Text
1l.
- 3. y F*
e, w,
[ [.
s
'fi MAR 9 1990 i
Docket No. 50-295 Docket No. 50-304 Commonwealth Edison Company
. ATTN:s'Mr; Cordell Reed
-Senior Vice. President Post Office Box 767 Chicago, I'.
60690 Gentlemen:
The purpose of this letter is to confirm a co'nversation held on March 5,.1990, between Mr. T. '0. Martin. of this office and Mr. Een Graesser and other members of, your staff, on problems associated with the emergency diesel generators 'at the Zion Station..Some of the recent problems with these generators have
' involved overheated bearings, fretting of small bore tubing,. problems with
- connecting. rods and. rocker arms, air in lube' oil, a' solenoid valve installed y
backwards, and misleading indication supplied by the '"first out panel".
.j Historically, there has been a high number of failures to start.
We are concerned with"the overall nu_mber and types: of -failures being
- experienced on these generators and expect that you will determine root causes-1
.for these. problems'on an individual basis as well as on a collective basis. By
. collective basis we mean that consideration should be given to your overall j
program and approach to maintaining a'nd-troubleshooting these generators.
Do' p
trends or patterns in equipment failure histories point to weaknesses in your i
1 program:(maintenance, technical _ support, training. procedures) requiring.
. increased management attention and corrective action? We request that you, at 1
least on a preliminary basis, address your findings on:this issue as part of
.the agenda for a meeting scheduled for March 30, 1990, in the Region III I
L Office.
We'will pleased to discuss this issue further, if needed, in order.to provide L
any clarification of our concerns before the March 30, 1990 meeting.
1 D
Sincerely, gg1 GG'dD M #
h0[3OOck$O00$93 H. J. Miller, Director p
PDC Division of Reactor Safety See Attached Distribution
-RIII i
RIII M
in/jk Mide/
eennan i
03/09/90 03/,/9[
03/ /90 ymq e
rr
. r+-
e, na 0:
i in 4-u:
Commonwealth. Edison Company 2
MAR S.1990 Distribution cc:
T. J. Maiman, Vice President, PWR Operations T. Kovach, Nuclear p
Licensing Manager-T. Joyce, Station Manager i
DCD/DCB(RIDS)
Licensing Fee Management Branch J
J. Craig, NRR i J. Zwolinski, NRR -
E. Greenman, R111 Resident inspector, Rill t-Richard Hubbard
-J. W. McCaffrey, Chief, Public Utilities Division Mayor, City of Zion-
'Chandu Patel, Project
' Manager, NRR-2 1
\\
f
'l