Part 21 Rept Re Diesel Generator High Crankcase Pressure Signals,Initially Reported on 810921.Stewart & Stevenson Svcs Will Be Requested to Review Info
ML20033D178
Person / Time
Site: San Onofre  
Issue date: 11/25/1981
From: Randy Patterson
BECHTEL GROUP, INC.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-PT21-81-530-000 PT21-81-530, PT21-81-530-000, NUDOCS 8112070337
Download: ML20033D178 (1)


Text

Bechtel Power Corporation Engineers Constructors 12400 East Imperial Highway Norwalk, California 90650 P BO TEN MNEX, LOS ANGELES.

/e RwL y D) *g-Q November 25, 1981 lg prp 3

Mr. Karl Seyfrit

,c DE04 1939 ip Director, Region IV y

Office of Inspection and Enforcement wmm U.S. Nuclear Regulatory Commission 9

sf 611 Ryan Plaza Drive, Suite 1000 V

Arlington, Texas 76012 g

Subject:

Diesel Generator High Crankcase Pressure Signals

Reference:

Southern California Edison 10 CFR 50.55(e) Report dated September 21, 1981.

Docket Nos. 50-361 and 50-362, San Onofre Nuclear Generating Station, Units 2 & 3

Dear Mr. Seyfrit:

On September 21, 1981, Southern California Edison, San Onofre Units 2 and 3, informed Mr. Engelken, U.S. Nuclear Regulatory Commission Region V, of the subject Unit 2 deficiency.

Subsecuent evaluation by tLe Cechtel Review Committee concludes that the condition is also reportable under 10 CFR Part 21. The Southern California Edison report contains all the information required by Part 21 with the exception of the information required by 21.21(b)(3) VI as it is unknown to Bechtel.

Stewart and Stevenson Services, Incorporated will be advised by letter that the component as applied by Bechtel cor.tains a substantial safety hazard defect and will be requested to review the information supplied by Bechtel and determine its responsibility for compliance to Part 21, Section 21.21(b)(3)

VI.

Other Bechtel Divisions were advised of the defect by copies of appropriate reports and correspondence. Should it be determined that basic components.

with this defect are in use, have been supplied to or are being supplied for one or more other Sechtel projects, the affected Division will' report the condition according to the Regulation.

Sincerely, BECHTEL POWER CORPORATION R. L. Patterson Manager of Division Quality Assurance g [7 911ko M367 8111 h