operating license ACTION:

Direct' Reply DISTRIBUTION:

OCA to Ack, Chaihman.

SPECIAL HANDLING: None NOTES:

.DATE DUE:

Apr 21 90 L

SIGNATURE:

DATE SIGNED:

AFFILIATION:

9

(

h t

Md Off. EDO w w s 1s

=.

Time 9? 3 0 le EDO ~~- 005335

,-