ML20033C916

From kanterella
Jump to navigation Jump to search
Forwards Analysis of Hydrogen Control Measures at McGuire Nuclear Station, Vols 1 & 2
ML20033C916
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 10/30/1981
From: Parker W
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20033C917 List:
References
NUDOCS 8112040491
Download: ML20033C916 (1)


Text

DUKE Powen Contwxv l'owen licuniso 422 SocTu Circucu STuxxT CuAut.orrn, N. C. ::te.w wl L LI AM O, PA R A E' Ft. J R.

v cr PREO trNT TE'. E PMO N E: A A E4 D s,- e c -,c ~

October 30, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370

Dear Mr. Denton:

Attached are 20 copies of a report e~ntitled "An Analysis of Hydrogen Control Measures at McGuire Nuclear Station" dated October 1931.

This report is sub-mitted in accordance with Section 2.C.(ll)h. of the McGuire Operating License.

The system as described in the attached report is intended to be the perma-nent hydrogen control system and is expected to be installed by January 31, 1982 subject to equipment delivery constraints and a forced outage of suffi-cient duration to complete the remaining work inside containment.

1 This report will be updated as on-going research projects are completed or i

other circumstances arise which require changes to the document.

If there

{

are any questions regarding the attached, please advise.

1

/ ry truly yours, E7s

/ t N

,e /s l

s

/./.

~, -

'~"-~#.

$J -

iG. L ( c,-

A William 0. Parker,Jr.(

t GAC/smh Attachment cc: w/ attachment M. J. Graham Mr. James P. O'Reilly, Director Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Region II 101 Marietta Street, Suite 3100 [$

Atlanta, Georgia 30303

~

h.

ei120@"CK o$ho d29 l

PDR ADO PDR b

P

--