{.o NRC-90-28

  • WPGC(4141433-1598 T ELECOP1ER [414) 433-5544 EASYUNK 62891993 WISCONSIN PUBLIC SERVICE CORPORATION Soo North Adams e P.O. Box 19002 o Green Bay, WI 543o7-9002 March 1, 1990 1

U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Response to Generic Letter 90-01:

Request for Voluntary Participation in the NRC Regulatory impact Survey Generic Letter 90-01 requested WPSC's participation in completing questionnaires to provide the NRC with insight on the time which key nuclear power plant mana-gers spend in responding to the various operational inspections and audits (including those conducted by the company itself) that are imposed upon.them.

We appreciate the opportunity to participate in this survey.

Attached are completed questionnaires in the areas of NRC team inspections, other NRC inspections,-INP0 evaluations, ANI, state / local authorities, NRC required quality assurance audits, safety system functional inspection program, and WPSC's' independent technical review program.

We have attempted to be as accurate as possible in. completing these question-naires to ensure that the information provided is reasonable, consistent and of the scope and depth to be effective in improving the regulatory process.

WPSC looks forward to receiving a copy of the final survey report.

Sincerely, A

K. H. Evers Manager - Nuclear Power BJD/jms

Attach, cc - Mr. Patrick Castleman, US NRC US NRC, Region 111 9003120025 900301 D

O P,DR ADOCK 0500 5

'a BJD1'.2 NRC Regulatory Impact Survey Questionnaire Sheet 1.

Type of inspection, audit or evaluation:

Other NRC Inspections 2.

Based on actual experience over the past several years, about how often is this activity conducted?

The NRC resident inspector on a continuous basis audits operations throughout the year and interfaces with WPSC per-sonnel on a daily basis. Approximately every 45 days an exit meeting is held with the plant manager.

3.

Operations / Construction areas covered:

N/A 4.

Extent of the activity (how many people, for how long)

An averaga of 8 inspections per year were conducted for the years 1987-1989 by NRC head-quarters' inspectors. Sinte February 1, 1989, inspectors from NRC headquarters conducted 8 inspections for a total of 54 NRC man-days and 82 WPSC man-days.

5.

Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item #1.

a.

Plant Department Heads 5%

(numberinvolved) 6 b.

Plant Manager 5%

c.

Corporate Department Heads 5%

(numberinvolved) 2 d.

Corporate Vice Presidents (numberinvolved) e.

Chief Nuclear Officer

g L,*

BJD1.1 NRC Regulatory Impact Survey Questionnaire Sheet.

1.

Type of inspection, audit or evaluation:

NRC Team Inspections 2.

Based on actual experience over the past several years, about how often is this activity conducted?

Varies from 2-5 per year, depending on 1

issues.

3.

Operations / Construction areas covered:

N/A' 4.

Extent of the activity (how many people, for how long)

Approximately ten NRC inspections ware conducted over the past three years, involving roughly 31 NRC inspectors. For the most part, one WPS employee is dedi-cated for each NRC inspector.

5.

Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item #1.

a.

Plant Department Heads 5%

(number involved) 2 b.

Plant Manager c.

Corporate Department Heads (number involved) d.

Corporate Vice Presidents (number involved) e.

Chief Nuclear Officer

BJ01.3 NRC Regulatory Impact Survey Questionnaire Sheet 1.

Type of inspection, audit or ev61uation:

INPO Evaluations 2.

Based on actual experience over the past several years, about how often is this activity conducted?

Once every 18 months - varies on our per-formance.

3.

Operations / Construction areas covered:

N/A 4.

Extent of the activity (how many people, for how long)

INP0 - approxi-mately 144 man-days (16 people /9 days). WPS - approximately 200 man-days -

(54 man-days - Dept Heads /146 man-days-Supr) 5.

Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item #1.

a.

Plant Department Heads 10%

(number involved) 6 b.

Plant Manager 10%

c.

Corporate Department Heads <5%

(number involved) d.

Corporate Vice Presidents <5%

(number involved) e.

Chief Nuclear Officer <1%

l l

BJD1.4 NRC Regulatory Impact Survey Questionnaire Sheet 1.

Type of inspection, audit or evaluation:

ANI or NEIL 2.

Based on actual experience over the past several years, about how often is this activity conducted?

Annually 3.

Operations / Construction areas covered:

-N/A 4.

Extent of the activity (how many people, for. how long)

Two Inspectors-10 man-days. Two WPSC personnel - 20 man-days.

5.

Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item #1.

a.

Plant Department Heads <1%

(numberinvolved) 1 b.

