TENNESSEE VALLEY AUTHORITY CH ATTANOOG A, TENNESSEE 37401 SN 1570 Lookout Place MAR 801990 l
U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Hashington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYV NUCLEAR PLANT (SQN) - FACILITY OPERATING LICENSE DPR SPECIAL REPORT 90-04 This special report provides details concerning the auxillary building Fire Door A-60 being brehched for greater than seven days to facilitate traffic during the Unit 1 Cycle 4 refueling outage.
This report is being made in accordance with technical specification Action Statement 3.7.12.a.
The enclosure contains the details concerning the condition.
If you have any questions concerning this submittal, please telephone M. A. Cooper at (615) 843-6651.
Very truli yours, TENNESSEE VALLEY AUTHORITY b
I E. G.
- allace, anhger i
Nuclear Licensing and Regulatory Affairs l
Enclosure cc:
See page 2 459
\\ k
/
9004130192 poo33o
{DR ADOCK 0300o327 PDC An Equal opportunity Employer
3-
_2 U.S. Nuclear Regulatory Commission MAR 301990 l
cc (Enclosurr' Ms. S. C Black, Assistant Director for Projects t
TVA Projects Olvision U.S. Nuclear Regulatory Commission i
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Assistant Olrector for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Sequoyah Nuclear Plant 2609 'gou Ferry Road Soddy Daisy, Tennessee 37379 w
Enclosure SON Unit 1 Special Report 90-04 Description of Condition
]
On March 16, 1990, with Unit 2 operating in Mode 1 (100 percent power, 2,235 pounds per square inch gauge, and 578 degrees Fahrenheit), and Unit i r
being shut down for a planned refueling outage, the auxiliary building fire Door A-62 was removed to facilitate traffic entering and exiting the Unit 1 penetration room on Elevation 690.
The fire door will be nonfunctional for the duration of the refueling outage..This report is being made in accordance i
with SQN Technical Specification, Action Statement 3.7.12.a.
Cause of the Condition Auxiliary building fire Door A-62 is a double door, and half of the door will l
be roped off.for a contamination zone (C-zone) corridor to allow workmen access to the hot tool room constructed outside'the penetration room.
The.
location of the hot tool room is normally outside the C-zone. Thit C-zane corridor will greatly facilitate the reduction of time lost because of exiting the C-zone areas to obtain tools. The removal of the door.-was planned (Work Request B795938) with knowledge that the 7-day technical specification action statement would be exceeded.
Corrective Action
{
A breach permit was issued in response to the work request to remove the double door.
The fire detectors inside the Unit 1 penetration room were.
verified operable.- A roving fire watch was immediately established and will be maintained until the door is reinstalled and the breach is removed at the end of the outage.
No further action is necessary.