ML20033A870

From kanterella
Jump to navigation Jump to search
Response to CA Governor Brown 811014 Third Request for Production of Documents.Certificate of Svc Encl.Related Correspondence
ML20033A870
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/18/1981
From: Crane P
PACIFIC GAS & ELECTRIC CO.
To:
CALIFORNIA, STATE OF
References
NUDOCS 8111300055
Download: ML20033A870 (78)


Text

l T,3/a:: ":"Imr::Cr g

@' Nc UNITED STATES-Cr M ERICA-NUCLEAR REGULATORY COMMISSION g@ 23

,g

%u.M BEFORE THE ATOMIC SAFETY AND LICENSING BOARD '

ShU VM.CB In the Matter of

)

)

PACIFIC GAS AND ELECTRIC COMPANY

)

Docket No. 50-275

)

Docket No. 50-323 Diablo Canyon Nuclear Power Plant,

)

Units 1 and 2

)

(Full Power Proceeding)

)

APPLICANT PACIFIC GAS AND ELECTRIC COMPANY'S RESPONSE _TO THE THIRD REQUEST FOR PRODUCTION OF DOCUMENTS FROM GOVERNOR BROWN

~

DATED OCTOBER 14, 1981 The documents listed are available for inspection and/or copying at Pacific Gas and Electric Company headquarters during normal business hours.

PGandE requests one day's notice for staffing purposes whenever counsel desire to review the documents.

Respectfully submitted, MALCOLM H. FURBUSH PHILIP A. CRANE, JR.

RICHARD F. LOCKE Pacific Gas and Electric Company P. O. Box 7442

' C. 1 _,

San Francisco, California 94120

?J l

Y;C"

/

(415) 781-4211 l

ARTHUR C. GEHR

//- / /,0!<.: _ f rt Snell.& wilmer z;

'41.g,,,' i /Sg7 Q 3100 Valley Bank Center gi rQf

  1. y$

Phoenix, Arizona 85073 e

(602) 257-7288 l

.t yp-D

~

BRUCE NORTON N

l Norton, Burke, Berry & French, P.C.

3216 N. Third Street i

Suite 300 l

Phoenix, Arizona 85012-2699 (602) 264-0033

~

D# [

Attorneys f r (g

P i i Gas and Ele r

  • C mpany y

0111300055 811118 PDR ADOCK 05000275 l

/

t/

G PDR B(

g 1 hili ~ R Crane { Jr.

5

(

Dateo: November 18, 1981

PREVIOUSLY SUBMITTED DOCUMENTS RESPONSIVE TO GOVERNOR BROWN'S 3rd REQUEST FOR PRODUCTION OF DOCUMENTS:

Paragraph #1:

All documents requested, described and/or referred to in Ihterrogatories or Responses Interrog. #1:'

EPNG 0009446 0009449

~

EPNP 0084754 Interrog. #8:

EPNP 0087913 Interrog. #10: EPPI 0090010 0090644 0093187 0094236A EPED 0073591 0073592 EPNP 0085786 Interrog. #11: EPNP 0064445 0064462 0064478 0083270 Interrog. #29: EPNP 0084412 -

0084418 0084422 i

0084425 0084431 0084439 0084447 l

0084464 0085506 0085622 0085626 0085634 0085640 0085654 0085661 0085685 0085691 0085755 EPPI 0090583 0090587 0090597 0090641 1 Of 1

1__ _

j DOCUMENTS RESPONSIVE TO GOVERNOR BROWh'S TilIRD REQUEST FOR DOCU!iENTS DATED 10/14/81 Doc.

  • 10.

DATE From/To/ Entity Doc. Type Doc. Description l

EPNG 0009416 5/13/81 ItllRogers/Rogern llelicopter 1.etter Confirmation of 5/11/81 phone conversation I pg.

JTorrens/PG68 re Itelicopter sve, w/l attach.

GS-1 EPNG 0009417 11/20/80 JAMarino/PGLE 1,e t t e r Attach 81: Transmits cont. actors' copy of 1 pg.

Gentlemen / Rogers llelicoptern of contract ID-22-206-80 w/l attach.

'GS-1 f.

EPNG 0009418 9/8/80 JAHarino/PG&B Contract Attach 41: Contract D-22-206-80 3 pgs.

