APR 20 ION
.-
- In Reply Refer To:
1
Docket: 50-298/90-09
l
Nebraska Public Power District
ATTN: George A. Trevors
Division Manager - Nuclear Support
y
P.O. Box 499
o
Columbus, Nebraska 68602-0499
-j
Gentlemen:
1
This refers to the inspection conducted by Mr. C. J. Paulk of this office.
3
during the period April 2-6, 1990, of activities authorized by NRC Operating
1
License DPR-46 for Cooper Nuclear Station, and to the discussion of our
findings _ with members of your staff at the conclusion of the . inspection.
.
"
This inspection examined the area ~of instrumentation calibration. Within this.
area, the inspection consisted of selective examination of: procedures and
,
representative records, interviews with personnel, and observations by the
inspector. The inspection findings are documented in the enclosed inspection
,
report.
"
During the course of the inspection, two commitments were made to the NRC by
e
Nebraska Public Power District (NPPD). These commitments, related to the
,
modification of taped electrical splices'in harsh environments:and the revision
of the procedures for the. installation of taped splices, are discussed in
'
paragraph 3 of the enclosed report'.
If your understanding of the NPPD commitments
differs from those stated in this report, we request that you ir. form us within
.
30 days of the date of this letter.
t
Within the scope of the inspection, no violations or Wsietions were
j
identified.
r
i
Should you have any questions concerning this inspection, we will be pleased 'to
discuss them with you.
Sincerely,
[
Original Signed By:
Samuel J. Collins
$1nnuel'J. Collins, Director
Division of Reactor Projects
i
Enclosure:
(seenextpage)
RIV:RI:PSS
C:PS
D:DRS
q CPaulk:1b
TStet a
LyCallan /,q
C
s
~
81/n /90
g4/0/90
'l/p/90
k /p/90
/0'
i
1
pnema
m
,
l
{.
..
-
,
f
,
1
-
-
..
.-
Nebraska Public Power District
-2 -
L
I
Enclosure:
'
l
Appendix - NRC Inspection Report
'
50-298/90-09
cc w/ enclosure:
)
Nebraska Public Power District
ATTN:
G. D. Watson, General Counsel
,
P.O. Box 499
>
Columbus, Nebraska 68601-
Cooper Nuclear Station
,i
ATTN: -Guy R. Horn, Division
,
Manager of Nuclear Operations
<
P.O. Box 98
.
Brownville, Nebraska 68321
Nebraska Department of Environmental
Control
-ATTN: Dennis Grams, Director
P.O. Box 98922
Lincoln, Nebraska 68509-8922
Nemaha County Board of Commissioners
<
ATTN: Larry Bohlken, Chairman
Nemaha County Courthouse
-:
1824 N Street
'
L
Auburn, Nebraska 68305
Department of Health
j
Division of Radiological Health
i
!
ATTN: Harold Borchart, Director
l-
301 Centennial Hall, South
'
P.O. Box 95007
Linceh,, Nebraska 68509-5007
Kansas Radiation Control' Program Director
U.S. Nuclear Regulatory Comission
!
ATTN: Senior Resident Inspector
l --
P.O. Box 218
l-
Brownville, Nebraska 68321
l
1
l
U.S. Nuclear Regulatory Commission
l-
ATTN: Regional Administrator, Region IV'
i
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas 76011
!
E
L
1
L
J
i
a
-r
'
'-
. . . .
'
.
Nebraska Public Power District
-3-
1
bectoDMB(IE01)
bec distrib. by RIV:
,
- R. D. Martin
- Resident: Inspector
- SectionChief(DRP/C)
Lisa Shea, RM/ALF
- DRSS-FRPS
- MIS 1 System .
- RIV File
- ProjectEngineer"(DRP/C)
- RSTS Operator
- DRP
- P.O'Connor,NRRProjectManager(MS:
13-D-18)
- DRS
- C. Paulk
- T. F. Stetka-
- w/766
l
.
.,
.
,
4
I
,
!
' -
-
-.-
-
-
..
-..
. . , , , , ,
. , .
. . . . .
.. ..
.