ML20033A915

From kanterella
Jump to navigation Jump to search
Informs That No Addl Fee Will Be Required for OL Processing & Issuance.Max Fee,Per 10CFR170.21,has Been Paid
ML20033A915
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/16/1981
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Clayton F
ALABAMA POWER CO.
References
NUDOCS 8111300156
Download: ML20033A915 (1)


Text

_ _ _ _ _ _. __.

Y d

.g

{;

NOV 161981 Docket No. 50-364 Alabama Power Company ATTN: Mr. F. L. Clayton, Jr.

Senior Vice President P.O. Box 2641 Birmingham, Alabama Gentidmen:

On March 31, 1981, the Comission amended Operating License NPF-8 to authorize 100% power for the Joseph M. Farley Huclear Plant-Unit 2.

As requimd by 10 CFR 170.21, an operating license fee of $302.800 was paid for the issuance of the operating license.

In accordance with Footnote 3 of Section 170.21, the costs incurred in the processing and issuance of the Farley 2 operating license have been reviewed and they substantially exceed the maximum fee of $302,800 prescribed by the Comission's regulations. Since the maximum fee prescribed by regulation for an operating license has been paid, no additional operating license fee is required for Farley 2.

Sincerely.

Original Sinted DY w m, 0,1nner William 0. Miller, Chief License Fee Management Branch Office of Administration DISTRIBUTION Docket File /:

PDR LPDR Manpower File CJHolloway, LFMB RMDiggs, LFMB KLKohler, LFMB LFMB R/F (2) 8111300156 811116 N

PDR ADOCK 05000364

-/

v P

PDR

/

LM.B}[DM,,,,,.,L,.

, DM.,,

LF!iB ; ADM,,,,,,,

omee,

.KL$,,W,,,,,r: bs.,

,CJ,,

,,,g, ay,,,y0, Mille,r,,,,,,

w sum.. >

1,1,,',{$./. 8.1......

11/hl/81 me >

11../..l 81 r-enc ronu sis tio-so; nacu c24o OFFIClAL RECORD COPY usm i,.i-mm k...e..