ML20033D170
| ML20033D170 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/02/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20033D171 | List: |
| References | |
| NUDOCS 8112070330 | |
| Download: ML20033D170 (2) | |
See also: IR 05000348/1981019
Text
.
\\e\\\\w
.
.
,
NOV 0 21981
-
n
Alabama Power Company
/k
[
ATTft: fir. R. P. ficDonald
41h
A
-
~
C7
Vice President-Nuclear Generation
(C- %
'88/A --
.
P. O. Box 2641
I
M
UIEs?%
g!
%
Birmingham, AL 35291
V;,
Gentlemen:
V/
e
\\
/%,g.9
Subject: Report flosCTO'-348/81-19;and 50-364/81-22
This refers to the routine safety inspection conducted by Mr. W. H. Bradford of
thf
office on August 17 - October 15, 1981, of activities authorized by f4RC
Opt aing License flos. flPF-2 and flPF-8 for the Farley facility and to the
discussion of our findings held with fir. W. G. Hairston, Plant flanager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the flRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this office
by telephone within ten days fran the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
The information soug' ' to be withheld shall be incorporated
as far as possible into a separate part x
he affidavit.
If we do not hear from
you in ti,is regard within the specified periods noted above, the report will be
placed in the Public Document Room.
paA2gggtoataagg
)
Z Eols
, ,.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
o -
.
.
NOV 0 21981
~
Alabama , Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
,
Sincerely,
M
Paul J. Kellogg, Chief
Reactor Projects Branch 2, Division
of Resident and Reactor Project
Inspection
Enclosure:
I
Inspection P' port Nos. 50-348/81-19
and 50-364/81-22
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr., Senior Vice President
H. O. Thrash, General Manager-Nuclear Generation
0. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
l
J. W. McGowan, Manager-Safety Audit
and Engineering Review
W. C. Carr, Supervisor-Safety Audit
and Engineering Review
W. G. Hairston, III, Plant Manager
bec w/enci:
NRC Resident Inspector
Document Management Branch
State of Alabama
RII:RDPI
RII:RRPI
RII:R I
gl,
.
JFRogge:gr
VLBr n ee
PJKe
gg
/,g81
W/ t/81
-
/
1
..
.
^
_ _ _ . .-
._
A -