ML20033C372
| ML20033C372 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 10/22/1981 |
| From: | Puzey A PORTLAND GENERAL ELECTRIC CO. |
| To: | Clark R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20033C368 | List: |
| References | |
| NUDOCS 8112030052 | |
| Download: ML20033C372 (3) | |
Text
'. 's,
e
'S 44 364 m"rE&ombE COMUNICATION PORTLA$D GENERAL ELECTRIC COMPA2tT f
Date y ; -: 337 Director of Nuclear Reactor Regulation To ATTN: Mr. Robert A. Clark, Chief Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555 Frona A.M. Puzey Trojan Nuclear Plant Radiological N
Emergency Plan and Procedures Manual Enclosed are the changed pages to volume 4, Section' 3, of the Trojan Plant Operating Manual. These pages are to be inserted in your manual in accordance with the instruction sheet attached.
Please acknowledge receipt by completing the lower po
.this transmittal and returning it to the address below.
4 I
,,9
'N,e,
/p {6e}/ '% '3 4 / ~,,
e u
Enclosure g
2Y **4,,
0, Y
[
N,,fs@';c?/*
Copy #-
54-63
\\
f ACKNOWLEDGEMENT t /#=. i..- e Trojan Plant Operating Manual Emergency Procedures Manual, Volume 4, Section 3.
I hereby acknowledge receipt of the changes to Copy Number oi' the subject document, as listed on the attached instruction sheet (Page 2).
Signature of Copy Holder Date Return to:
A. M. Puzay 00 {
Trojan Nuclear Plant P. O. Box 439 i
Rainier, OR 97048
/ /c ei120 m s2 e1 3
pon Ai5ccn os M
F
?
sp 1
--w m
e
=-w'+
r e-43-s e e h
INTER
- OFFICE COMMUNICATION PORTLAND GENERAL ELECTRIC COMPANY Date To From Trojan Nuclear Plant Radiological Subject Emergency Plan and Procedures Manual Enclosed are the changed pages to Volume 4, Section 3, of the Trojan Plant Operating Manual. These pages are to be inserted in your manual in accordance with the instruction sheet attached.
Please acknowledge receipt by completing the lower mrtion of this transmittal and returning it to the address below.
Enclosure i
j Copy #
ACKNOWLEDGEMENT Trojan Plant Operating Manual Emergency Procedures Manual, Volume 4, Section 3.
4 I
l I hereby acknowledge receipt of the changes to Copy Number of the subject document, as listed on the attached instruction sheet (Page 2).
i Signature of Copy Holder Date Return to:
A. M. Puzey Trojan Nuclear Plant P. O. Box 439 Rainier, OR 97048 i
Cg-I
)
PAGE 2 REVISION TO THE TROJAN PLANT OPERATING MANUAL EMERCENCY PROCEDURES MANUAL Volume 4, Section 3 i
10/19/81 Date 4
INSTRUCTION SHEET I
Changes to the Trojan Plant Operating Manual, Volume 4, Section 3, are attached.
f Revised pages are identified by revision number, and contain vertical lines indicating the area of change.
Please follow the instructions plow for updating your manual.
i REMOVE INSERT PROCEDURE / PACE REVISION PROCEDURE /PAGE REVISION i
.Pages 1-9 1
Pages 25 & 27 2
l i
w
-