ML20033G978
| ML20033G978 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 04/06/1990 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20033G979 | List: |
| References | |
| NUDOCS 9004130254 | |
| Download: ML20033G978 (3) | |
See also: IR 05000482/1990011
Text
)
'
'
APR '- 61990
.
.
.
.
i
!
In Reply Refer To:
i
'
Docket: STN 50-482/90-11
,
Wolf Creek Nuclear Operating Corporation
-
ATTN: Bart D. Withers
i
President and Chief Executive Officer
2
l
P.O. Box 411
Burlington, Kansas 66839
,
.
,
Gentlemen:
t
!
This refers to the inspection conducted by P. C. Wagner of this office during
the period March 26-30, 1980, of activities authorized by NRC Operating
'
License NPF-42 for the Wolf Creek Generating Station, and to the discussion of
our findings with Messrs. J. Bailey and F. Rhodes along with other members of
j
your staff at the cone.lusion of the inspection.
The area examined during the inspection was the instrumentation calibration
program. Within this area, the inspection consisted of selective examination
of procedures and representative records, interviews with personnel, and
l
observations by the inspector. The inspection findings are documented in the
enclosed inspection report.
.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to an industry
i
identified problem with electrolytic capacitors. The status of this iten is
discussed in paragraph 2 of the enclosed report.
Should you have any questions concerning this Inspection, we will be pleased to
,
discuss them with you,
t
Sincerely,
Orl
SIPcd By
B. Beach
.
Samuel J. Collins, Director
Division of Reactor Projects
'
Enclosure:
(seenextpage)
- RIV:PSS
- C:PSS
- D:DRS
Ilg D
PCWagner:nh
TFStetka
LJCallan
S
ins
/ /90
/ /90
/ /90
h
/90
- Previously concurrs
,
e n ssa m ih:
$
,
0
-
F
]
.
.
-
.
.
,
Wolf Creek Nuclear
-2-
Operatir.g Corporation
Enclosure:
Appendix - NRC Ins ection Report
>
50-48?/90-11 witi Attachment
'
cc w/ enclosure:
Wolf Creek Nuclear Operating Corp.
ATIN: Gary Boyer, Plant Manager
P.O. Box 411
-
Burlington, Kansas 66839
j
'
Shaw Pittman Potts & Trowbridge
ATTN: JaySilberg,Esq.
'800 M Street, NW
r
Washington, D.C.
20036
Publ*lc Service Commission
ATTh: . Chris R. Rogers, P.E.
Manager, Electric Department
-
D.O. Box 360
Jefferson City, Missouri 65102
U.S. Nuclear Regulatory Commission
ATTN:
Regional Administrator, Region III
799 Roosevelt Road
Glen Ellyn, Illinois 60r37
'
,
Wolf Creek Nuclear Operating Corp.
ATTN: Otto Maynard, Manager
!
Regulatory Services
P.O. Box 411
Burlington, Kansas 66839
Kansas Corporation Cormission
ATTH:
Robert Elliot, Chief Eogineer
t
l
Utilities Division
!
4th Floor - State Office Building
Topeka, Kansas 66612-1571
Office of the Governor
State of Kansas
Topeka, Kansas 66612
1
<
Attorney General
1st Floor - The Statehouse
<
Topeka, Kansas 66612
Chairman, Coffey County Commission
-
Coffey County Courthouse
Burlington, Kansas 66839
.
--
.
f
.
.
.
.
-
.
.
,
Wolf Creek Nuclear
-3-
Operating Corporation
Kansas Department of Health
i
I
and Environment
'
I
Bureau of Air Quality & Radiation
Control
ATTN: Gerald Allen, Public
"
'
Health Physicist
Division of Environment
Forbes Field Building 321
Topeka, Kansas 66620
U.S. Nuclear Regulatory Commission
ATTN: Senior Resident Inspector
.;
P.O. Box 311
~i
Burlington, Kansas 66839
,
I
l
V.S. Nuclear Regulatory Commission
I
ATTN: Regional Administrator Region IV
'
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas 76011
1
bectoDMB(IE01)
1
,
bec distrib by RIV:
- R. D. Martin
- Resident Inspector
i
- Section Chief (DRP/D)
- DRP
l
- DR$5-FRPS
R. Hague, RIII
i
- RIV File
SRI, Callaway, RIII
l
- HIS System
- RSTS Operator
- ProjectEngineer(DRP/D)
Lisa Shea, RM/ALF
- DRS
- P. C. Wagner
- D. V. Pickett, NRR Project Manager (MS:
13-D-18)
- T. F. Stetka
.
i
- w/766
,
1
1
l
l
5
I
,
.
.
m
.
.