Forwards Insp Rept 50-344/90-05 on 900226-0302.No Violations Noted.Implementation of 1989 Requalification Program Deficient W/Respect to Grading Written Exams of Licensed Operators
ML20034A358
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/28/1990
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Walt T
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20034A359 List:
References
NUDOCS 9004230118
Download: ML20034A358 (3)


See also: IR 05000344/1990005

Text

_

_

_

_

_

_

c,

'

.

.

.i

/as uouq'o,

UMTED STATES

J

8'

R'

,e

NUCLEAR REGULATORY COMMISSION

l*

ff

'

NGsON r

Q,

a

1460 MARIA LANE,SUIfi .S0

<

WALNUT CREE K, CALIFORNI A 94696

% . . . + ,cI

MAR 2 81990

l

Docket No. 50-344

L

Portland General Electric Company

121 SW Salmon Street, TB-17

'

Portland, Oregon 97204

Attention:

Mr. T. D. Walt

I

l

Acting Vice President, Nuclear

,

Gentlemen:

i

SUBJECT: NRC INSPECTION OF THE TROJAN NUCLEAR PLANT AND MANAGEMENT

'

MEETING WITH LICENSEE ON MARCH-5, 1990

.

'

This report refers to the special unannounced inspection by Mr. D. B. Pereira-

of this office on February 26, 1990 through March 2, 1990, of activities

authorized by NRC License No. NPF-1.

Findings were-discussed with members of

your staff at the conclusion of the inspection on March 2, 1990.

In addition,

j

this report addresses the issues that were discussed in the management meeting

heldintheRegicaVofficesonMarch5,.1990withTrojanManagementand

Region V personnel.

1

Areas examined during this insaection are described in the enclosed inspection

report.

Within these areas, t1e inspection consisted of selective

examinations of )rocedures and representative records,-interviews with

t

personnel, and caservations by the inspector.

Based on the results of this insaection, no violations or deviations of NRC

P

requirements were identified wit 11n the scope of this inspection. ' However,

your implementation of the 1989 Requalification Program was deficient with

i

respect to grading the written examinations of licensed operators'.

Your

'

original regrading process, conducted by a single individual for both review

and approval, had limited management involvement and procedural controls.

It is an encouraging sign'that this weakness was identified by your Quality

.

o

Assurance Department, in an audit of the Requalification Program in January

i

'

1990. This audit determined that four licensed operators', originally passed

l

by PGE, should have failed their 1989 requalification examination. 'This

.

.

effective self-criticism by PGE significantly mitigates the program deficiency

l

l

identified.

Further, at the management meeting on March 5, 1990, PGE adequately addressed

l

the root cause of this incident, namely insufficient' procedural controls and

direct management involvement.

You confirmed that all four operators who were

incorrectly passed had been removed from further licensed duties until they

had passed a comprehensive annual examination as required.

The NRC will follow up on your corrective actions during a previously

scheduled NRC requalification examination to be conducted in April,1990.

The

'

.

9004230118 900328

\\k

ADOCK 0%y4

DR

ZFM

--

-

-

.

. .

-

-

o

.

.

.,

'

.

MAR 2 81990

-

-

.

2

l

l

1

NRC has requested 5-6 individuals out of the 11 original failures be examinea

-

!

in the April, 1990 Requalification Program and that the three individuals who

failed both (or failed one and nearly failed the other, in one case) the 1988

and 1989 requalification exams be examined again in the 1990 NRC examination.

[

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will bt- placed in the NRC Public Document Room.

No response to this letter is required, but should you have any questions

concerning this inspection,-we will be pleased to discuss them with you.

-

Sincerely,

R. P.

erman, Director

Division of Reactor Safety and Projects

,

Enclosure:

(1)

Inspection Report No. 50-344/90-05

(2) Viewgraphs of Management Meeting

cc w/ enclosure:

Scott Bauer, Branch Manager

C. P. Yundt, General Manager

-

L. A. Girard, Vice President and General Counsel

l

D. Stewart-Smith, Siting and Regulations ODOE

l

'

!

i

'

1

i

'!

I

'

.

i

.I

4

)

!

-i

l

~

-

.

n

!:s .:; -

c

. -

.

c..'.

<

. - -

l

lihR281993

,

'

L

. - .

'

3

4

,

, ,

bec w/ copy of enclosures:

Docket File

i -

-

,.

Resident Inspector

~

.

ProjectInspector

-

G.. Cook

,

4 .

B. Faulkenberry

-

".

J. Martin

Nt Western

-

o

, ,

,

bec w/o enclosures:-

- .

'

'

- !

M. Smith

.

'

J. Zo111 coffer

N

REGION V

/

4t

'

>

<

DPereira

-

L iller

MMendonca

DKi

5ch

RPZimmerman

90

3/z4/90

J 4 /90

.,3 /96/90

1,f2g90

REQti 5T COPY ] REQUEST

Y ] REQUEST CQPY_]

EQUEST COPY _7 REQUEST GQPY ] iES [)/

.YES)/

N0

3 YES / .NOT

]/

NO

] YES -/ NO

]- YES / (RQ)

=]

_-

-

-

ESf, TO PDR J':

-

'

/ NO

,]

I

i

i

1

5

%

s

. 'i