ATTACHMENT 2-l PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 Docket Nos. 50-277 50-278 l
License Nos. DPR-44 DPR-56 TECHNICAL SPECIFICATION CHANGES t
List of Attached Pages Unit 2 Unit 3 iva iv vil vii 243 243 244 244 245 245 245a 245a i
l 246 246 252 252 252a 252a 9004300248 900420 ADOCK0500p,g"g8 PDR P
PBAPS Unit 2
' LIST OF FIGURES Figure Title Page i
3.5.1.I MAPLHGR vs. Planar Average Exposure 142h Unit 2, P8X8R Fuel,-Type P8DRB284H, 80 mil & 100 mil channel &-120 mil channels 3.5.1.J MAPLHGR vs. Planar Average Exposure 1421-Unit 2, P8X8R and'BP8X8R Fuel,-Type P8DRB299 and,BP8DRB299, 100 mil channels 3.5.1.K MAPLHGR vs. Planar Average Exposure 142j Unit 2, P8X8R Fuel (Generic)'
3.5.1.L MAPLHGR vs. Planar Average Exposure 142k Unit 2, BP8X8R Fuel, Type BP8DRB299H i
3.5.1.M MAPLHGR vs. Planar Average Exposure 1421' Unit 2, GE8X8EB Fuel,-Type BD319A-3.5.1.N MAPLHGR vs. Planar Average. Exposure 142m-Unit 2, GE8X8EB, Type BD321A i
3.5.1.0 MAPLHGR vs. Planar Average Exposure 142n Unit 2, GE8X8EB, Type LTA310 3.6.1 Minimum Temperature for Pressure Tests 164 such as required by.Section'XI 3.6.2 Minimum Temperature for Mechanical Heatup
-164a or Cooldown following Nuclear Shutdown 3.6.3 Minimum Temperature for Core Operation 164b (Criticality).
9 3.6.4 Deleted 164c 3.6.5 Thermal Power and Core Flow Limits 164d 3.8.1 Site Boundary and Effluent Release Points 216e 6.2-1 Deleted 6.2-2
. Deleted
-iva-
Unit 2
^
PBAPS i
LIST OF TABLES Table' Title Page 4.8.3.c Maximum Values for Minimum Detectable.
-216d-6 i
Levels of Activity J
3.14.C.1 Fire Detectors 240m 3.15' Seismic Monitoring Instrumentation 240u 3.15 Seismic Monitoring Instrumentation-240v Surveillance Requirements 6.2.1 Shift Crew Composition-Minimum
.245 Requirements i
i
+
0 vil 1
Unit 2
)
9 l
Table 6.2.1 l
l Shift _ Crew Composition - Minimum Requirements
- l l
l One or Both Units Operating *:
1 Shift Manager (SRO)
I 1 Shift Supervisor (SRO) 3 Reactor Operators-(RO)
L 5-Operators 1 Shift Technical Advisor Both Units not Operating
- 1 Shift Manager or Shift Supervisor (SRO) 2 Reactor Operators (RO) 5 Operators SRO - NRC licensed senior reactor operator RO - NRC licensed reactor operator i
l 0
For the purpose of this table, a unit is considered not to be operating when it is in a Cold Condition with the reactor mode switch in shutdown or refuel.
1.
i
-245-
Unit 3' PBAPS-LIST OF FIGURES j
Figure Title Page l
1.1-1 APRM Flow Bias Scram Relationship To Normal 16 Operating Conditions i
4.1.1 Instrument Test Interval Determination Curves 55 I
4.2.2 Probability of System Unavailability vs. Test 98 Interval 1
3.3.1 SRM Count Rate vs. Signal-to-Noisa Ratio' 103a L
3.4.1 DELETED 122 l
3.4.2 DELETED 123 3.5.K.1 MCPR Operating Limit vs. Tau, BP/P8X8R, LTA, 142 GE8X8EB Puel, Standard Operating Conditions-3.5.K.2 MCPR Operating Limit vs. Tau, BP/P8X8R, LTA, 142a GE8X8EB Fuel, Increased Core-Flow 3.5.1.A DELETED 3.5.1.B DELETED 3.5.1.C DELETED 3.5.1.D DELETED 3.5.1.E Kf Factor vs. Core Flow 142d 3.5.1.F MAPLHGR vs. Planar Average Exposure, Unit 3, 142e GE8X8EB Fuel (Typ3 BD 319A) 3.5.1.G MAPLHGR vs. Planar Average Exposure, Unit 3, 142f GE8X8EB Fuel-(Type BD321A) 1 3.5.1.H MAPLHGR vs. Planar Average Exposure, Unit 3 142g P8X8R Fuel (P8DRB284H) 3.5.1.1 MAPLHGR vs. Planar Average Exposure, Unit 3 142h P8X8R and BP8X8R Fuel (P8DRB299 and BP8DRB299) 3.5.1.J MAPLHGR vs. Planar Average Exposure, Unit 3 1421 BP8X8R Fuel (BP8DRB299H) l 3.5.1.K MAPLHGR vs. Planar Average Exposure, Unit 3 142j P8X80 LTA (P8DOB326) 3.6.1 Minimum Temperature for Pressure Tests such as 164 required by Section IX 3.6.2 Minimum Temperature for Mechanical Heatup or 164a Cooldown following Nuclear Shutdown 3.6.3 Minimum Temperature for Core Operation 164b (Criticality) 3.6.4 Transition Temperature Shift vs. Fluence 164c 3.6.5 Thermal Power Limits of Specifications 164d 3.6.F.3, 3.6.F.4, 3.6.F.5, 3.6.F.6 and 3.6.F.7 3.8.1 Site Boundary and Effluent Release Points 216e 6.2-1 DELETED 6.2-2 DELETED l
l
-iv-
Unit 3-
-l PBAPS~
i l
LIST OF TABLES I
i l
Table Title Page
~
4.8.3.c Maximum Values for Minimum Detectable-216d-6 Levels of Activity 3.14.C.1 Fire Detectors' 240m 3.15 Seismic Monitoring Instrumentation.
240u 4.15 Seismic Monitoring Instrumentation 240v Surveillance Requirements l
6.2.1 Shift Crew Composition-Minimum 245 l
Requirements I
i i
l i
l l
l 1
vii
, Unit 3 I
e, r
l Table 6.2.1 l.
Shift Crew Composition - Minimum Requirements.
I~
t o,
One or Both Units Operating *:
1 Shift Manager (SRO) l' Shift Supervisor _(SRO) 3-Reactor Operators (RO) 5 Operators
?
1 Shift Technica1' Advisor Both Units not Operating
- 1 Shift Manager-or Shift Supervisor (SRO).
2 Reactor Operators (RO) i 5 Operators s
SRO - NRC licensed senior reactor operator RO - NRC licensed reactor. operator For the purpose of this table,-a unit is considered not to be operating when it is in a Cold Condition with the reactor mode switch in shutdown or refuel.
l l
1 l
l i
-245-