ML20034B316
| ML20034B316 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/23/1990 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20034B317 | List: |
| References | |
| NUDOCS 9004270004 | |
| Download: ML20034B316 (4) | |
Text
ll l
,
- Duke hwar Company flat il Tyw yo ng 33;ps
>ke hrside rst Charlotte, N C 28:4 Nuclear hudatain (7th )373 4531 DUKEPOWER April 23, 1990 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 i
Proposed Technical Specification Amendment Technical Specification 4.9.11.2 Gentlemen:
Please find attached a proposed amendment to Technical Specification 4.9.11.2.
This change will require that the laboratory test of the carbon samples from the fuel Handling Ventilation Er.haust System be tested per ASTM D3803 86 Test Method "A", for a methyl iodide penetration of less than 0.71%.
Attachment I contains the marked up TS and Bases pages. Attachment !!
contains a discussion, Technical Justification, no Significant Hazards Analysis, and an Environmental Impact Statement.
Pursuant to 10 CFR 50.91(b)(1) the appropriate South Carolina State Official is being provided a copy of this amendment request.
Very truly yours, d 8.
A H. B. Tucker MHH26/td 0004270004 900423 ADOCKODOOg3 DR l
j##/
//t
7-i i
U. S. Nuclear Regulatory Commission April 23, 1990 l
Page 2 cc:
Mr.'S. D. Ebneter.
Regional Administrator U. S. Nuclear Regulatory Commission.
Region II 101 Marietta Street, NW, Suite 2900 Atlanta, GA 30323 Mr. Heyward Shealy, Chief Bureau of Radiological Health.
South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 American Nuclear Insurers e/o Dottie Sherman, ANI Library The Exchange,. Suite 245 270 Farmington Avenue Farmington, CT 06032 M & M Nuclear Consultants 1221 Avenue of the-Americas New York, New York 10020 INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339 Mr. W. T. Orders NRC Resident Inspector Catawba Nuclear Station Dr. K. N. Jabbour Office of Nuclear Regulation U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 14H25 Washington, DC 20555
U. S. Nuclear Regulatory Commission April 23, 1990 Page 3 Hal B. Tucker, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the Catawba Nuclear $tation Technical Specifications, Appendix A to License Nos. NPF-35 and NPF-52; and that all statements and matters set forth therein are true and correct to the best of his knowledge.
"bk h-
/
'Hal B. Tucker, Vice President Subscribed and sworn to before me this 23rd day of April, 1990.
Lb2 ku0.&
Wotafy Publ i c ' ' './
s o intises, o
My Commission Expires:
h..L #
f u., 9, M / ! % " 2 ~ > *.)
- Uet sc, j i
M' 5
8
<>,.CC s
.. io e
r l
l l
uo,3
,4 Aw A4.um.n.wawwcewv v' wwve%uum u# %e%v s
,4vi
< m p m % % w
~w v.u w,gs A s1%m%,.
g._
)
1
+
4 l
t i
4 r
A s
1i 3
f ATTACHMENT I
.i 1
1 1
4'I
)
T t
F
-m
!v s
f t
(
[
c e
I h
k k
V a
'$t (r
c t
fs s
~[.
-V F
F w
I
-s F
g I
-r
..n
,w
~
. ~
-.