ML20033E355
| ML20033E355 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/01/1990 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| References | |
| NUDOCS 9003120498 | |
| Download: ML20033E355 (3) | |
Text
p
~
!?
_ ~ q(
o 4
P J
.t.
j l
f-March 1, 1990 b
Docket Nos. 50-424, 50-425 l
[
i Georgia Power Company i
i:
ATTN: Mr. W. G. Hairston, III Senior Vice President -
i Nuclear Operations t
P. O. Box 1295 Birmingham, AL 35201 i
Gentlemen:
SUBJECT:
EMERGENCYOPERATINGPROCEDURE-(EOP)INSPECTIONPROGRAM i
This is to advise you of a special inspection initiative that is being performed at operating reactors.
It will include an inspection to be performed 1
at your Vogtle site. The initiative is entitled the "EOP Inspection Program."
The purpose of the inspection is to verify that the E0Ps are technically accurate; that specified actions can be meaningfully accomplished using existing equipment, controls, and instrumentation; and that the available procedures have the usability necessary to provide the operator with an effective operating tool.
The inspection program is a team inspection. The inspection team will include two or three reactor inspectors, a licensing examiner, a human factors specialist, and the Vogtle senior resident inspector.
The inspection is scheduled for May 7-18, 1990.
The team leader for this inspection will be i
Mr.-L. Lawyer from Region II.
Mr. Lawyer will contact members of your staff in the near future to discuss the details of the inspection.
If you have any questions in the interim regarding the inspection program, we will be pleased to discuss them with you.
Sincerely, (ORIGINAL SIGNED BY T. A. PFTRTE)
(l g
Thomas A. Peebles, Chief 4
eo Operations Branch Division of Reactor Safety oo IS8 cc:
R. P. Mcdonald Executive Vice President-Nuclear es; 4 en Operations 3,8 Georgia Power Company
- Nf P. O. Box 1295 g
Birmingham, AL 35201
- e-0 (cccont'd-Seepage 2) zesc
't Georgia Power Company 2
March 1, 1990 b
(cc cont'd)
C. K. McCoy Vice President-Nuclear f
Georgia Power Company P. O. 1295 Birmingham, AL 35201 G. Bockhold, Jr.
General Manager, Nuclear Operations Georgia Power Company P. 0.-1600 Waynesboro, GA 30830 J. A. Bailey Manager-Licensing Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 Ernest L. Blake, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, NW Washington, D. C.
20037 J. E. Joiner, Esquire Troutman, Sanders, Lockerman, and Ashmore
-1400 Candler Building-127 Peachtree Street, NE Atlanta, GA 30303 D. Kirkland, III, Counsel Office of the Consumer's Utility Council Suite 225, 32 Peachtree Street, NE Atlanta, GA 30302 Office of Planning and Budget Room 615B 270 Washington Street, SW Atlanta, GA. 30334 Office of the County Consnissioner Burke County Consnission Waynesboro, GA 30830 J. Leonard Ledbetter, Director Environmental Protection Division Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 (cccont'd-Seepage 3) g
p~
(f, 4
r:
f4 -
Georgia Power Company 3
March 1, 1990 (cccont'd)
Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 r
State of Georgia bec:
E. Reis, OGC i
J. Hopkins, NRR K. Brockman, RII' l
A. Herdt RII focumentControlDesk l'
NRC Resident Inspector U.S. Nuclear Regulatory Commission i
P. O. Box 572 r
Waynesboro, GA 30830 t
i i
f i
t i'
f DRS R 1 RII:DRP PA PKeklogg rIt eeb'les R5 chin 026f/90 02/>S/90 02/ u /90 y/[/90 L
.