Final Deficiency Rept Re Blocked Tubes in Steam Generators, Initially Reported 810820.Blockage Prevented Passage of Eddy Current Probe Caused by Felt Cleaning Plugs Inadvertently Left Inside During Cleaning.Tubes Cleared by Removing Plugs
ML20033C905
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/18/1981
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-19498-GHD, DER-81-26, NUDOCS 8112040481
Download: ML20033C905 (3)


Text

%

Docket Nos. 50-528/529/530 T

50 55(e) Report

)

bY h

f STA.

P.O. E C X 21666 PHOENIX, ARIZONA 85036 November 18, 1981 ANPP-19498-GHD/BSK i ' ^ ' ' b> N u

U. S. Nuclear Regulatory Commission C'

g j," !!, '

g l

Region V 4 0, ) Q' #

1 Creekside Oaks Office Park 1450 Maria Lane - Suite 210 9] DEc3 7ggIh p Walnut Creek, California 94596-5368 Attention:

hr. B. H. Faulkenberry, Chief Q

M ff p u Reactor Construction and N

\\yk C.'gineering Support Branch s

\\cij)g-

/

p '

5!bject:

Final Report - DER 81-26 A 50.55(e) Report Relating to Blocked Tubes in Unit 1 Steam Generators 1:ile:

81-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between Bob Dodds and B. S. Kaplan on August 20, 1981 (B) ANPP-18946, dated Septcmber 18, 1981, Interim Report

Dear Sir:

Attached, is oar final written report of the deficiency referenced above, which has been determined to be Not Reportable under the requirements of 10CFR50.55(e).

Very truly yours,- ]

Y k (l au D)mu- --

t E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:ske

]

Attachment 9

B ss o,

cc:

See Page 2

('

l 92 UE

S 0

9 m

3 8112040481 811118 PLR ADOCK 05000528 j/

8 6l-233

~

~

U. S. Wuclear Regulatory Commission Attention:

Mr. B. H. Faulkenberry, Chief ANPP-19498-chb /25SK November 18, 1981 Page 2 cc: Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 J. A. Roedel D. B. Fasnacht G. C. Andognini F. W. Hartley J. M. Allen A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen Ms. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040 i

t l

l i

.i.

o I

FINAL REPORT - DER 81-26 DEFICIENCY EVALUATION 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 1 I.

Description of Deficiency During Unit 1 Steam Generator tube eddy current exsmination, the "A" Steam Generator had eighty-one (81) blocked tubes and the "B" Steam Generator had nine (9) blocked tubes preventing passage of the eddy current probe. The obstructions were from felt cleaning plugs inadvertently left inside the steam gener-ator tubes during cleaning operations in the CE shop. The subject felt plugs were subsequently removed by means of com-pressed air.

II.

Analysis of Safety Implications This condition is evaluated as being Not Reportable.

The following factors were considered in reaching this conclusion:

1.

One of the requirements in the selection of the material for the cleaning plugs was that the material dissolve when exposed to primary coolant chemistry and temperature. Tests have shown that the felt plugs will completely decompose at 5000F in the water c.hemistry of the pre-core test program.

2.

CE has determined t hat the decomposition products of the number of felt plugs reported will have no harm-ful effects, especially when the residue is diluted by the large inventory of primary wates.

3.

The effects of felt plug decomposition products on the reactor core need not be addressed, since the fuel will not be loaded until after hot-functional testing, by which time the decomposition products would have been removed from the system.

Based on the above information, it is concluded that the plugs left inside the steam generator tunes could not have adversely affected the safety of operation of the plant, therefore this situar. ion is Not Reportable in accordance with 10CFR50.55(e) which addresses safety implications of manufacturing deficiencies assuming they go uncorrected.

III.

Corrective getion The blocked tubes have been cleared by removing the felt plugs.

.-