.In Reply Refer To:
!
<
Docket:- 50-285/90-19
- .
- -
y
, e
Omaha-Public Power District-
J
ATTN:-
W. G. Gates, Divisici Manager'
'
Nuclect Operations-
'
444 Scuth 16th Street Mall
,
Omahe, Nebraska - 68102-2247
i
,
- Gentlemen:-
,
.*
This refers to the-inspection conducted by L.. Ricketson of this' officeIduring .
1
4
-
the perio1 Maren 6-9, 1990, of' activities authorized byL NRC Operating .
1
,
License DPR-40 for the Fort Calhoun Station, and to the discussion l of our
t
-
findings witt Mr.. G. R. Peterson and'other members 'of your staff at- the-
J
,
'
conclusion:of the inspection.
.!.
Areas examined c'uring the inspection included-the' radiological environmental'
A
monitoring program.and the circumstances surrounding the ' entry of personnel.-
A,
into a very high radiation area. WithinLthese areas, the inspection: consisted.
of selective examination of procedures and representative. records,. interviews
'
with personnel, and observations by'the inspector.
The. inspection findings are -
-
documented in the enclosed inspection report..
4
During the inspection, it was found that certain of your activities were in-
H
violation of NRC requirements.
However, in accordance with 10 CFR Part'2,
.
-
Appendix C, Section-V.G.1 of.the NRC's~ Enforcement Policy, no citation:is being
issued for the self-identified violation described in paragraph 6 of the-
t
6
enclosed inspection report.
No deviations were identified.
.I
Should you have any questions concerning this inspection, we will be; pleased to
]
discuss them with you.
L
'
Sincerely,
L
Samuel J. Collins, Director
'i
Division of Reactor. Projects-
,
Enclosure:
'
l-
Appendix - NRC Inspection Report
1
L
50-285/90-19
l
,
cc w/ enclosures:
(See next page)
l
-.
t
L
RIV:FRPSg C:FRPS
- DRSS
D:DRP
i
L
LRickets'on
BMurray
BBeac4/
Collins
4 /a-/90
Q/.4/90
f /p /90
/PV'90
9005020067 900420
"
ADOCK 05000285
Q
. g (\\
.
~
.
.
..
.
.
.
.
.
'
..
f:
s
8
(
_,;
'
t
- .
,
.
..
-l
'
Omaha Public Power District
-2 "
, . ,
ni
.. .
.
.
.
1
'LeBoeuf,. Lamb, Leiby & MacRae
1
' ATTN: Harry H. Voigt, Esq.
.t
ij
'1333 New Hampshire Avenue, NW
Washington, D.C.
20036
,,
!
Washington County Board
'
of Supervisors
(
' ATTN:- Jack-Jensen, Chairman
lj
Blair, Nebraska 68008
p
,
'
. Combustion Engineering', Inc,
.
' ATTN: . Charles B. Brinkman, Manager
!
'
Washington Nuclear Operations
+
12300 Twinbrook Parkway, Suite 330
-
Rockville, MD 20852
i
Department of Health
ATTN: Harold Borchert, Director
>
!
Division of_ Radiological Health
'
301 Centennial Mall, South
P.O. Box 95007
-r
Lincoln, Nebraska 68509
}
'
Fort Calhoun Station
ATTN:
G. R. Peterson, Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
U.S. Nuclear Regulatory Commission
ATTN: Resident Inspector
P.O. Box 309
Fort Calhoun, Nebraska 68023
I
U.S. Nuclear Regulatory Commission.
'
ATTN:
Regional Administrator, Region IV
611 Ryan Plaza Drive, Suite 1000
-
Arlington, Texas 76011
,
bec to DMB (IE06) - FRPS
bec distrib. by RIV:
'
'
- R. D. Martin
- Resident Inspector
'
- DRSS-FRPS
- Section Chief (DRP/$)
,
- MIS System
- RIV File
- DRP
- RSTS Operator
4
- Project Engineer (DRP/$)
Lisa.Shea, RM/ALF
- DRS
j
- A. Bournia, NRR Project Manager (MS:
13-D-18)
- w/766
-
,
.
.
-
,