ML20034A065
| ML20034A065 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 04/06/1990 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20034A066 | List: |
| References | |
| NUDOCS 9004190258 | |
| Download: ML20034A065 (3) | |
See also: IR 05000298/1990006
Text
,.
'
'
g .g M.
[
-
.,
.
,
.
i
In Reply Refer To:
Docket: 50-298/90-06
l
-
'
Nebraska Public Power District
ATTN: George A. Trevors
i
Division Manager - Nuclear Support
l
P.O. Box 499
Columbus, Nebraska 68602-0499
!
Gentlemen:
s
!
This refers to the inspection conducted by J. E. Cummins of this office and
i
D. A. Beckman (an NRC consultant) during the period March 12-16, 1990, of
activities authorized by NRC Operating License No. DPR-46 for Cooper Nuclear
Station, and to the discussion of our findings with G. R. Horn and other
' members of your staff at _the conclusion of the-inspection.
The area examined during the inspection was the followup review of licensee
activities related to items identified during the emergency operating
procedures inspection conducted by an NRC inspection-team from June 27 through
July 15, 1988 (NRC Inspection Report 50-298/88-200). Within this area, the-
inspection consisted of selective examination of procedures and representative
'
-records, interviews with personnel, and observations by the inspectors. The
inspection findings are documented in the enclosed inspection report.
L
The inspectors determined that appropriate licensee actions had been taken on
'
the three unresolved items identified in NRC Inspection _ Report 50-298/88-200.
- ,
l
These items are considered closed.
In addition, the inspectors determined that
l
~1icensee actions related to 21 other items discussed in NRC Inspection
Report 50-298/88-200 were appropriate and had no further questions concerning
,
these items. Two items from NRC Inspection Report 50-298/88-200 will be
'
inspector followup items:
(1) Additional containment vent paths for' accident
.t
scenarios, and (2) postaccident reactor building reentry considerations based
on emergency operating procedure-(EOP) execution requirements. These issues
l
will be forwarded to the Office of Nuclear Reactor Regulation (NRR) for further
i
'
l
review.
Within the scope of the inspection, no violations or deviations were identified.
!
t
- RIV: ops
- C:0PS
'D:DRS
D
l
JEcummins;1w
JEGagliardo.
LJCallan
S
/' /90
/ /90
/ /90
AS /90
- Previously concurred
.
3
-
.
..w.
-
,
'
'
'
.
.
.
Nebraska Public Power District
-2
Should you have any questions concerning this inspection, we would be pleased
to discuss them with you.
Sincerely,
Orl0)nal Signed By:
Samuel J. Co) lins
Samuel J. Collins, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-298/90-06
cc w/ enclosure:
Nebraska Public Power District
ATTN:
G. D. Watson, General Counsel
P.O. Box 499
Columbus, Nebraska 68601
Cooper Nuclear Station
ATTN: Guy R. Horn, Division
Manager of Nuclear Operations
P.O. Box 98
Brownville, Nebraska 68321
Nebraska Department of Environmental
Control
ATTH: Dennis Grams, Director
P.O. Box 98922
Lincoln, Nebraska 68509-8922
Nemaha County Board of Commissioners
ATTH: _ Larry Bohlken, Chairman
Nemaha County Courthouse
1824 N Street
Auburn, Nebraska 68305
Department of Health
Division of Radiological Health
ATTH: Harold Borchart Director
301-Centennial Mall, South
P.0; Box 95007
Lincoln, Nebraska- 68509-5007
Kansas Radiation Control Program Director
i
.
-
k*L
.
'
'
e
.
.
,
F
-
I
- Nebraska Public Power District
-3 -
U.S. Nuclear Regulatory Commission
ATTN: Senior Resident Inspector
P.O. Box 218
Brownville, Nebraska 68321
U.S. Nuclear Regulatory Commission
.
ATTN:
Regional Administrator, Region IV
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas 76011
bectoDMB(IE01)=
bec'distrib, by RIV:-
- R. D. Martin
- Resident. Inspector
- Section Chief- (DRP/C)
' * MIS System-
Lisa Shea, RM/ALF
- DRSS-FRPS
- RIV File
- ProjectEngineer(DRP/C)
- RSTS Operator
. *DRP
- P. 0'Connor, NRR Project Manager (MS:
13-D-18)
- D P.S
- J.-E. Gagliardo
' *J. E. Cummins
D. Beckman, Consultant
- w/766
i
n
I
.
l
l
1
w
A
~
u
k
,,,w
w--