Requests Response That Addresses NRC Concern Re Possible Violation of 10CFR50.7,per 900117 Complaint.Response Will Be Considered in Determining Whether Enforcement Action Warranted
ML20033F340
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/08/1990
From: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
References
NUDOCS 9003200074
Download: ML20033F340 (6)


Text

-

,; W & _.

);

y&

~ c3 :

8 x

k f jc

'k '

UNITED STATES

,d,'

NUCLEAR RE2ULATORY COMMISSION

, 2-

?

i :

REoloN IV i

((

(

611 RYAN PLAZA DRIVE, SUITE 1000 ARLINGTON, TEXAS 76011

- 74 g

MAR -8 $90 A

w yn' JMcket: 50-458

, gy,

I,,$ C h

bulf States L;tilities -

C' ArfN: Jarer. C. Deddens-jenkr Vice President (RBNG) 4's P.O. Box 120

?'

St. Francisville, Louisiana 70775 n

h

- Gentlecen 4

on Janucry -17,1990, theU.S.DepartwentofLabors(DOL)WageandHour i

a P

Division in New Orleans, Louisiana received a complaint from a Gulf States s

i '-

  • /tiltb5 (058.1). employee at GSU's River Band Station nuclear power plant.

The limployee aTieged that in December 1989 he received a lower than normal' 3

performance appraisal rating because: 1) he had filed quality concerns 4

foHowhg the plant's seeg4 refueling outge, 2) he had directed that work he Rtwed on instrument di system repairs for the failure to comply with 2%

110 CRPert 50, Appendix B'regairements, and 3) he had directed quality 7,

csw rance Euditors to write qu?lity assurance findings reports (QAFRs) during WW>

nWe$ty audits in Opposition,to a remo directing that any findings be labeled N,

M ob6ecoations.

ivi resgense~to that complaint, the Wage and Hour Division secured an emph ee-employer ' conciliation-as coted in the enclosed February 5,1990, f

1Gmr from Charles Bec;hith. District Director of:the Wage and Hour.

i: V EivFsion.-

-l BasedonareviewofthecomplaintiiledwithDOL,aviolationof10CFR50.7 R

We have occurred which:could.have a chilling effect on other GSU employees.

g

,4 Merefore, you2re requested to provide this office,'within 30 days of the g

Ddate of this letter, a response which:

w?

o,s k

Addresses HRC's concern thi.t a violation of 10 CFR 50.7 may have-i M'

occurred and includes a copy of any investigation reports GSU has 3, '

-regardiag the circumstances of this matter; and n

24.

Describes the actions, if any, taken or planned to assure that this y

. matter did not or does not-have'a chilling effect in discouraging other licensee personnel from raising perceived safety concerns.

,8 The NRC will consider your reecc M e in determining whether enforcement action is warranted.

P A

yl h

[/ ' *{

.~ 9'o03200074 900308 p-LPDR ADOCK 05000458 T

i\\

3 p

PDC g,-

J Gulf' States Utilities )

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC Public Document room.

The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Public Law No.96-511.

t SincerAly,

o y

(-

c T

/

3[u.-

di obert D. Martin Regional Administrator

Enclosure:

As stated cc w/ enclosure:

NRC Public Document Room Local Public Document Room Louisiana Radiation Control Program Director Gulf States Utilities Company ATTN:

J. E. Booker, Manager-River Bend Oversight P.O. Box 2951 Beaumont, TX 77704 Conner and Wetterhahn ATTN: Troy B. Conner, Jr., Esq.

1747 Pennsylvania Avenue, NW Washington, D.C.

20006 Gulf States Utilities Company ATTN: Les England, Director Nuclear Licensing P.O. Box 220 St. Francisville, LA 70775 Richard M. Troy, Jr., Esq.

Assistant Attorney General in Charge State of Louisiana Department of Justice 1

234 Loyola Avenue l

New Orleans, Louisiana 70112 l-

1 b

.a 7

'~

Gulf States Utilities-Mr. J. David.McNeill, III William G. Davis, Esq.

