ML20034A137

From kanterella
Jump to navigation Jump to search
Forwards Details of Allegation RIII-90-A-0023 Re Activites at Plant for Review & Followup & Requests That Results Be Submitted within 30 Days.Encl Withheld (Ref 10CFR2.790(b))
ML20034A137
Person / Time
Site: Fermi 
Issue date: 04/03/1990
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
References
NUDOCS 9004200223
Download: ML20034A137 (2)


Text

3.S APR 0 31990 f

Docket No. 50-341

-t The Detroit. Edison Company j

ATTN:

B. Ralph Sylvia Senior Vice President Nuclear Operations 6400 North Dixie Highway 1

Newport, MI 48166

-Gentlemen:

The U.S. Nuclear' Regulatory Commission recently received an allegation concerning activities at Enrico Fermi Atomic ~ Power Plant, Unit 2 (RIII-90-A-0023).

Details'_of this allegation are enclosed for your review and followup, t

We' request that the results of your review and disposition of this matter be submitted to Region III within 30 days of the cate of'this letter. We request that your response contain no. personal privacy,; proprietary; or. safeguards information so'it can be released to the public and placed in the NRC Public Document Room.

If necessary, such information shall be: contained in a

-separate attachment which will be withheld ~from public disclosure. The L

affidavit required by 10 CFR 2.790(b) must accompany your response if

. proprietary information is included.

The enclosure to this letter should be controlled and distributionL11mited to personnel with a "need to know" until your investigation of the. allegation has been completed and reviewed by NRC Region III. -The enclosure to this, letter is considered Exempt from Public Disclosure in accordance with' Title 10, i

Code of Federal Regulations, Part 2.790(a).

However, a' copy of this'1etter, excluding.the enclosure, will be placed in the NRC Public Document Room.

3 The-responses requested =by this letter and the accompanying enclosure are not-subject to the clearance procedures of.the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us-is appreciated.. We will gladly discuss-any questions 3

you.may have concerning.this information.

Li o

Sincerely,

Original. signed by v. L, Azalcon

j Charles E. Norelius,-Director Division of-Radiation Safety and Safeguards (f[

l

Enclosure:

Allegation Details

.(10 CFR 2.~'790(a) INFORMATION)

Enclosure Contains 1

See Attached Distribution 10 CFR 2.790 INFORMATION T pon Separation This; 900420o223 9004os

3 U

jDR ADOCK c500 Page IS Decontrolled?

i

.,p a

1';

,4 The' Detroit Edison-Company-2 APR 0 31930 i

i Distribution cc w' enclosure:

/

D. R.-_Gipson, Plant Manager-

. Patricia Anthony, Licensing P. A. Marquardt, Corporate-Legal Department '

.NRR/DRIS/SGB 3

NRR/DRIS/ SIB 1

'NRR/DLPQ/PEB i

i cc w/o enclosure:

.i DCD/DCB (RIDS)

Licensing Fee Management Branch.

Resident Inspector, RIII'

James R. Padgett, Michigan Public-Service Commission-Harry H. Voight, Esq.

Michigan Department of 4;

Public Health-Monroe County Office of Civil Preparedness 3

l bec:

D. Funk, RIII l

l l

r l

Ll~>

1 i

RIII RII RII RII

'R i

7 4/

Dea {etteU$

av Belan er/sm

,eed G

r N

lius 4*\\ '

I[94 F

Enclosure Contains-10 CFR 2.790 INFORMATIOW Upon Separation This r

Page is Decontrolled i

-