ML20034B438
| ML20034B438 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/19/1990 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mckee P Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9004270156 | |
| Download: ML20034B438 (2) | |
Text
- - - - -
p BAFEGUARDS FNFORMAT10N s
'g..
APR49 -1999 y,
[
l\\
a..
o)
W-e 4
y MEMORANDUM FOR:,
Phil. lip F. McKee, Chief,
07 7
sSafeguards" Branch, Division of Reactor Inspection and, Safeguards NRR C
gs FROM:
1 Robert'J. Pate,JChiSf Nuclear Materials ~ Safety and
. Safeguards Branch, DRSS
SUBJECT:
REQUEST-FOR: HEADQUARTERS REVIEW 0F CHANGE TO SECURITY PLAN-FOR SAN 0N0FRE NUCLEAR GENERATING STATION (SONGS)-
DNS:- 50-206',~50-361, AND 50-362
REFERENCES:
a). Southern California Edison Company-(SCE) Letter to NRC;
Subject:
Docket Nos. 50-206, 50-361 andtS0-362,-10 CFR 50.54(p) Changes, Temporary _ Unescorted Access:
Authorization, Physical Security Plan, Revision 27,ESan--
Onofre Nuclear Generating Station; dated March 28, 1990.
b)
Arizona Public Service Company (APS) letter'to NRC;
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units'1, 2, and 3, Supplemental Information for Proposed Security Plan Amendment, File:'90-006-493, 90-056-026;
' dated February 21, 1990.
i c)
NRC Letter from the Acting Director, Project Directorate l
V, Division of Reactor Projects III,'IV,-V and Special Projects, NRR, to APS; dated March 2,1990; in response to a
L reference b) above.
During our review-of the SONGS Physical Security Plan -(PSP) revision 27 '
submittal forwarded by reference a)'above, we notedlthat the. proposed. changes' to this plan appear to qualify as;50.54(p) changes. However, some of the changes require action at the Headquarters level since there-appear-to be.
6 potential policy implications. While the changes appear to reflect potential downgrades from previous PSP commitments; substantively identical changes submitted by reference b) above were found consistent with the provisions of-10 CFR 50.54(p) by NRC in reference-c).above. 'Accordingly, this submittal is forwarded for appropriate action' by your office.
a 9004270156 900419 PDR ADOCK 05000206 PDC
(
F l U M 5W2 CoNTAIns l
SM2 GUM:DsMropyAgg3"
[
l _ D rdPARATION Tm,i g =m umm.
4' sArP3U AlllDS INFORMABON 1
l
"^
.(
+
w y
4 P. McKee
- -21 0903 We have discussed our referral ~ with E. McPeek of.your staff and'hav'e notified the licensee of the transfer of review responsibilities from the Regional' Office to Headquarters. ' A copy of our letter informing the= licensee is:
- enclosed, original signed by ?
h/
Robert J. Pate, Chief-4Whuclear Materials Safety and Safeguards Branch, RV-
Enclosure:
Region V's Coninents on Rev.= 27 CONTACTi A.D.McQueen(FTS-463-3770) hue NO
!YE
[YE
)
~
END TPDR,
fE
/NO
]
RV DC_5 fr'){.
AMcQueen/cb' MSchuster
% Pate 4/ ) @ /90 4/ l} /90
' 4/lq /90 i
- 6) g.wc0'""'
^
b V
e y
f