123 Main Street
'i
. ' White Plains,NewWrk10601 914 6816240
-[
{
I OWbrkNWer Jahac Draa' 4# Authority ll%"cE*,.Tf*"'
April 4, 1990 JPN-90-029 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mall Station P1 137 Washington, D.C. 20555 P
SUBJECT:
James A. FitzPatrick Nucleer Power Plant Docket No. 50-333 Proposed Changes to the Technical Specifications Regarding Deletion of Time Delay for HPCI and RCIC Automatic Isolation (JPTS-89022)
REFERENCES:
1.
LER 89-008-00, dated June 16,1989, "H_igh Pressure Coolant injection and Reactor Core Isolation Cooling Made Inoperable due to Procedure Deficiency Causing Missed Surveillance"
Dear Sir:
t This application for an amendment to the James A. FitzPatrick Technical Specifications revises Table 4.2-2, " Minimum Test and Calibration Frequency for Core and Containment Cooling Systems." It deletes the reference for functional testing of the time delay relays and timers for the High Pressure Coolant injection and the Reactor Core Isolation Cooling subsystems' automatic isolation signals. These changes revise the Technical Specificatior.s to reflect the plant design as described in the Final Safety Analysis Report and the assumptions used in the plant's accident analyses.-
Enclosed for filing is the signed original of a document entitled " Application for Amendment to Operating Ucense," with Attachments I and ll thereto, comprising a statement of the proposed changes to the Technical Specifications and the associated Safety Evaluation.
In accordance with 10 CFR 50.91, a copy of this application and the associated attachments are being provided to the designated New York State official.
l l
l 9004200316 900404
/
DR ADOCK 0500 3
g h
4
.d4' I
4 -
. Should you or your staff have any questions regarding the proposed changes, please.
contact Mr. J. B. Ellmers of my staff.
Very truly yours, u.
p' ohn.Brons.
ecutive Vice President uclear Generation i
y l'
cc:
' U.S. Nuclear Regulatory Commission 475 Allendale Road i
King of Prussia, PA 19406 Office of the Resident inspector l
U.S. Nucloar Regulatory Commission 1
P.O. Box 136
. Lycoming, NY 13093 l
Mr. David E. LaBarge Project Directorate I 1-Division of Reactor Projects 1/11 U.S. Nuclear Regulatory Commission Mail Stop 14 B2 -
i l
Washington, DC 20555 Ms. Donna Ross New York State Energy Office 2 Empire State Plaza '
i 16th Floor
' Albany, NY 12223 Y
y l
L BEFORE THE UNITED STATES -
NUCLEAR REGULATORY COMMISSION l
In the Matter of
)
NEW YORK POWER AUTHORITY
)_
Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant
)
l APPUCATION FOR AMENDMENT TO OPERATING UCENSE Pursuant to Section 50.90 of the regulations of the Nuclear Regulatory Commission, the l
New York Power Authority, as holder of Facility Operating Ucense No. OPR-59, hereby l-applies for an Amendment to the Technical Specifications contained in Appendix A of this l
license.
l l
This application for an amendment to the James A. FitzPatrick Technical Specifications -
l revises Table 4.2-2, " Minimum Test and Calibration Frequency for Core and Containment Cooling Systems." It deletes the reference for functional testing of the time delay relays i
and timers for the High Pressure Coolant injection and the Reactor Core isolation i
Cooling subsystems' automatic isolation signals on page 80 These changes revise the j
Technical Specifications to reflect the plant design as described in the Final Safety Analysis Report and the assumptions used in the plant's accident analyses.
1 d
L The proposed changes to the Technical Specifications are Attachment I to this Application for Amendment to the Operating Ucense. The Safety Evaluation for the j
proposed changes is included as Attachment 11.
l New York Power Authority l
n-J n C. Brons l
Executive Vice President.
l uclear Generation -
STATE OF NEW YORK COUNTY OF WESTCHESTER 1
i Subscribed and sworn to before me this $ day of p 1990.
bakbaho. A YW Notary Public
~