IlwKlocke/PGLE GS-1 WRogers/ Rogers llelicoptern 1

i I

l l

l l

h P

at

-w mmma-.m

-a,

_. n.s n _ s s _

m ~a,_ _.

n=~

~~ -

8 4

e Doc I Para. I Date From/To Entity Doc. Type Doc. De cription EPTC-0040420 9/2/81 No Name/ TERA Corp.

Study Earthquake Emerg. Planning at DC GB-4 SMSkidmore/PG&E Volume I 199 pgs.

EPTC-0049421 9/2/81 No Name/ TERA Corp.

Study Earthquake Emerg. Planning at DC GR-4 SMSkidmore/PG&E Volume II 174 pgs.

EPTC-0040422 9/2/81 No Name/ TERA Corp.

Study Earthquake Emerg. Planning at DC GB-4 SMSkidmore/PG&R Volu e III 320 pgs.

m U

I e

o b

l u

n

__._.._w.

.. _ _ _. _. -.... _ _ _.. -..._1 l

ri,J, n

Doc. iio.~

~ 'DATN ~~

Prom /To/ Entity Doc. Type Doc. UcBcripttg e

MNED 0097094 4/21/80 No Name/PGEE Report PG6F. response to NUREG 0578 Short-term 369 pgs.

lessons learned requirement GS-1 i

MNED 0097464 4/9/75 JRSchulties/ Westinghouse Report Valve Reference Guide for Class I,II,& III l

20 pgs.

GS-1

(

MNED 0097488 10/18/74 No Name/ Westinghouse Specification Auxiliary relief valves system SIS l

4 pgs.

sheet GS-4 I

l MNED 0097492 2/4/75 No Name/ Westinghouse Specification Auxiliary Relief Valves j

1 pg.

deduced Sheet l

GS-1

{

MNED 0097493 2/26/73 No Name/ Westinghouse Valve Index Westinghouse NES valve index by location l

2 pgs.

i GS-1

}

MNED 0097496 3/4/81 No Name/US NRC Report Safety Evaluation Rpt NUREG 0675 812 i

69 pgs.

GS-1 MNED 0097555 7/77 No Name/Wostinghouse Report Pressure Mitigating Systems Transient 227 pgs.

Analysis Results 3

GS-1 I

t I

i i

i I

IIII IN N..,;-

,u;~-
M- ~ t s:n$ "

l

\\

Illli.

1 Doc. No.

DhTE

~~"From/To/ Entity Doc. Type Doc. Description HNED 0097785 11/16/79 Kphodes/PG&E Pilotos Photos of pressurizer heater cable 6 pgs.

Rhaverty/PGEE connections to heaters GS-l MNED 0097791 12/26/79 No Name/PG&E llandwritten Notes Info that was confirmed in the 1 pg.

field re pressurizer PROV's.

GS-1 MNED 0097794 6/29/79 No Name/PG&E Memo Info re DCPP nondestructive exam I pg.

of pressurizer heater wild GS-1 MNED 0097795 7/2/79 RAYoung/PG&E Memo Transmits draft procedure to switch I pg.

BPatterson/PGEE vital PWR to non-vital for pressurizer GS-1 heaters MNED 0097796 6/29/79 RAYoung/PG&E Procedure Method to energize 4kv bus sect. D&E 2 pgs.

'Elle rbst/ PG& E from any diesel generators.

GS-1 MNED 0097798 3/28/78 JRaggio/PG&E Memo Re Modification to the pressurizer 1 pg.

RAYoung/PGLE heater power supply cable tray GS-1 MNED 0097799 2/26/78 JRaggio/PGLE Memo Res Relocation of pressurizer heater 1 pg.

Mr. Tresler/PG&E pwr supply cable try GS-1 DARockwell/PG&E MNED 097000 4/1/76 No Name/PG&E Memo Unit 2 pressurizer relief valve piping 1 pg.

.RI,averty/PGEE should be same as unit 1 piping GS-1

I i

i i

,7 h; N, '

Doc. No.

DATE F r oth/ To/ En ti t y UOC. Tylie UDC. 130 script 10n s

MNED 0097825 1/15/72 TJDaly/PG&E Hemo Request to update drawings-safety 1 pg.

IPNall/PG&E valve lines GS-1 JHcMillan MNED 0097826 4/5/72 Al Schmidt/PGEE Hemo Request for pressurizer relief 1 pg.

HTresler/PGEE valves dimensions GS-1 1

HNED 0097827 11/6/69 DNielsen Memo Pressurizer heater pwr supply I pg.

