ML20033B978

From kanterella
Jump to navigation Jump to search
Forwards Amend 10 to Fsar,Consisting of Chapter 13 Revisions,Question & Response Pages for Chapter 14 Per NRC ,Geotechnical Engineering Branch & Power Sys Branch Questions & Voluntary Updating Changes
ML20033B978
Person / Time
Site: Clinton 
Issue date: 11/30/1981
From: Koch L
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20033B979 List:
References
U-0337, U-337, NUDOCS 8112020541
Download: ML20033B978 (1)


Text

7 U-0337 ILLINDIS POWER CJMPANY fggy t34_gt(tt 30)_t 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 November 30, 1981 bP O

N 3.

Mr. Harold R. Denton, Director S

II Office of Nuclear Reactor Regulation f

b' U.

S. Nuclear Regulatory Commission

'~

DEC1 1981> r Washington, D.

C.

20555 g,,ssawa,ssass -f s

sa

Dear Mr. Denton:

0 Clinton Power Station Unit 1 a

td Docket No. 50-461 Final Safety Analysis Report (FSAR) Amendment No. 10 Illinois Power Company hereby files Amendment No. 10, dated November, 1981, for the Clinton Final Safety Analysis Report CPS-FSAR.

FSAR Amendment No. 10 consists of Chapter 13 revisione in response to informal NRC questions / concerns; question and response pages for Chapter 14 in reply to NRC letter of October 27; responses to some Geotechnical Engineering safety review questions; revisions to the IP responses on some Power System Branch acceptance review questions; and some voluntary updating changes.

Three (3) signed originals and eighty-five (85) copies are furnished for amenf.ing the FSAR sets provided to NRC per 10 CFR 50.30.

Respectfully submitted, ILLINOIS POWER COMPANY Y

. Koch Vice President GEW/em Subscribed and sworn to before me the 302 day of November, lE r

Uma !f,

/Y

  1. Notary Public g2% [ oh s

-