ML20034A925

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 900226-0305.Violation Noted:On 900120 & 21,mechanic Failed to Implement Paragraph 7.1.2 of Procedure PMQ-600-023,resulting in Installation of Three Asco Ac Solenoid Valves Which Subsequently Failed
ML20034A925
Person / Time
Site: Limerick Constellation icon.png
Issue date: 04/13/1990
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20034A920 List:
References
50-352-90-07, 50-352-90-7, NUDOCS 9004250071
Download: ML20034A925 (1)


Text

1._

J b

APPENDIX A NOTICE OF VIOLATION Philadelphia Electric Company-Oceket/ License Nos.:

50-352/NPF-39 Limerick I As a result of an inspection conducted from February 26, 1990 through March 5, 1990, and in accordance with the NRC Enforcement Policy (10CFR Part 2 Appendix C), the following violation was identified.

Plant Technical Specification 6.8.1 requires written procedures to be established, implemented and maintained to control various plant activities.

Preventive maintenance procedure PMQ-600-023, " Preventive Maintenance Procedure for Replacement of EQ ASCO Solenoid Valves (Generic)," paragraph 7.1.2, states " insure the replacement solenoid valve and the installed solenoid valve name plate data agree or an approved. equal has been provided."

Centrary to the above, on February 20 and 21, 1990, during the replacement of solenoid operated valves in the Unit I reactor core isolation cooling system the mechanic failed tu implement paragraph 7.1.2 of procedure PMQ-600-023 resulting in the installation of three ASCO A/C Solenoid Valves in lieu of the required ASCO D/C Solenoid Valves. All three solenoid valves subsequently failed.

This is a Severity Level IV Violation (Supplement I).

Pursuant to the provisions of 10CFR 2.201,, Philadelphia Electric Company is hereby required to submit to this office within 30 days of the letter which transmitted this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results l

achieved; (2) corrective steps which will be taken to avoid further l

violations; and (3) the date when full compliance will be achieved. Where l

good cause is shown, consideration will be given to extending this response

time, i

l l

0FFICIAL RECORD COPY CIR LIM 90-07/06 - 0003.0.0 04/13/90 90042sooy 9hj g}

$DR ADocg o g

PDC