Forwards Insp Repts 50-313/90-02 & 50-368/90-02 on 900101-31.Violations Noted Re Failure to Set All Four Unit 2 Steam Generator Level Low Trip Channels.Notice of Violation Will Not Be Issued Based on Licensee self-identification
ML20033E456
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/26/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20033E457 List:
References
NUDOCS 9003130034
Download: ML20033E456 (3)


See also: IR 05000313/1990002

Text

- - _ _

__

._ - . _

_

_.

-

._.

",Q, Y ,,

!

-

'

FEB 26 IND

j

!

-In Reply Refer To:

,

Dockets: 50-313/90-02

,

50-368/90-02

,

!

+l

,

,

.

!

Arkansas Power & Light Company

i

c

'

'

ATTN: Mr. Gene Campbell

.

. Vice President, Nuclear

.

-Operations

.

,

P.O. Box 551

.

'

Little Rock Arkansas 72203

1

,

Gentlemen:

i

-

This refers to the inspection conducted by Messrs. C. C. Warren and R. C. Haag

j

of this office during the period January 1-31, 1990, of activities authorized

by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1

'

and 2, and to the discussion of our findings with Mr. N. S..Carns and other

-!

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included followup of events, operational

,

safety verification, surveillence, maintenance and in-office review of licensee

reports. . This report does not include specific inspection followup for any

-

Diagnostic Evaluation Team findings (reference Diagnostic Evaluation Team

Report issued December 21,1989). Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews-

.

with personnel, and observations by the inspectors. The findings are documented

i

in the enclosed inspection report.

In addition, it was found that while certain other activities were in violation

,

of NRC requirements, as discussed in Section 4.4 of this report, you had

identified the problems and were taking appropriate corrective actions within a

reasonable period of time. Because the NRC wants to encourage and support

j

licensee. initiative for self-identification and correction of problems, a

Notice of Violation will not be issued on this item.- This action is being

,

taken in accordance with Appendix C, paragraph V.G.1, of the NRC's Rules of

l

Practice," Part 2. Title 10, Code of Federal Regulations.

l

An unresolved item is identified in Section 4.1 of this report regarding the

adequacy of licensee administrative controls for operator use of uncontrolled

l

information and deviation from procedures,

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

j

Section 3.0 of the enclosed report.

1

i

~

  • DRP/A
  • C:DRP/A
  • D:DRP

1

CCWarren;df

ATHowell

DDChamberlain

SJCollins

2/23/90

2/23/90

2/23/90

2/25/90

  • nrevinutiv concurred

.

]

'

9003130034 900226

-

PDR

ADOCK 05000313

'

_

Q

PDC

1

-

.

_

._

-

,_

_

f-

'

P,0

. .,

'

<

L

p

Arkansas Power & Light Company

-2-

!

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you,

J

Sincerely,

!

'

Ori inal Signed By:

D

Samuel J. Couine

,

Samuel J. Collins, Director

t

Division of Reactor Projects

'

Enclosure:

' Appendix - NRC Inspection Report

50-313/90-02

i

50-368/90-02

l

.

cc w/ enclosure: Arkansas Nuclear One

ATTN: Early Ewing, General Manager

. Technical Support and Assessment

,

P.O. Box 608

'Russellville Arkansas 72801

3

Arkansas Nuclear One

ATTN:

Neil Carns, Director

Nuclear Operations

P.O. Box 608

Russellville Arkansas 72801

.

,

Combustion Engineering, Inc.

ATTN:- Charles B. Brinkman, Manager

Washington Nuclear Operations

,

,

12300 Twinbrook Parkway, Suite 330

!

i

' Rockville, Maryland 20852

?

Honorable Joe W. Phillips

-County Judge of Pope County

-Pope County Courthouse

Russellville, Arkansas 72801

.

Bishop, Cook,- Purcell & Reynolds

ATTN: Nicholas S. Reynolds Esq.

1400 L' Street

N.W.

Washington, D.C.

20005-3502

Arkansas Department of Health

ATTN:

Ms.. Greta Dicus, Director

Division of Environmental Health

Protection

4815 West Markam Street

Little Rock, Arkansas 72201

.

.

j

C

L

o,

.

s;

,

]'..

~ 'i .

{

'

'

'

<

1

'

L

p.

Arkansas Power & Light Company

-3-

"'

'

,

,

i

-Babcock & Wilcox

1

Nuclear Power Generation Division

j

ATTN: Mr. Robert- B. Borsum

i

r

1700 Rockville Pike Suite 525

Rockville Maryland 20852

,

U.S. Nuclear Regulatory Commission

j

r.

i:-

ATTN: Senior Resident Inspector

f-

1 Nuclear Plant Road

i

e,

Russellville, Arkansas 72801

i.

f

- U.S. Nuclear Regulatory Commission

i

'-

ATTN: . Regional Administrator, Region IV

. ,

l'

611 Ryan P1 ara Drive Suite 1000

Arlington, Texas 76011

,

,

bec to DMB (IE01)

'

bec distrib. by RIV:

!

  • RRI
  • Robert D. Martin, RA
  • RPB-DRSS
  • SectionChief(DRP/A)

~ '

Lisa Shea, RM/ALF,

  • RIV File
  • DRP .
  • MIS System

,

  • RSTS Operator
  • Project Engineer. DRP/A

'

  • T. Alexion, NRR Project Manager (MS: 13-D-18)
  • DRS

,

  • C, Poslusny, NRR Project Manager (MS: 13-D-18)

i

  • w/766

-

.

i

'

.

t

t

6

f

,

w

t

,

a -

, , - - -

--

, . _ - - -

r

-