ML20034A636

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-461/90-07 on 900326-29.No Violations Noted
ML20034A636
Person / Time
Site: Clinton 
Issue date: 04/13/1990
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20034A637 List:
References
NUDOCS 9004240031
Download: ML20034A636 (2)


See also: IR 05000461/1990007

Text

o

,

4

.

j

,

.

,.

APR 1 't 1990

'

,

i

,

Docket No. 50-461

Illinois Power Company

'

ATTN:

J. S. Perry

Vice President-

Clinton Power Station

'

Mail Code V-275

P. O. Box 678

Clinton, IL 61727

1

Gentlemen:

'

,

This refers to the special safety inspection conducted by Mr. M; J. Kopp of

,

this office during March 26-29, 1990, of activities regarding previously.-

4

identified environmental qualification (EQ) violations and concerns at the

Clinton Nuclear Power. Station authorized by NRC Operating' License No. NPF-62

and to the discussion of our findings with Mr. J. S. Perry at the conclusion of

the inspection.

,

-The enclosed copy of our inspection report identifies. areas examined during

l

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

-

.

No violations of NRC-requirements were identified during~the course of this

inspection,

in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of-

,

this letter and the enclosed inspection report will be placed in the NRC-

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by Mark A. - Ring

Mark A. Ring, Chief

Engineering Branch

Enclosure:

Inspection Report

.No. 50-461/90007(DRS)

See Attached Distribyf,4cn

'

Rlll

RI

Rill

Ril

'

-

/D

sc

Q.\\D 6 cit

/)T

. opp /jk

hPe

y

Gardner

Ring

04/12/90

04/ /J/90

04/s2./90

04/13/90

\\

9004240031 900413

<

,

DR

ADOCK 0500

1

J

.

.

.

.

i

Illinois Power Company

2

APR 131993

,

>

Distribution

,

cc w/ enclosure.

J. Cook, Manager, Clinton Power, Station'

a

F. Spangenberg, Ill, Manager -

Licensing and Safety-

l

DCD/DCB(RIDS)

Licensing Fee _ Management Branch

!

Resident inspector, R111

'

J. Hickman,-NRR

J. McCaffrey, Chief, Public

Utilities Division

H. Taylor, Quality Assurance

i

Division, Sargent & Lundy

Engineers

Patricia O'Brien, Governor's

Office of Consumer Services

.;

S. Zabel, Esquire, Schiff, Hardin,_

& Waite

L. Larson, Project Manager,

4

General Electric Company

t

Chairman, DeWitt County Board'

Illinois Department of

Nuclear Safety

.

4-

.