ML20033B952

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Structural Steel Connections in Unit 5
ML20033B952
Person / Time
Site: Satsop
Issue date: 11/24/1981
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20033B953 List:
References
GO3-81-2784, NUDOCS 8112020502
Download: ML20033B952 (1)


Text

-

n_2,,

s Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 45 '

{f},

g Q NL li.i I

( DEC1

$81> 9 7s'm,y :

0

/

s

/

F$

November 24, 1981 G03-81-2784 Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington D. C.

20555 Attention:

Mr. V. Stello Gentlemen:

~

Subject:

PROJECT N05. 3 AND 5 DOCKET NUMBERS 50-508 AND 50-509 FINAL REPORT OF POTENTIAL 10CFR50.55(e)

STRUCTURAL STEEL CONNECTIONS - UNIT NO. 5 (D/N #019)

Attached is a copy of the final repert provided to Region V con-cerning a potential 10CFR50.55(e) associated with structural steel in Unit No. 5.

Should you have any questions or desire further ;nformation, please contact me directly.

Very truly yours, s

R. S. Leddick Program Director, WNP-3/5 cc:

J. Adams - NESCO-WO/A D. Smithpeter - BPA-WO/A Ebasco - New York-WO/A WNP-3/5 Files - Richland-WO/A I s,i 8112O20502 811124 PDR ADOCK 05000509 S

PDR