JOSchuyler/PGEE I

GS-1 I

HNED 0097828 11/16/67 DVKelly/PG&E Hemo Optional equipment offered by i

1 pg.

FFHautz/PG&E Westinghease-Pressurizer heater GS-1 pwr supply HNED 0097829 11/13/67 DNielsen/PGLE Hemo Nielsen recommends that Westinghouse I pg.

DVKelly/PG&E offer be accepted. Pwr supply for GS-1 pressurizer heater t.

MNED 0097836 8/31/79 WCJangloff/ Westinghouse Letter Westinghouse review of environ.

2 pgs.

DVKelly/PG&E qualifications of equipments GS-1 l

HNED 0097838 6/1/78 WCGangloff/ Westinghouse Memo Status of 2 documents I pg.

DVKelly/PG&E GS-1 g

)

l l

Doc. No.

DATE From/To/ Entity Doc. 1fpo Doc. Description

\\

l MNED 0097891 3/19/74 FCDiAgostino/ Westinghouse letter Pressurizer safety relief valve 2 pgs.

DVKelly/PGLE testing GS-l l

l MNED 0097933 5/1/73 RStiteter/ Westinghouse Letter Change in Westinghouse Wiring l

1 pg.

JWDorrycott/ Westinghouse diagram for pressurizer heaters j

GS-1 DVKelly/PGLE MNED 0097934 10/17/72 JWDorrycott/ Westinghouse Report Analysis of pressurized safety &

l 3 pys.

relief valves GS-1 HNED 0097937 A0/17/72 JWDorrycott/ Westinghouse Report Westinghouse scope of supply 3 pgs.

deduced deduced GS-1 MNED 0097940

0/13/72 AJSpurgin/ Westinghouse Letter Acceptable loads on pressurizer nozzle 2 pga.

DVKelly/PG&E GS-1 MNED 0097945 3/7/79 AJSpurgin/ Westinghouse Letter Westinghouse does not recommend any 1 pg-DVKelly/PGEE insulation for the wiring to the GS-1 pressurizer heaters MNED 009796s 8/4/69 IINSkow/ Westinghouse Letter Info re pressurizer heater supply 2 pqs.

RCilichols/ Westinghouse system & connections Gs-1 DVKelly/PG&E I

MNED 0097967 1/30/68 JFFinn/ Westinghouse Diagram Pressurizer typical heater pattern I.

pg.

deduced

?

G::~ l i

1 w

s n

-~~-,

t em

'~

il Doc. Ho.

DATE Prom /To/ Entity poc. Type poc. pesetaption e

MNED 0090001 8/29/79 DVKelly/PG&E I,etter Review of electrical requirements I pg.

WCGangloff/Westinghosue for pressurizer heaters GS-1 MNED 0098003 8/29/79 DVkelly/PGEE Letter Review of electrical, requirements for 1 pg.

WCGangloff/ Westinghouse pressurizer heaters GS-1 MNED 0098009 1/10/74 DVKelly/PGEE Letter Can we use safety valve nozzles for 1 pg.

JWDorrycott/ Westinghouse relief valves?

GS-1

?

MNED 0098026 12/29/72 DVKelly/PGEE Letter Alternate analyses in designing the 2 pgs.

JW9orrycott/ Westinghouse piping associated w/ pressurizer safety GS-1

& relief valves MNED 0098932 4/25/72 DVKelly/PGLE Letter Refer to drawing 50/D/80-pressurizer 2 pgs.

JWDorrycott/ Westinghouse heater controls GS-1 MNED 0098096 6/10/77 CERalston/PGLE Hemo Status of Pressurizer relief valve 1 pg.

order from Crosby Va'.ve Co.

GS-1

)

MNED 0098104 8/28/79 GCLaguens/PGLE Memo Design criteria memo on pressurizer

~4 pgs.

heater emerg. pwr supply requirements GS-1 MNED 0098118 1/19/73 TJDaly/PG&E Memo Comments of Westinghouse's data on 3 pgs.

pressurizer relief valves GS-1 L

~.

4 Doc. No.

DATE From/To/ Entity Doc. '. yise Dec. Descr10t10n l

l MNED 0098146 1/19/73 No Name/PG&E Hemo Flow from PORV's I pg.

deduced deduced GS-5 HNED 0098162 4/6/72 HLeppke/PGLE Hemo Numeric figures re pressurizer 1 pg.

relief valves GS-1 MNED 0098173 4/6/72 Hl.eppke/PGLE Hemo Info re clearing pressure prog.

