Advises That 900405 Request for Either Denial of Exemption from Onsite Primary Property Damage Insurance Requirements of 10CFR50.54(w)(i) or Announcement of Intention to Defer Decision Until Fes on Decommissioning Proposal Denied
ML20034C436
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 04/27/1990
From: Murley T
Office of Nuclear Reactor Regulation
To: Mcgranery J
DOW, LOHNES & ALBERTSON
Shared Package
ML20034C437 List:
References
CON-#390-10541 NUDOCS 9005030266
Download: ML20034C436 (5)


Text

-

  • 5

'o UNITED STATES s,F' cf[,,n NUCLEAR REGULATORY COMMISSION f

C:

f W ASHINGT ON, D. C. 2065$

%.y April 27, 1990

....+

James P. McGranery, Jr., Esq.

Dow, Lohnes & Albertson 1255 Twenty-Third Street Washington, DC 20037-1194

Dear Mr. McGranery:

This letter acknowledges receipt of your submission dated April 5,1990, entitled "Fifth Supplement to the Section 2.206 Request by the Shoreham-Wading River Central School District and Scientists and Engineers for Secure Energy, Inc. in USNRC Docket No. 50-322." In this document, you stated that you are incorporating into your Petition filed pursuant to 10 CFR 2.206 on July 14, 1989, as supplemented July 19, 21, and 31,1989, and January 23, 1990, an enclosed "coment" to the Secretary of the Comission dated April 5,1990 In that "coment," you request the Comission to either (1) deny a request by the Long Island Lighting Company (LILCO) for an exemption from the on-site primary propertydamageinsurancerequirementsof10CFR50.54(w)(1)foroperationof the Shoreham facility)and withdraw its proposal to consider the issuance of this exemption, or (2 announce its inten' ion to defer decision'until after publication of a Final Environmental Impact Statement on the decomissioning proposal.

Based on a are11minary review of the concerns raised in your April 5,1990 letter, we lave concluded that neither of the actions proposed in your request would be appropriate for Shoreham in its present status. Our conclusions are based on the following factors:

1.

The property / accident recovery insurance regulations were implemented to provide an assured source of funds '9r cleanup after an accident at.an operating reactor (52 FR 28963. Aupt 5,1987 and as amended by 52 FR 12163, April 5 1990 The staff finds that the concerns related to cleanupfollowlngan)a.

ccident are not significant in the present status of Shoreham.

2.

The public health and safety concerns are significantly reduced for non-operating plants such as Shoreham.

3.

The staff has concluded that in the light of the present status of Shoreham, there will be no significant environmental impacts resulting from granting of the requested exemption, p%(

{8JP*%88n3288%g2 l

J mes Po McGranery, Jr., Esq. -

4 The National Environmental Policy Act arguments posed in your April 5, i

1990 letter are unpersuasive.

Accordingly, your requests in your letter dated April 5,1990, are denied.

The l

reasons for denial of your April 5,1990, requests will be more fully discussed in a separate Director's Decision.

Sincerely, originni Digned by, naus Es br1cf.

Thomas E. Murley, Director Office of Nuclear Reactor Regulation cc: Mr. William E. Steiger, Jr.

Assistant Vice President Nuclear Operations Long Island Lighting Company Shoreham Nuclear Power Station P.O. Box 618, North Country Road Wading River, New York 11792

)lSTRIBUTION

  1. 10ctet me 50-322M/iscomik 'ltr tmly1 NRC PDR w/ incoming ltr only Local PDR w/ incoming ltr only EDO(Ref.#4613) 1 EDO Reading TMurley/FMiraglia JPartlow SVarga BBoger WButler M0'Brien SBrown ETrottier CShira ki MVirgilio RWood DNash GPA/PA CSinyre, PMAS (ref. EDO #4613)

PDI-2 Reading JTaylor YYanez(2),W-501 CCater, SECY, 16H21 MMalsch, OGC LChandler, OGC ASLAB ASLBP ACRS(10)

