Text
-
._
_
r
~
.
NOV 0 31981
'
f[f[
b7
Alabama Power Company
ATTN: Mr. R. P. Mcdonald
^
3
Vice President-Nuclear Generation
S
Qf
'
NOT
P. O. Box 2641
i
f.
" % ,UE @ %
Birmingham, AL 35291
%
gs;/g
g/
y
Gentlemen:
\\
Subject: Report Nos.dRi48/81-2Dnd 50-364/81-25
I q 6' Y
'
This refers to the routine safety inspection conducted by Mr. T. R. Collins of
this office on October 5-9,
1981,' of activities authorized by NRC License
Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of our
findings held with Mr. W. G. Hairston, III, Plant Manager, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this. letter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such information. If your receipt of this letter has been delayed such that:less
than seven days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
-information which identifies the document or part thereof sought to'be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). 1he information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
-you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
,
)
h0
A
.
r EatPN
,
"
. _.
.-
_
..
.
. -
.
'
'
NOV 0 31981
' Alabama Power Company .
2
)
Should you have any questions concerning this letter, we will be glad to discuss-
them with you.
Sincerely,
,
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
.
Enclosure:
Inspection Report Nos. 50-348/81-22
a nd - 50-364/81',.5
cc w/ enc 1:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice Dresident
H. O. Thrash, General Manager-Nuclear Generation
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
. J. W. McGowan, Manager-Safety Audit -
and Engineering Review
W. C. Carr, Supervisor-Safety Audit
and Engineering Review
< , .
W. G. Hairston, III, Plant Manager
bec w/ encl:
NRC Resident Inspector
3
o
J
Document Management Branch
s
State of Alabama
x
' '{.
'
,
'A
'
.
.
Y
'
,,
.
.
' , ,
TRCollins:aw -: : CM
-
AFGibson
VLBrownlee~-
Lewi
10/g 81
.10tp81;
, ;, {--l .
.10/t>/81
V81
10/
11
.
3
fi.fA+c
._.
V
'
i
.
. .
g . ,
?,
i
f
a
'
"'., -