6 pgs.

deduced on pressure relief line GS-1 l

HNED 0098182 4/6/72 No Name/PG&E List Numeric list re 3 relief valves 2 pgs.

deduced L

GS-1 1

I MNED 0098185 11/27/74 RMLaverty/

Eng. Change Order to revise insulation of 3 pgs.

, Order safety relief valve loops j

GS-1 i

MNED 0098197 2/24/76 No Name/PGLE Hemo Release to startup pressurizer' I pg.

heaters GS-1 N

11NED 0098098 2/24/76 MRTresler/PG&E Hemo Release to start up pressurizer 1 pg.

heaters GS-1 4

HNED 009C227 2/1/79 VLKillpack/PG&E Homo Construction problem sheet te I pg.

. deduced pressurizer relief valve loop drains GS-1 Ti I

a Doc. No.

1)AT t; trom/To/ERLILY IJOC. Type IJO C. Im sc t lption 9

I i

~

s, s

i i

HNED 0098245 4/27/77 JDTownsend/PG&E Hemo Pressurizer safety valve problem

(

l pg.

deduced is resolved GS-1 j

l MNED 0098246 10/11/77 RMNanninga/PG&E Report Discrepancy rpt for pressurizer I pg.

safety valves l

GS-1

'e MNED 0098257 7/18/77 DYoung/PG&E Memo Phone message re pressurizer heaters j.'

1 pg.

terminations GS-1 HNED 0098265 6/20/77 WEColey/PGEE Test Procedure Test rpoc. No. 37.14, Units 162-18 pgs.

deduced pressurizer heaters initial energizing

.l GS-1 O

MNED 0098286 5/3/77 WEColey/PG&E Report Rpt on startup problem of pressurizer t

I pg.

heaters GS-1 MNED 0098287 5/3/77 WEColey/ PGE E Report Rpt on startup problem of pressurizer 1 pg.

heaters l

GS-1 l

1 I

i 1

l l

r 4

II Doc. No.

DATE Prom /To/ Entity Doc. Type Doc. DescripElon

~~ ~

e MNED 0098311 6/14/76 JDTownsend/PGLE Test Procedure Test Proc. 137.13., Units 1&2 -

7 pgs.

deduced Ilot functional test pressurizer GS-l control & pressurizer pwr operated relief valves MNED 0098318 1/13/76 JbTownsend/PGEE Report Rpt on startup problem of pressurizes I pg.

relief valve, 8010D leaking excessively GS-1 MNED 00983*o 12/24/75 JDTownsend/PGEE Report Rpt on startup problem of pressurizer 1 pg.

heaters GS-1 HNED 009fC

.)75 JDTownsend/PGGE Test Proc.

Test. Proc. 37.13 - Ilot functional 7 pga.

oect

  • d test pressurizer pressure control &

GS-1 pressurizer pwr operated rellaf valves i

(

MNED 0438336 5/21/75 JRappa/PG&E Report Equipment modification rpt contractor 1 pg.

IIProley to change pressurizer pwr relief GS-1 stop valves $8000A, 8000D & 8000C -

install interval jumpers.

l MNED 0098339 3/7/74 Dit Pa tton/ PGE E Test Proc.

Startup test proced, 7.10 - pressurizer l

11 pgs.

deduced spray & heater capacity & continuous GS-1 210w setting.

MNED 0098374 11/10/74 No Name/PG&E Tant Proc.

Megger Test & current transformer check 4 pgs.

for Westinghouse 480v pressurizer heaters l

GS-1 l

l i

MNED 00983/A 2/10/71 No Name/PG&E Te'vt Proced.

Megger test & current trans. check for 4 pgs.

Westinghouse 480v pressurizer heaters GS-1 1 attach.

MNED 0098382 2/10/71 No Name/PG&E Diagram Diagram showing Westinghouse 480v 1 pg.

deduced pressurizer heater orientation GS-1 i

y m.

+--

r

.A.-

l t

4 l

1 b

1

}

]

Doc. No.

DATE From/T6/Eility D$ Type Doc. Describtlon 1

l ll l'

l ld MNED 0098465 1/19/70 No Name/PG&E Test Electrical performance test-CCPP i

4 pgs.

GS-1 l l MNED 0098819 10/29/73 MNChandler/

Hemo nitial setcing test of press.

2 pys.

