Forwards IE Insp Repts 50-454/81-18 & 50-455/81-14 on 811005-31.No Noncompliance Noted
ML20033B669
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/17/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20033B670 List:
References
NUDOCS 8112010628
Download: ML20033B669 (2)


See also: IR 05000454/1981018

Text

F-

.

.

NOV 171981

%

o

/

p

N(9- [s

' c,

Docket No. 50-454

-

.

Docket No. 50-455

. J ..

Commonwealth Edison Company

NOV3 01981* g

ATTN:

Mr. Cordell Reed

I-

U5 g 'i' g' "s

Vice President

E

'

ff

/,

Post Office Box 767

t

vg

'

Chicago, IL 60690

This refers to the routine safety inspection conducted by Mr. W. Forney

of this office on October 5 thru 31,1981, of activities at Byron Station,

Units I and 2, authorized by NRC Construction Permits No. CPPR-130 and

CPPR-131 and to the discussion of our findings with Mr. V. I. Schlosser

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of the inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

8112010628 811117

gg/

PDR ADOCK 05000454

0

PDR

S

C

l

.

.

Commonwealth Edison Company

-2-

g7

requires the statement to address with specificity the considerations

listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall

be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periode

noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

s n+v-rD

sg

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosure:

Inspection Reports

No. 50-454/81-18 and No.

50-455/81-14

cc w/ enc 1:

Louis 0. DelGeorge

Director of Nuclear

Licensing

Gunner Sorensen, Site

Project Superintendent

V. I. Schlosser,

Project Manager

R. E. Querio, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

Myron M. Cherry

~

III

III

RIII

RII

Aw?/w

,it

sd

'

Sp s ard

Kngp [N

Forn /jp

ayes

3/f1

pq