Docket Nos. 50-352
50-353
,
Philadelphia Electric Company
'
ATTN: Mr. C. A. McNeill, Jr.
'
Executive Vice President
Nuclear
Correspondence Control Desk
P. O. Box 195
e
Wayne, PA 19087-0195
'
Gentlemen:
.
Subject:
Inspection Nos.'50-352/90-10 and 50-353/90-09:and Meeting No. 90-33
on Licensed Operator Requalification Program
.
This letter refers to the special safety inspection conducted by Mr. T. Eas11ck
of this office from February 12, 1990, to March 2, 1990, at the Limerick Generating
Station, Units 1 and 2 in Sanatoga, Pennsylvania. The findings were discussed
-
with members of your staff at the conclusion of the inspection-on March 2 and
"
March 15, 1990 at the Region I office.
Areas examined during this inspection are described in the NRC Region I
,
inspection report which is enclosed with this letter. Within these areas, the
inspection consisted of a review of the Limerick requalification examinations
administered from Jc. mary 15, 1990, to February 23, 1990 and a review of selected
Emergency Operating Procedures (T-200 series). Within the scope of this in-
spection no viola +1ons or deviations were observed.
.
Your attention is directed to paragraph 4 which identifies requalification
program weaknesses. This information is being provided to aid in up pading
the program.
No licensee response is necessary.
This letter also forwards the results of a management meeting held on March 15,
1990 at the Region I Office, King of Prussia, Pennsylvania.
The meeting was
i
conducted by myself with members of yove staff. The purpose of the meeting was
l
to discuss your root cause analysis anci proposed corrective actions as documented
'
in PECO letter dated March 9, 1990. The letter addressed the weaknesses-
identified as a result of an NRC administered operator requalification examina-
tions. On the-basis of the presentation during the meeting, the corrective
L
actions are acceptable. The results of the root cause analysis indicated that
although corrective actions were taken as a result of the November, 1988 NRC
administered requalification examination, in certain instances the actions were
l
ineffective.
The weaknesses identified during the January 1990 requalification
l
examination were attributed, in part, to insufficient management attention to
,
t
the requalification process.
t
OFFICIAL RECORD COPY
CIR LIMERICK 90-09/10 - 0001.0.0
,P004250094 900417
t
ADOCK 05000352
04/17/90
O
i
h
$ft
'
.
.
.
,
.
.
Philadelphia Electric Company
2
Confirmatory Action Letter (CAL) I-90-003 dated February 9,1990, detailed
three PECO actions to. ensure that weaknesses in the Limerick licensed operator
requalification program were promptly corrected and that adequate proficiency
of licensed operators is maintained at the. Limerick Generating Station Units 1
and 2.
These actions were completed with the submittal of the root cause analysis
and the proposed corrective actions on March 9, 1990.
Future inspections will
verify the implementation of these corrective actions.
"
In accordance with 10 CFR 2.790 of the' Commission's regulations a copy of this
letter and the enclosed report will be placed in the NRC Public Document Room.
No reply to this letter is required. Should you have any questions, please
contact myself or Mr. R. Gallo, Chief, Operations Branch at (215) 337-5291.
>
Sincerely.
Original Signed By:
i
Marvin W. Hodges
,
Marvin W. Hodges, Director
Division of Reactor Safety
Enclosure: Combined Inspection Report Nos. 50-352/90-10 and 50-353/90-09 (and'
Meeting No. 90-33)
'
'
cc w/ enc 1:
R. J. Lees, Chairman, Nuclear Review Board
t
l
G. M. Leitch, Vice President - Limerick Generating Station
D. R. Helwig, Vice President - Nuclear Services
S. J. Kowalski, Vice President - Nuclear Engineering
J. W. Durham, Sr., Vice President and General Council
M. J. McCormick, Jr., Manager - Limerick Generating Station
l-
G. A. Hunger, Jr. , Director - Licensing Section
'
J. Doering, Project Manager - Limerick Generating Station
J. F. O'Rourke, Manager - Limerick- Quality Division
T. B. Conner, Jr. , Esquire
-
G. J. Madsen, Regulatory Engineer - Limerick Generating-5tation
Public Document Room (PDR)
l
Local Public Document Room (LPDR)
'
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
I
i
,
,
OFFICIAL RECORD COPY
CIR LIMERICK 90-09/10 - 0001.1.0
04/17/90
'
.
-
- -
.
-
_ _ _
_ _ _ _ - _ _
_
.
..
.
.
.
..
..
..
.
'
.
l
.
l
.
.
Philadelphia Electric Company
3
bec v/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
R. Conte, DRS
T. Easlick, DRS
D. Florek, DRS
DRSFiles(4)
Section Chief, DRP
l
l
Alb
l'
RI:DRS
RI:DRS
RS
RI:DR
RI:DRS
Easi ek/ajk
Cont
Gall
Joh ton
Hodges
04/C/90
04/8790
04/ /90
0/ /90
04////90
0FFICIAL RECORD COPY
CIR LIMER'r.X 90-09/10 - 0002.0.0
04/06/90
l
_ - _ _ _ _
.
_ _ _ _ _ _ _ _ -
_
~