DVKelly/

R/SV be made GS-5 i

i i

MNED 0098928 12/15/80 RCYoungdahl/EPRI Ltr rpt Pwr Utilities position on NUREG 0737 f

l 6 pgs.

DGEisenhut/NRC I

GS-1 l'

4 HNED 0098934 10/80 No Name/PG&E Memo Rpt Suggested response to NUREG 0737, f

I pg.

deduced Chief exec. off, of Utilities I tert II.D.1 CS-1 w/ pressurized wtr reactors i

l I

l MNED 0098936 12/10/80 JJCarey/EPRI Memo Attached responsen prepared by EPRI l

1 pg.

Tech. & Licensing contracts valve proj. staff EPRI/PWR S/RV test prog.

2-

M O

G O

O s.

C.

C>

m I

l w

E I

L f4 l

a C

C he C

C a

C.10 M

CC I

c, he m

=e C..C '

u e

Q 10 M 10 C

iC 10 *a C

C O S4 C, u Q

fD C O

Cd 3

C E ID L

t C'

d J-g 1

  • e 9

A e

M I

O C.

i O

E C

l 9

m E

4 CIJ ss w

%b l

g i

d M

41

>=

C e

O he

'O C.

.9 C

E 0

"C b.

L E

O C

m oO q

W W 3 N

9

%t nc oC

=

C aO C

N me m

Q e

O C

  • d Z

C 61 I

C Cam O

I a

O Z m 41 4

C ENC 5

I i

~

n a

l l

e en so us oa hH gn:

i e trs s

e e.v Wtl pa

& ev d

E

.f e

g o

Gji I

r Pol 8

U p

re d pr I

t e

E D

s t

.d e

cpe I

I t

art t oa U

8 V

nCr R

o e

U"

/

c.p S

to I c R

Rer C

W Pl w OD P

Eep i

eD t

r Y

r e

T o

t p

t 0

e e.

80 R

I 1

0

/

y n

t I e i

Hk t

Pc n

K Ea

/r

/o eC

~

c l

T bM

/

u m

o Am Ei r

TJ F

0 8

/

K 0

r 3

N

/

7 l

7 9

1 9

9 o

0 N

0 D g1

.c Ep-4 S

o f

G i

D f 1 il

, j li.

l, I

1lll!ll1l\\

lll j1 ll1 llllll l

l l

l l

re s

tu e

p v

V n

l Rho a

Ot c v

Po Gbe k

S v

c

" &l o

a l

v b

1 "V 8/Re V

1 Om R

/Pa O

4 s

P r

G deo S

ezt ti g

arn n

e dui i

sa n

rnt r

t er e

l re c

n pp n

o n

o o"

s c

W or st e n

n b o

W odm i

ieu t

n.

a tt e

cc m

D eel r r

rreo o

rrdr f

.c ooor n

o Ccme I

D ep r

y e

T t

t t

e, t.

e c

s I

t (D

E E

y t

EG EG i

&PI

&PI t

G/R G/R n

P yP PyP E

/tE

/tE

/

yr/

yr/

o l ee l ee T

l vl l vl e a. b eab

/m Kt u KI u o

VMA VMA r

DRT r,R T F

1 8

1

/

0 4

/

E 1

1 T

/

/

A 5

4 D

?

4 0

8 4

4 9

9 9

9 0

0 o

0 0

N D g1 D g1 Ep-Ep-c N

S N

S o

MI (.

M1 G D

C m

Doc. H67 DATE * -~""" Prom /To/ Entity Doc. Type Doc. Description e

t l

I l

MNED 0099518A 4/22/81 No Name/EPRI List Attach. 15 PORV Screening Criteria 1 pg.

GS-1 l

HNED 0099519 5/13/81 HI, ave r ty/ PG& E Hemo-Transmits copy of data on PORV & block 1 pg.

