ML20033C950
| ML20033C950 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 11/30/1981 |
| From: | Bickwit L NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
| To: | Ellen Brown CALIFORNIA, STATE OF |
| References | |
| NUDOCS 8112040529 | |
| Download: ML20033C950 (1) | |
Text
p-Cacoq UNITED STATES 1.,,
l., g.
I
""g._
g i};
NUCLEAR REGULATORY COMMISSION
{%
fi ey g 7,
WASHINGTcN, D. C. 20555
? ' d~c,L -
.'*~
),
\\p..cM/
n-n.1 P 2 15 November 3d611991 j bh."
N The Honorable Edmund G. Brown, Jr.
NE, g
[
9 Governor of California Governor's Office DE03 1981 > p Sacramento, California 95814 u. aua uce*** J conmsm
Dear Governor Brown:
A and i; Wrh This is in response to your letter of October 30, 1981 those of your legal representatives to Nunzio J. Palladino, Chairman of the Nuclear Regulatory Commission, regarding the recent discovery of errors in seismic design and construction at Diablo Canyon Nuclear Power Plant.
As you know, the Commission on November 19, 1981 suspended PG&E's license to load fuel and conduct low power tests at Diablo, pending completion to the Commission's satisfaction of a seismic reverification program.
The Commission considered your comments in establishing requirements for PG&E's audit and review program, as reflected in the enclosed Commission Order and related letter from the NRC staff to PG&E.
Sincerely,
- RGL _stJt(
Leonard Bickwit, Jr.
General Counsel
Enclosures:
1.
Commission Order Suspending License, CLI-81-30, dated November 19, 1981 2.,, Letter from Denton to PG&E dr.ted November 19, 1981 cc: Byron S.
Georgiou Herbert H.
Brown Diablo Canyon Service List E
DSs
/!O 8112040529 811130 PDR ADOCK 05000275 A