EJulian, SECY, 16G15 Schidakel, OGC LDoerflein, R1

  • SEE PREVIOUS CONCURRENCE

~

PDI-2/PM PDV*

OGC*

PDI-2/D PDIII-l*

ADRI SBrown:mj GKalman JGoldberg WButler MVirgilio BBoger 04/24/90 04/23/90 04/24/90 04/24/90 04/24/90 04/24/90 DRP ADP SYarga JPartlow Tur;y 04/25/90 04/25/90 04

, 90 f,. (

l OFF Int RECORD COPY

[MCGRANERYLETTER) y

\\ \\

]

James P. McGranery, Jr., Esq. -

l 4.

The National Environmental Policy Act arguments posed in your April 5,1990 1etter are unpersuasive.

Accordingly, your requests in your letter dated April 5,1990, are denied. The reasons for denial of your April 5,1990, requests will be more fully discussed in a separate Director's Decision.

Sincerely, Thomas E. Murley Office of Nuclear, Director r

Reactor Regulation ec: Mr. William E. Steiger, Jr.

Assistant Vice President Nuclear Operations Long Island Lighting Company Shoreham Nuclear Power Station i

P.O. Box 618 North Country Road l

Wading River, New York 11792 l

1 l

1 I

l

j

,e.

Mr. James P. McGranery Shoreham Nuclear Power Station Long Island Lighting Company f

CC:

Victor A. Staffieri Esq.

MHB Technical Associates General Counsel 1723 Hamilton Avenue i

Long Island Lighting Company Suite K 175 East Old County Road San Jose, California 95125 Hicksville, New York 11801 6

Richard M. Kessel i

W. Teylor Reveley, 111. Esq.

Chairman & Executive Director Hunton & Williams New York State Consumer Protection Post Office Box 1535 Board 707 East Main Street Room 1725 Richmond, Virginia 23212 250 Broadway New York, New York 10007 Mr. Lawrence Pritt Shoreham Nuclear Power Station Jonathan D. Feinberg, Era.

Post Office Box 618 New York State Department Wading River, New York 11792 of Public Service Three Empire State Plaza Mr. Jack Notaro Albany, New York 12223 Plant Manager Shoreham Nuclear Power Station Fabian G. Palomino Esq.

Post Office Box 628 Special Counsel to the Governor Wading River, New York 11792 Executive Chamber - State Capitol t

Albany, NY 12224 Resident inspector Shoreham NPS Martin Bradley Ashare Esq.

U.S. Nuclear Regulatory Commission Suffolk County Attorney Post Office Box B H. Lee Dennison Building Rocky Point, New York 11778 Veteran's Memoria'i Highway Hauppauge, NY 11788 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Robert Abrams, Esq.

i 475 Allendale Road Attorney General of the State King of Prussia, Pennsylvania 19406 of New York ATTH: John Corwin, Esq.

Ms. Donna Ross New York State Department of Law New York State Energy Office Consumer Protection Bureau Agency Building 2 120 Broadway Empire State Plaza 3rd Floor Albany, New York 12223 New York, NY 10271 V

I

Long Island Lighting Company Shoreham i

CC:

Janes P. McGranery, Jr., Esq.

Leonard Bickwit, Jr., Esq.

I Dow, Lohnes and Alberson Miller & Chevalier, Chartered suite 500 Metropolitan Square 1255 23rd Street, N.W.

655 Fifteenth Street, N.W.

Washington, D.C.

20037 Suite 900 Washington, D.C.

20005-5701 Dr. A. David Rossin Resources Conservation Organization Suite 320 101 First Street i

los Altns, CA 94022 David J. McGoff Associate Deputy Assistant Secretary for Reactor Deploytnent U.S. Department of Energy i

r Washington, D.,C.

20545 Mr. William E. Steiger, Jr.

Assistant Vice President-Nuclear Operations Long Island Lighting Company Shoreham Nuclear Power Station P.O. Box 618 North Country Road Wading River, NY 11792 9

l e