Department of Justice Attorney General's-Office P.O. Box 94095 Baton Rouge, Louisiana 70804-9095 H.-Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Lttisiana 70806 President of1 West Feliciana Police Jury j

1 P.O. Box.1921 St.~ Francisville, Louisiana 70775 Cajun Electric Power Coop. Inc. -

ATTN: Philip G. Harris L

10719 Airline Highway' P.O. Box 15540 Baton Rouge, LA 70895 Department of Environmental Quality ATTN:- William H. Spell, Administrator Nuclear Energy Division-

P.O. Box 14690 Baton Rouge, Louisiana 70898 b

U.S. Nuclear Regulatory Commission-ATTH:

Resident Inspector P.O. Box 1051 L

St. Francisville, Louisiana 70775'-

U.S. Nuclear Regulatory Commission ATTN:. Regional Administrator, Region IV-1.

611 Ryan' Plaza Drive, Suite 1000

-Arlington, Texas 76011 f

'i t

d

yp;w c _

3 o

p,

  • n-.

g r o,. ;

NC -81990 r;

.j 2

m-

l Gulf-States Utilities-- '

i b

w/caclosure:-

-^

,ffitNg4%.3 HThompson, DEDS-'

JLieberman,.OE:

JGoldberg, OGC

-4 JPartlow, NRR RDMartin

- Resident Inspector DRP.

-SectionChief(DRP/C)'

Lisa-Shea RM/ALF

-t

. MIS System

.DRSS-FRPS-RSTS Operator

,,~~

'ProjectEngineer(DRP/C)

RIV File WPaulson,-NRRProjectManager(MS:

13-D-18)-

e DRS GFSanborn J

-WLBrown-IBarnes RWise-r a..

E

w

. :a.

*previously-concurred A

RIV:E0L DRP:C:PS/C

.D:DRP RC R

/*cr-++,m

  • GLConstable
  • SJCollins
  • WLBrown R

in 3/02/90 03/04/90 03/05/90 03/1/90 io (t.

H= -y7g M:

.5 e

.~

e 1

l 701 Loyola Ave., Suite 13028 New Orleans, LA 70113-1931.

l Phone: 504/589-6171 January-19, 1990 l-

'Mr. Roger J. Backen

,l' 3505 Lavey Lane Baker, LA 70714 J

CERTIFIED MAIL-RETURN RECEIPT REQUESTED

Dear Mr. Backen:

'~

This will acknowledge receipt of your complaint against Gulf.

States-Utilities alleging violations of the Energy Reorganization Act.

Your complaint was received in this office L

on January 17,-1990.

The Act requires the Secretary of Labor to Notify the party named in the complaint about the filing of the complaint and to conduct an investigation into the alleged violations.

Consequently, we are providing Gulf States Utilities with a copy.of your: complaint and

'information concerning the Wage and Hour Division's responsibilities under this law.

We have enclosed a copy of the pertinent section _ of the Act and a copy of Regulations, 29 CFR Part 24 for your information.

This case ~has been assigned to Assistant District Director Don H.

~

Strobel = whose first action will be to try to achieve a mutually agreeable settlement.

If this is not possible, a fact-finding investigation will be conducted as soon as possible.

If you have further evidence, please give it to our representative who will contact. you' on this matter.

If you have any questions, do not hesitate to call me or our representative at 504/589-6171.

i Sincerely, i

iCHARLES R. BECKWITH i

District Director Encis (Continued) i

.. J

i

. Mr.ERoger'J. Backen~

- 3505 Lavey Lane Baker, LA 70714

-January 19, 1990 Page 2 o

ce s: Nuclear Regulatory Commission Enforcement Coordinator.

611 Ryan Plaza Dr., Suita 1000

'l o

Arlington, TX 76012

~

y L

Bill.A. Belt Acting-RD for Wage Hour y

U.-S. Department of Labor-ESA D

L Wage and

  • dour Division L

Federal Building 525 Griffin St.,1 Room 858 Dallas, TX 75202 q

l U. S. Derartment of L9bor

. Office of,the Solicitor i

Federal Building 525 Griffin St., suite 501 Dallas, TX 75202 l-l

-I 1

L 1.

l L

L

(

l l

1 4

g t

a-

- - -