Text
.
r.
b f
u
.+
l t
GPU Nuclear Corporation 1p a ge One Upper Pond Road i, '.4 WW Parsippany, New Jersey 07054 l
201 316-7000 l
TELEX 136-482 3
Writer's Direct Dial Number:
L March 1, 1990 C311-90-2020 J
4410-90-L-0013 1
1 i
U. S. Nuclear Regulatory Commission j
Attna Document Control Desk i
Washington, D.C. 20555 Gentlemen
Subject:
Three Mile Isltend Nuclear Station Unit 1 (TMI-1) 3 Three Mile Island Nuclear Station Unit 2 (TMI-2)
Oyster Creek Nuclear Generating Station (OC)
Operating License and Docket Nos:
DPR-50/ Docket 50-289 (TMI-1)
DPR-73/ Docket 50-320 (TMI-2) h DPR-16/ Docket 50-219 (OC) l10 CFR Part 26 Fitness-for-Duty (FFD) Program Implementation Status Report By *0tter dated January 3, 1990 (C311-89-2136), CPU Nuclear (GPUN) certified that>it has implemented an FFD program designed to meet the requirements of 10 CPR Part 26.
GPUN also indicated that s self-assessment quality assurance audit was in progress; and, GPUN would inform the NRC of the status of our accions-resulting from t he audit by March 1,1990.
This report *ulfills that
-commitment.
.1 The self-assessment quality aucurance audit was compltntWd on February 9, 1990.
- Twenty-three (2*l) audit findings, p. tential resolutionri, planned raeponses, and.
completed actions were presented a;.d d.tscussed at the post-audit confierence on February 14,.1990.
Review of the audit findings shows that the statements contained in our January 3, 1990 let:ter remain valid.
Many of the corrective actiono have been completed and the remainder have been ochedelned for completion on or before March 31, 1990, with one exception. ona
' d, '
longer term corrective action is related to obtai.ning adequate fire resiotant storage for-the Medical Department's records pursuant to the requirements of tb9 CP6N Operat1onal' Quality Assurance' Plan.
9003170290 90(r3Q1bDOCK 05000219 PDR P
pre 31005890 r6 tC GPU Nuclear Corporation is a subsidiary of General Pubhc Utilities Corporation
/
m%,.
p.
h h,
- ,3.-
1" i
. Page>2-r -
k l
!=
l n
i
- G In a separate CPUN letter (No. C311-90-2015, dated 2-15-90), GPUN has also l1 L submitted a request for a' dgigrmination on or exemotion from the applicability i
.of-State statutes for equipment used in the performance of breath alcohol L
analysis.
In addition, CPUN is preparing an exemption request for those persons
]
who are physically handicapped by the inability to provide a urine specimen,-
L (e.g., people who are required to use' dialysis equipment to maintain their life-
- function).
t,.hE As a result of the self-assessment quality assurance audit and the the requisite corrective actions to' resolve the audit findings, GPUN will have improved the I
overall implementation of the Fitness For Duty (FFD) program required.by
- j. ;
Subsequent to completing the Audit Etrort, GPUN will provide I
[
copies of the report to the NRC resident' inspectors at each site.
>.4 sincerely, 1
(
}
vi P. R. Clark President i
E. Collins, NRC.
A. Dromerick, NRC R.=Hernan, NRC M. Masnik,'
NRC.
W. Russell,-
NRC J. Stolz, NRC
.F.
Young,=
NRC 0
r P
l
~
t
- 131'005890, 4
^^
..