Text
1 1
1
]
e'
~
l OPU Nuclear Corporation p;.
gg f
Post Office Box 388 '
. Route 9 South
. Forked River, New Jersey 087310388
{
609 971-4000 Wr!!er's Direct Dial Number:
Apri1L5.11990-U.S.' Nuclear Regulatory Commission
[
Attention: Document Control Desk Washington, D.-C.
20555 I
Gentlemen:
Subjects Oyoter Creek Nuclear Generating Station-(OCNGS)
Docket No. 50-219 Post-Accident. Neutron Flux Monitoring (Regulatory Guide 1.97) i Your letter dated February 26, 1990, requested that we respond. indicating our
?
intent to comply with Regulatory Guide (R.G.) l.97 and 10CFR50.49 requirements I
with respect to neutron flux monitoring instrumentation and that we advise the k
staff of the schedule for implementation, GPUN has performed a technical;and cost evaluation of neutron monitoring systems. We concluded that it is not feasible to install the ex-core neutron monitoring system offered by GAMMA-METRICS:due-to physical space constraints' inside the biological shield wall'at the OCNGS.~GPUN is currently considering installation of the General Electric (GE) wide range' neutron' monitoring system l '-
(WRNMS) to improve operational,and maintenance capabilities associated with the l.
existing Intermediate' Range Monitors and Source Range Monitors. This system:
if installed, is expected to satisfy the requirements of R.G. 1.97 and 1
10CFR50.49. However, it is our understanding that the'GE Licensing Topical Report (NEDO 31439) on WRNMS is still under review by the NRC Staff.
1.
Considering the magnitude of the project in terms of cost, engineering, and installation; an approval of the GE Topical Report is eerential' prior to a final GPUN project commitment. Therefore, we will provide our final decision and schedule for implementation following our review of an NRC. safety evaluation on the GE Licensing Topical Report.
Very truly yours, E.'E.
Fitzpatrick 9004190266 900405 Vice President & Director PDR ADOCK 05000219 Oyster Creek PDC p
00N C320593 GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
'-s
.cCa Administrator.
Region I
+
U.
S.
Nuclear regulatory Commission
.475 Allendale Road King of Prussia, PA 19406 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731 Mr. Alex Dromerick, Jr.
U. S. Nuclear Regulatory Commission k
Mail Station P1-137 1.
Washington, DC 20555
(
F II
.i
-i r
a m
?
l I
e t
f 4
s.
C320593 i
11
[