Forwards IE Insp Repts 50-348/81-19 & 50-364/81-22 on 810817-1015.No Noncompliance Noted
ML20033D170
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/02/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20033D171 List:
References
NUDOCS 8112070330
Download: ML20033D170 (2)


See also: IR 05000348/1981019

Text

.

\\e\\\\w

.

.

,

NOV 0 21981

-

n

Alabama Power Company

/k

[

ATTft: fir. R. P. ficDonald

41h

A

-

~

C7

Vice President-Nuclear Generation

(C- %

'88/A --

.

P. O. Box 2641

I

M

UIEs?%

g!

%

Birmingham, AL 35291

V;,

Gentlemen:

V/

e

\\

/%,g.9

Subject: Report flosCTO'-348/81-19;and 50-364/81-22

This refers to the routine safety inspection conducted by Mr. W. H. Bradford of

thf

office on August 17 - October 15, 1981, of activities authorized by f4RC

Opt aing License flos. flPF-2 and flPF-8 for the Farley facility and to the

discussion of our findings held with fir. W. G. Hairston, Plant flanager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the flRC's Public Document Room.

If the report contains any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this office

by telephone within ten days fran the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

mation.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new due date may be established.

Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4).

The information soug' ' to be withheld shall be incorporated

as far as possible into a separate part x

he affidavit.

If we do not hear from

you in ti,is regard within the specified periods noted above, the report will be

placed in the Public Document Room.

paA2gggtoataagg

)

Z Eols

, ,.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

o -

.

.

NOV 0 21981

~

Alabama , Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

,

Sincerely,

M

Paul J. Kellogg, Chief

Reactor Projects Branch 2, Division

of Resident and Reactor Project

Inspection

Enclosure:

I

Inspection P' port Nos. 50-348/81-19

and 50-364/81-22

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, General Manager-Nuclear Generation

0. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

l

J. W. McGowan, Manager-Safety Audit

and Engineering Review

W. C. Carr, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

bec w/enci:

NRC Resident Inspector

Document Management Branch

State of Alabama

RII:RDPI

RII:RRPI

RII:R I

gl,

.

JFRogge:gr

VLBr n ee

PJKe

gg

/,g81

W/ t/81

-

/

1

..

.

^

_ _ _ . .-

._

A -