Plant Manager <1%

c.

Corporate Department Heads <1%

(numberinvolved) 1 (numberinvolved) d.

Corporate Vice Presidents e.

Chief Nuclear Officer l

BJD1.5 NRC Regulatory Impact Survey Questionnaire Sheet i

l v.

1.

Type of inspection, audit or evaluation:

State / Local Authorities 2.

Based on actual experience over the past several years, about how often is this activity conducted?

Ongoing for approximately six months out of the year.

3.

Operations / Construction areas covered:

Inservice inspection of ASME, Section 11, all repairs and modifications to pressure vessels, boilers, and power piping in accordance with the Department of Industry, Labor and Human Relations, Section 41 & 42 of the State of Wisconsin Administrative

)

Codes.

4.

Extent of the activity (how many people, for how long)

One inspector on-site for approximately six months per year.

5.

Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item'#1.

a.

Plant Department Heads 5%

(number involved)

I b.

Plant Manager <1%

c.

Corporate Department Heads <1%

(number involved) d.

Corporate Vice Presidents 0

(numberinvolved) e.

Chief Nuclear Officer 0

i

BJD1.6 c

NRC Regulatory Impact Survey Questionnaire Sheet 1.

Type of inspection, audit or evaluation:

NRC Required QA Audits 2.

Based on actual experience over the past several years, about how often is this activity conducted?

Approximately 60 audits per year; average of 90 man-hours /' audit.

3.

Operations / Construction areas covered:

All areas as specified in 10 CFR 50 Appendix B.

4.

Extent of the activity (how many people, for how long) 12 people full time.

5.

Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item #1.

a.

Plant Department Heads 2%

(number involved) 6 b.

Plant Manager 2%

l c.

Corporate Department Heads 2%

(number involved) 6 d.

Corporate Vice Presidents 1%

(numberinvolved) 1 e.

Chief Nuclear Officer i

BJD1.7 l

NRC Regulatory Impact Survey Questionnaire Sheet 1.

Type of inspection, audit or evaluation:

NRC audit of Safety System Functional Inspection (SSFI) Program.

1.

Based on actual experience over the past several years, about how often is this activity conducted?

Annually 3.

Operations / Construction areas covered:

SSFI, company response to find-

'ings.

4.

Extent of the activity (how nany people, for how long)

One inspector for one week.

5.

Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item #1.

a.

Plant Department Heads <1%

(number involved) 1 i

b.

Plant Manager <1%

l c.

Corporate Department Heads <1%

(numberinvolved) 2 d.

Corporate Vice Presidents (numberinvolved) e.

Chief Nuclear Officer l

l

BJD1.9 NRC Regulatory Impact Survey Questionnaire Sheet 1.

Type of inspection, audit or evaluation:

Safety System Functional Inspections 2.

Based on actual experience over the past several years, about how often is this activity conducted?

Average of 14 weeks per year.

3.

Operations / Construction areas covered:

Design, operations, mainten-ance, QA, training, testing.

4.

Extent of the activity (how many people, for how long) 8 people for 14 weeks.

5.

Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item #1.

a.

Plant Department Heads 15%

(numberinvolved) 5 b.

Plant Manager 5%

c.

Corporate Department Heads 5-10%

(numberinvolved) 6 d.

Corporate Vice Presidents 5%

(numberinvolved) 1 e.

Chief Nuclear Officer 9

r BJD1.8 NRC Regulatory Impact' Survey Questionnaire Sheet 1.

Type of inspection, audit or evaluation:

Independent Technical Review Program (Critical Self-assessment Program).

2.

Based on actual experience over the past several years, about how often is this activity conducted?

On average eight reviews are conducted each year.

3.

Operations / Construction areas covered:

All nuclear programs are can-didate for review.

4.

Extent of the activity (how many people, for how long)

In 1989 the average per review was 537.5 man-hours.

WpSC staff totaled 3000 hrs.

Contracted labor was 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />. Approximately 50 WPSC employees had 1 or more hours of involvement in this program.

5.

Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and.in response to the activity described in Item #1.

a.

Plant Department Heads <1%

(numberinvolved) 1*

i l

b.

Plant Manager <1%

c.

Corporate Department Heads <1%

(numberinvolved) 6*

d.

Corporate Vice Presidents <1%

(numberinvolved) 1 e.

Chief Nuclear Officer <1%

  • Actual numbers for 1989.

Can change from year to year depending upon the areas being reviewed.

Completion of this questionnaire for the Independent Technical Review Program required approximately 24 maci-hours.

3