Opposes Licensing of Facilities
ML20033C843
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/01/1981
From: Freeman K
AFFILIATION NOT ASSIGNED
To: Palladino N
NRC COMMISSION (OCM)
References
NUDOCS 8112040383
Download: ML20033C843 (1)


Text

-

y

-ESE.1I55.'~.53 u.. s, MS.,

/

Mr. Nunzio Palladino T iy[

Chairman Nuclear Regulatory Commission DEC -1 P 3;45 g e.

Washington, D. C.

'81 U W.

N9

Dear Mr. Palladino:

$. jdkcf

[,p)&,

= ucatw C Sj y

THE DIABLO CANYON PLANT MUST NEVER OPEN!

DEC3 1981 * -

Ld u.s, wxt Aa ant.Atoat y,,

comss04 s

This reactor is sited only 3 miles from an earthquake fault, 4,,

'g discovered after construction began.

Why did not the NRC stop construction immediately ?

Iki[.

Now a major flaw involving the stress analysis of pipe supports has been found. This flaw may affect the ability to withstand earth-quakes -- which occur periodically along the Pacific coast.

The PG & E Company, the builder has announced an indefinite delay.

HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE 7 WHAT KIND OF INSPECTION DOES THE NRC DO ?

Your credibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.

The Diablo Plant has a dozen other problems, including evacuation and plant security.

NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.

You have callously put the 2. 3 billion dollars of the industry before the life of the citizens you are supposed to protect.

YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!

Sincerely, gf NAME mR. Ketty faseman ADDRESS 64 3 c o n is o g ive

/

l CITY, STATE G.RE AT FMu.3, m7-SMof D o3 S

J

/4 l

l 8112040383 811201 PDR ADOCK 05000275 H