ML20034C180
| ML20034C180 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 04/20/1990 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20034C181 | List: |
| References | |
| RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 9005020144 | |
| Download: ML20034C180 (3) | |
See also: IR 05000321/1990006
Text
he
dg
.
April 20, 1990--
-
,
i
9
Docket Nos.- 50-321,.50-366
License Nos. DPR-57, NPF-5-
Geu gia Power Company-
ATTN:
Mr. W.'G. Hairston, III
-
= Senior Vice President -
'
-Nuclear Operations
P. O. Box 1295
-Birmingham, Al. 35201
Gentlemen:
SUBJECT:
NRC' INSPECTION REPORT NOS. 50-321/90-06 AND 50-366/90-06-
This refers. to the Nuclear Regulatory Commission (NRC) inspection conducted by
M. D. Hunt' on March 5-9 and 19-23,- 1990.' . The. inspection included a review of
activities authorized for your Hatch facility. . At: the ' conclusion of: the
inspection, the findings were discussed with those members of..your staffe
j
,
identified in the enclosed Inspection Report.
j
.
Areas examined during the-inspection are identified in the report. .Within
j
these areas', the inspection consisted of selective examinations of- procedures
and -representative records, interviews with personnel, and observatio_n of
j'
activities in progress.
l-
Within the scope of the inspection, violations or deviations- were ~ not
identified.
In accordance with 10 CFR 2.790(a), a copy of this letter and-its enclosure
j
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
f
Sincerely,
I
Original Signed by
George A.:Belisle for
.
Caudle A. Julian, Chief
Engineering Branch
i
Division of-Reactor Safety
J
Enclosure:
NRC Inspection Report
i
i
,
I*
(
g
a
a
.rc o t
]
.
,
'e
.
'
.
Georgia Power Company
2
April 20, 1990
-
,
cc w/ encl:
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
c
Georgia Power Company
'
P. 0.- Box 1295
Birmingham, AL 3G201
J. T. Beckham
Vice President, Plant Hatch
Georgia Power Company
P. 0. Box 1295-
-Birmingham, AL 35201
H. C. Nix
General Manager, Plant Hatch
Route 1, Box 439
Baxley, GA 31513
,
S.
J.~ Bethay
Manager-Licensing - Hatch
Georgia Power Company
P.-0. Box 1295
Birmingham, AL 35201
'
Ernest L. Blake, Esquire
Shaw, Pittman, Potts and
Trowbridge
2300 N Street, NW
l
Washington, D. C.
20037
'
l
l
Charles H. Badger
Office of Planning and Budget
'
Room 610
270 Washington Street, SW
Atlanta, GA 30334
J. Leonard Ledbetter, Director
L
Environmental Protection Division
Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
Chairman
Appling County Commissioners
e
County Courthouse
Baxley, GA 31513
State of Georgia
bec w/ encl:
(See page 3)
,
-
.
4
.
t
'
.
.
April 20~,- 1990.
l
..
Georgia Power Company-
3
bec w/ enc 1:
L. P. Crocker, NRR
A. R. Herdt, RII
e
K. E Brockman, RII
-Document' Control-Desk
- i
'
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Routw 1, Box 725
_
Baxley, GA 31513-
Hugh S. Jordan, Executive Secretary
Georgia Public Service-Commission
244 Washington Street, SW
Atlanta, GA _30334
E. Merschoff
T. Conlon
M. Hunt
s .
!
!
!
,
!
!
!
RII:DR
RI
RIIDg
M dMt
TEConlo
KEBrpckman
1
'
04/p/90
04/ r/90
044 # 90
f
)
!
!