Submits 10CFR26 Fitness-for-Duty Program Implementation Status Rept,Per & Informs That as Result of self- Assessment QA Audit & Requisite Corrective Actions to Resolve Audit Findings,Util Will Have Improved Program
ML20033E320
Person / Time
Site: Oyster Creek, 05000000, Crane
Issue date: 03/01/1990
From: Phyllis Clark
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
4410-90-L-0013, 4410-90-L-13, C311-90-2020, NUDOCS 9003120290
Download: ML20033E320 (2)


Text

.

r.

b f

u

.+

l t

GPU Nuclear Corporation 1p a ge One Upper Pond Road i, '.4 WW Parsippany, New Jersey 07054 l

201 316-7000 l

TELEX 136-482 3

Writer's Direct Dial Number:

L March 1, 1990 C311-90-2020 J

4410-90-L-0013 1

1 i

U. S. Nuclear Regulatory Commission j

Attna Document Control Desk i

Washington, D.C. 20555 Gentlemen

Subject:

Three Mile Isltend Nuclear Station Unit 1 (TMI-1) 3 Three Mile Island Nuclear Station Unit 2 (TMI-2)

Oyster Creek Nuclear Generating Station (OC)

Operating License and Docket Nos:

DPR-50/ Docket 50-289 (TMI-1)

DPR-73/ Docket 50-320 (TMI-2) h DPR-16/ Docket 50-219 (OC) l10 CFR Part 26 Fitness-for-Duty (FFD) Program Implementation Status Report By *0tter dated January 3, 1990 (C311-89-2136), CPU Nuclear (GPUN) certified that>it has implemented an FFD program designed to meet the requirements of 10 CPR Part 26.

GPUN also indicated that s self-assessment quality assurance audit was in progress; and, GPUN would inform the NRC of the status of our accions-resulting from t he audit by March 1,1990.

This report *ulfills that

-commitment.

.1 The self-assessment quality aucurance audit was compltntWd on February 9, 1990.

- Twenty-three (2*l) audit findings, p. tential resolutionri, planned raeponses, and.

completed actions were presented a;.d d.tscussed at the post-audit confierence on February 14,.1990.

Review of the audit findings shows that the statements contained in our January 3, 1990 let:ter remain valid.

Many of the corrective actiono have been completed and the remainder have been ochedelned for completion on or before March 31, 1990, with one exception. ona

' d, '

longer term corrective action is related to obtai.ning adequate fire resiotant storage for-the Medical Department's records pursuant to the requirements of tb9 CP6N Operat1onal' Quality Assurance' Plan.

9003170290 90(r3Q1bDOCK 05000219 PDR P

pre 31005890 r6 tC GPU Nuclear Corporation is a subsidiary of General Pubhc Utilities Corporation

/

m%,.

p.

h h,

,3.-

1" i

. Page>2-r -

k l

!=

l n

i

G In a separate CPUN letter (No. C311-90-2015, dated 2-15-90), GPUN has also l1 L submitted a request for a' dgigrmination on or exemotion from the applicability i

.of-State statutes for equipment used in the performance of breath alcohol L

analysis.

In addition, CPUN is preparing an exemption request for those persons

]

who are physically handicapped by the inability to provide a urine specimen,-

L (e.g., people who are required to use' dialysis equipment to maintain their life-

function).

t,.hE As a result of the self-assessment quality assurance audit and the the requisite corrective actions to' resolve the audit findings, GPUN will have improved the I

overall implementation of the Fitness For Duty (FFD) program required.by

j. ;

10 CFR Part 26.

Subsequent to completing the Audit Etrort, GPUN will provide I

[

copies of the report to the NRC resident' inspectors at each site.

>.4 sincerely, 1

(

}

vi P. R. Clark President i

E. Collins, NRC.

A. Dromerick, NRC R.=Hernan, NRC M. Masnik,'

NRC.

W. Russell,-

NRC J. Stolz, NRC

.F.

Young,=

NRC 0

r P

l

~

t

131'005890, 4

^^

..