I i
I C
e Lc-.,,
I MHuolear
- e w,r "-
Route 9 South Forked River.New Jersey 0873bO3B8 609 97b4000 Writer's Direct Dial Number:
March 2,1990 i
U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555 E
Gentlemen Subjects Oyster Creek Nuclear Generating Station Docket No. 50-219 Technical Specification Change Request No. 185 24 Honth Cycle Surveillance Extensions Pursuant to 10CFR50.90, GPU Nuclear Corporation, operator of the Oyster Creek Nuclear Generating Station (OCNGS), Provisional Operating License No. DPR-16, requests a change to Appendix A of that license.
The attached Technical Specification Change Request proposes to revise the Technical Specifications to accommodate implementation of a 21 month operating cycle with a 3 month outage, or a 24 month plant refueling cycle.
The attachment provides justification to support the proposed Technical Specification revisions.
In addition, justification to support = extension of each of the affected individual surveillances from the current refueling F:
interval duration of a maximum of 20 months to 24 months is provided; since these individual surveillances are affected by the proposed change to the refueling outage definition.. Evaluation of some equipment and system operating
-and-surveillance histories is ongoing. This Technical Specification Change Request addresses those Technical Specification revisions and equipment or i-
. system surveillance extensions for which this evaluation has been completed to date.
This Technical Specification Change Request also proposes to specify a 20 month interval, which is the existing refueling outage definition, for those surveillances currently specified on a refueling outage basis that have not yet been evaluated.
This will allow issuance of an amendment extending those sursaillances justified herein, including the definition of refueling outage, while maintaining the current 20 month interval for those surveillances still being reviewed.
'An additional Technical Specification Change Request will be submitted to addre'ss the additional Technical Specification changes and equipment system surveillance extensions necessary to accommodate implementation of the 24-month operating cycle.
i I
9 (0\\
0 e
GPU Nuclear Corporation is a subsidiary of the General Pubhc Utilities Corporation
l
,TE,CH. SPEC. CHANGE REQUEST 185 g
PAGE 2 The existing surveillance interval for several Technical Specification requirements will expire prior to the currently scheduled 13R refueling outage date. These Technical Specification items are specifically identified in Section 4.0 of the Attachment. Priority review of these items is requested and issuance of a partial amendment approving extension may be needed to avoid an emergency Technical Specification Change Request.
This change request has been reviewed in accordance with Section 6.5 of the OCNGS Technical Specifications, and using the standards in 10 CFR 50.92 we have concluded that these proposed changes do not constitute a significant hazards consideration.
Pursuant to 10CFR50.91(b)(1), a copy of this change request has been sent to the State of New Jersey Department of Environmental Protection.
Ver trul, your l
C 1/
E.
ttpatrick V
e President and Director I
t#r Creek EEF/cjg (TSCR185)
Attachment cct Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, N.J.
08731 Mr. Alex Dromerick, Jr.
U.S. Nuclear Regulatory Commission Washington, DC 20555
I
^
O h
OPU Nuoleer Corporstlen g
f Post Office Box 388 Route 9 South Forked River, New Jersey 087310380 609 971 4000 Wnters Direct DialNumber:
March 2,1990 The Honorable Debra Madensky Mayor of Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 Dear Mayor Madensky Enclosed herewith is one copy of Technical Specification Change Request No.
185 for the Oyster Creek Huclear Generation Station Operating License.
This document was filed with the United States Nuclear Regulatory Commission on r trul your l
9 t
E.
itzpatrick l
Ve resident and Director Creek EEF/DD/crb Attachme.c GPU Nuclear Corporation is a subsidiary of the General Public Utihties Comoration
L o
pJ GPU Nucleet Corporot6en g.
f Post Office Box 388 Route 9 South Forked River New Jersey 087310388 609 971 4000 Writer's Direct Dial Number:
March 2,1990 Mr. Kent Tosch, Director Bureau of Nuclear Engineering Department of Environmental Protection CN41$
Trenton, New Jersey 08625 Dear Mr. Tosche Subjects Oyster Creek Nuclear Generating Station Provisional Operating License No. DPR-16 Technical Specification Change Request No. 185 Pursuant to 10CFR50.91(b)(1), please find enclosed a copy of the subject document which was filed with the United States Nuclear Regulatory Commission on
- ulyprs,
'ery E.
E.
J t atrick Vice Pts sident and Director Oy ter
( reek EEF/DD/crb d
Attachment GPU Nuclear Corporation is a subsidiary of the General Puolic Utilities Corporation
_ _ _ _ _ _ _ _ _ _ _ _ _ _. - - _. __. _ _.