ML20033D205
| ML20033D205 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 11/10/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML20033D206 | List: |
| References | |
| NUDOCS 8112070378 | |
| Download: ML20033D205 (2) | |
See also: IR 05000416/1981050
Text
e
-
J l lo a )
%
pg
,
NOV 101981
-Q
e
G[(7Q 7
'py
y
g
Mississippi Power and Light Company
Og7
~
ATTN:
Mr. N. L. Stampley
__
u,4
4
Vice President of Production
t-
% 70 8/A
3'
% sD%
P. O. Box 1640
2
Jackson, MS 39205
g
Gentlemen:
1'6
Subject: Report Nos c56T16/81-Dnd 50-417/81-22
This refers to the routine safety inspection conducted by Mr. J. J. Blake of
this affice on October 27-30, 1981, of activities authorized by NRC Construction
Permit Nos. CPPR-118 and CPPR-119 for the Grand Gulf Nuclear Station facility and
to the discussion of our findings held with Mr. G. 8. Rogers, Jr., Site Manager,
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scopa of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this offict to
withhold such information.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
'ection 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
+her eof sought to be withheld, and a full statement of the reasons on the basis
.
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
spacified periods noted above, the rep'rt will be placed in the Public Document
Roem.
81[hhfo
-
o
1
M ol9 t
i
,
.
-
-
o,'
-
NOV 101881
Mississippi Power and Light Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-416/81-50
and 50-417/81-22
cc w/ enc 1:
D. C. Gibbs, Vice Fresident
- Middle South Energy, Inc.
C. K. McCoy, Plant Manager
bcc w/ encl:
NRC Resident Inspect. r--
Document Management Branch '
State of Mississippi
..
t
'
.
.
n
-
L
-
.
,
-
- ,
=
RI
RII I b
RII
R
--
'
Y
n
dlake:ht
- AR erdt
CEMurphy-
A01shinski
R
wis
-
11/q/81
11/f/81
'11/ /81
11 4 /81
-11/jQ/81
4
,
d
sm-
%