Requests Addl Info Re Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment
ML20033F036
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/02/1990
From: Shiraki C
Office of Nuclear Reactor Regulation
To: Miltenberger S
Public Service Enterprise Group
References
GL-89-13, TAC-74014, NUDOCS 9003150290
Download: ML20033F036 (4)


Text

-.

).g e-i i

.['

UNITED STATES 4

[

p, NUCLEAR REGULATORY COMMISSION

  • 4

. r,, (

-l waswisorow. o. c. nosss

/

March 2. 1990

....+

E Docket No. 50-354 Mr.StevenE.Miltenberger Vice President and Chie<

Nuclear Officer Public Service Electric and Gas Company Post Office Box 236-Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

SUBJECT:

NRCGENERICLETTER(GL)89-13."SERVICEWATERSYSTEMPROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT," DATED JULY 18, 1989 I

(TACNO.14014) l' RE:

HOPE CREEK GENERATING STATION l

By letter dated January 26, 1990 Pub,lic Service Electric and Gas Company submitted the first of two required responses to the subject generic letter for Hope Creek Generating Station and committed to recommended actions I II, III. and V of GL 89-13. YourresponsesareacceptedasfulfillingthefIrst requirement of the generic letter for these recommended actions.

l However, you stated that you do not intend to perform system verification walk-downs which are part of recommendation IV.

Instead, you stated that as part of your Configuration Baseline Documentation (CBD) Project, walkdowns would be performed only for those situations in which a conflict exists among reference documents or.where uncertainty exists during the preparation of the CBDs (which we take to be reports'on individual design review items). A deviation of field configuration from the reference documents would therefore only be identified in the event of a conflict or an uncertainty.- The staff therefore questions whether PSE&Gs actions are sufficient to provide assurance that the Service Water System will perform its intended function in accordance with-the licensing i

basis for Hope Creek Generating Station. Since you have chosen a course of action which is different from that of the generic letter a justification that the alternate program shows that the heat removal capabi1Ity of the service water system is satisfactory should be documented and retained in appropriate plant records, i

9003150290 900302 5 i

PDR ADOCK 05000354 I rn P

PNV U(

i o

'),

Mr. Steven E. Miltenberger.

i We look forward to receiving the second of the two required responses to GL 89-13.

Sincerely, Clyde Y. S raki, Project Manager Pro,1ect Directorate I-2 Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation CC:

See next page 4

1 i

l l

l 1:

I

)e I

y-. -. - o, i

\\

Mr. Steven E. Miltenberger Hope Creek Generating Station Public Service Electric & Gas Co.

CC' M. J. Wetterhahn, Esquire Mr. Scott B. Ungerer, Manager Conner & Wetterhahn Joint Generation Projects Department Suite 1050 Atlantic Electric Company 1747 Pennsylvania Avenue Post Office Box 1500 Washington, D.C.

20006 Pleasantville, New Jersey 08232 1

i R. Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, New Jersey 07101 Resident inspector U.S. Nuclear Regulatory Comission P.O. Box 241 Hancocks Bridge, New Jersey 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O.. Box 236 Hancocks Bridge, New Jersey 08038 Mr. J. J. Hagan General Manager - Hope Creek Operations Hope Creek Generating Station P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. B. A. Preston, Manager Licensing and Regulation huclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Regional Administrator, Region i U.S. Nuclear Regulatory Comission 475 Allendale Road-King of Prussia, Pennsylvania 19406 Dr.-Jill Lipoti, Ph.D New Jersey Department of Environmental Protection Radiation Protection Program State of New Jersey CN 415 Trenton, New Jersey 08625

e I

f; 3.,)

Mr. Steven E. Miltenberger,

We look forward to receiving the second of the two required responses to GL 89-13.-

Sincerely,

/s/.

Clyde Y. Shiraki, Project Manager Project Directorate 1-2 Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation

.CC:

See next page

?

Q NRC PDR Local PDR PD1-2 Feading-

)SVarga V,

BBoger

,t:

WButler ri 4.

.J M0'Brien CShiraki e SBrown#

OGCt.

t EJordan /r 1.,

'ACRS(10)~

h VHodge.

eg, "t c

s

~

+

gy, t

?<.

5 d

t

.i

?

s T

[ MILT].

p3 PDI-?/PM PDI-2/D OGCB CShiraki:mj-WButler VHodge S / 2/90

/p/90 03 /oL/90 k

<