ML20033F188
| ML20033F188 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 03/13/1990 |
| From: | Feigenbaum T PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-90071, NUDOCS 9003160374 | |
| Download: ML20033F188 (2) | |
Text
7.
~- -
h l
r ge..
-7
..gm,,
SF N.ew Hampshire:
1 n v.-
Tod C. FO ' -
' Tif Senior Vice President and '
L Chief Operating C#icer '
NYN-90071 i
March 13, 1990 l
h
!![
ju j i United States Nuclear Regulatory Conunission L
Washington, DC 20555 y
- Attention:
Document Control Desk
References:
(a) Facility' Operating Licenen NPF-67. Docket No. 50-443 (b).USNRC Letter dated May 26, 1989 " Issuance of Facility q.
Operating License NPP Seabrook Station, Unit No.
1,"
ll S. A. Varga to E. A. Brown (c) USNRC Letter dated December 28, 1989, " Revisions to Seabrook
' Technical Specifications," V. Nerses to E. A. Brown (d) New Hampshire Yankee Letter NYN-90004 dated January 4, 1990, i
" Certification of Seabrook. Station Unit.1 Technical-O Specifications " 7. C. Feigenbaum to USNRC 1
i (e) 'USNRC Letter dated January 11. 1990, ' Additional Revisions-
-to Seabrook "echnical Specifications," V. Nerses to E. A. Brown
< w t
(f) New Hampshire Yankee Letter NYN-90013, dated January 12,
-1990, " Certification of Seabrook Station Unit 1 Technical Specifications,";T. C. Feigenbsum to USNRC l
(
'(g) USNRC-Letter dated" January 31, 1990,.' Revision to Seabrook s
Technical Specification 3.5.1.1,' V. Nerses.to E. A. Brown-(h) New Hampshire Yankee Letter NYN-90036 dated' February 9,
.1990, Certification of Seabrook Station Unit 1 Technical Specifications". T. C. Feigenbaum to USNRC (i) USNRC: Letter dated March 13, 1990, ' Revision to the i
Proposed Full Power Seabrook Technical Specification (TS) 4'.4.5.3.a", V. Nerses to E. A. Brown
Subject:
- Certification'of-Seabrook Station Unit 1 Technical Specifications
~
J Gentlemen:
. EReference-(1) transmitted an additional revision to the Technical-Specif' cations for Seabrook Station which were originally provided via
-References _(b). (c), (e), and (g) and certified via References (d), (f), and
. (h)..
9003160374 900313 h
. y)
,[k[
PDR--ADOCK 05000443 P
PDC J
New Hampshire Yankee Division of Public Service Company of New Hampshire bi g
0 P.O. Box 300
- Seabrook, NH 03874
- Telephone (603) 474 9521 i
i r1-c.
V[,
^'
g-o t:
m United States Nuclear Regulatory Commission March 13, 1990-
~
Attention:
Document Control Desk Page two p
L
~ New Hampshire Yankee has performed a process to_ certify the Technical
.Specificatione based on e review of the-Seabrook Station FSAR through.
-Amendment 62.Lthe NRC Staff's Safety Evaluation Report through Supplement 8, and^the~ plant's as-built condition. To the best of my knowledge and belief, and based.on the foregoing, I certify that the proposed Technical Specifications as forwarded by_ References (b), (c), (e), (g) and (1)'
accurately reflect the as-built plant configuration, the-Seabrook Station FSAR, through Amendment 62,-the NRC Staff's Safety Evaluation Report through Supplement 8, and other docketed correspondence with the Nuclear. Regulatory Commission.
Very truly yours,
'hlW W
Ted. C. Feigen aum j
ces
.Mr. William'T. Russell Regional Administrator United States' Nuclear Regulatory Commission-Region I-475 Allendale Road Kinglof Prussia, PA 19406 Mr. Victor Nersee,' Project Manager j
Ptoject Directorate I -1 United States Nucluar Regulatory Commission 1
Division of Reactor Projects
. Washington, DC 20555
'Mr. Noel Dudley l
l NRC Senior Resident Inspector P.O~. Box 1149 Seabrook Station, NH 03874 1
i A
-f a
N:
i I.1:
'