ML20033C916
| ML20033C916 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 10/30/1981 |
| From: | Parker W DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20033C917 | List: |
| References | |
| NUDOCS 8112040491 | |
| Download: ML20033C916 (1) | |
Text
DUKE Powen Contwxv l'owen licuniso 422 SocTu Circucu STuxxT CuAut.orrn, N. C. ::te.w wl L LI AM O, PA R A E' Ft. J R.
v cr PREO trNT TE'. E PMO N E: A A E4 D s,- e c -,c ~
October 30, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370
Dear Mr. Denton:
Attached are 20 copies of a report e~ntitled "An Analysis of Hydrogen Control Measures at McGuire Nuclear Station" dated October 1931.
This report is sub-mitted in accordance with Section 2.C.(ll)h. of the McGuire Operating License.
The system as described in the attached report is intended to be the perma-nent hydrogen control system and is expected to be installed by January 31, 1982 subject to equipment delivery constraints and a forced outage of suffi-cient duration to complete the remaining work inside containment.
1 This report will be updated as on-going research projects are completed or i
other circumstances arise which require changes to the document.
If there
{
are any questions regarding the attached, please advise.
1
/ ry truly yours, E7s
/ t N
,e /s l
s
/./.
~, -
'~"-~#.
$J -
iG. L ( c,-
A William 0. Parker,Jr.(
t GAC/smh Attachment cc: w/ attachment M. J. Graham Mr. James P. O'Reilly, Director Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Region II 101 Marietta Street, Suite 3100 [$
Atlanta, Georgia 30303
~
h.
ei120@"CK o$ho d29 l
P
--