GWu/PGEE valves. Also corrects record of phone GS-1 call to G.Cherny on 5/11/81 w/l attach.

l MNED 0099520 3/2/81 ANovak/PGER Data Sheet Data on PORV & block valvis i

2 pgs.

j GS-1 I

e

,1 t

os C

nu R

or l

f dheTv or s

l to i ca f

siV o

ym f n l ay na e

ant il v

nye p

l aDf e

a a

vn v

r" S.

l o ai k

ode r "m vt c

i rl ee c

o ptzt ka l

iis c

B oe e

et ry l v t nuS aes bl s

e n

d sg a

e r

o peen gv e

i usri n

d 7

t uPp ik n

3 p

& o i tc e

7 i

hfP so.

t 0

r w go el t

c en e

ubs A

G s

iisg q h E

e vtir e pc f

R D

essa roa o

U 1 e yh l t N

O Wl c I et t

t as Rva s

co eyni Pe/

i e

D RbAD Edw L

R s

e n

i p

y r

H T

e t

o t

t m

s g

c e

e i

t o

L M

L M

D s

tca e

t s

n u

o o

C hg g

n n

y Ei i

t

&t s

i Gs I n I

I t

Pe Re R

R n

/W Pc r

P E

y/

Ei E

E

/

t y

/L

/

/

o rh y

e e

T ep e&

m l

/

vr r

a b

m au ah N

u o

LH Cc A

r ME Je o

E F

RJ JT N

T m

1 1 '

8 1

1 8

/

8 8

E

/

0

/

/

T 5

1 8

8 A

/

/

/

/

D 5

4 4

4 g*.

7 9

1 2

3 q

2 3

3 3

5 5

5 5

9 9

9 9

9 9

9 9

o 0

0 0

0.

0 0

0 0 n it g

D g1 D g1 D g1 D p1 c

Cp-Ep-Ep-E o

N S

N S

N S

N0S l

1 G H1 C N1G H1G D

f 4,

!l s

e v

l av kco l

b VR a

O PGS 1

1 0

e 1

r 0

9 n

1 o

t i

d t

i a

e m

D o

r f

co n

I D

ep r

y T

e t

t

.c e

o L

D

~

E l' y EG i

t

&PI n

G/R H

P yP

/tE

/

o yr/

l ee T

/

l vl m

eab o

KLu Y

r VMA P

DRT 1

8 E

/

T 1

A

/

D 4

0 9

5 9

9 o

0 N

0 D g1 c

Ep-o N

S i

M1 G i

~

Ii:i llllll1;

-- :----. - ~

y

-~

Doc.~ Ho.

OATE -~ ~ '-

Fi6?ii/ To7 E n t i t y Doc. Type Doc. De50ilFE10h B

MNED 0099591 4/31/81 JJCarey/EPRI Memo Transmits status rpt on valve 1 pg.

Tech. & Licensing ' ' tacts selection & justification effort, w/ attach.

GS-1 MNED 0099592 3/16/81 TEAuble/EPRI Project Descrip.

Attach. Il re: Safety Valen Selection

& Justification T.msk, w/3 attachts.

2 pgs.

deducod GS-1 MNED 0099594 3/16/81 TEAuble/EPRI Report Attach. il Pressurizer :iafety Valve l

Selection & Justification Task 12 pgs.

l GS-1 MNED 0099606 3/16/81 TEAuble/EPRI Report Attach. 12 Power Operated Relief Valvo l

Selection & Justification Task o pgs.

GS-1 MNED 0099612 3/16/81 TEAuble/EPRI Report Attach. 13 List of PWR Utilities, Plants

& Pree.urizer Safety Valves, P3wer 13 pgs.

Operated Relief Valves GS-1 l

l l

1 l

l l

l l

wig poc. 13 0 DATE Pf5in7T5/EiiE1[Y I)oc. Type poc. De scirilit 16n e

1 l

HNED 0099691 2/13/81 GAnderson/MPR Assoc.

Summary EPHI Safety Relief Valve Test Program 3 pgs.

QA Program Survey Status GS-1 t

HNED 0099707 2/16/81 JJCarey/EPRI fan t te r 2/81 Description & Status Rpt 1 pg.

GS-1 I

l

.~

-w a

i 2 III Doc. tio.

DATE ~

Prom /To/ Entity Doc. Type Doc. Descript10Ji e

MNED 0099722 2/81 No Name/EPRI Report EPRP/CE Safety / Relief Valve Test 65 pgs.

Facility Description & Status GS-1 HNED 0099708 1/26/81 DADrand/PG&E Hemo Research Contributions 2 pgs.

RAClarke/PGES GS-1 MNED 0099790 1/26/81 J1Carey/EPRI 1.e t te r Attach for info interim rpt " Assessment I pg.

of analysis Methods for PWR Safety /

GS-1 Relief '/alve Discharge Piping" MNED 0099791 12/80

!Io Name/EPRI Report Assessment of Analyris Methods for PilR 132 pgs.

Safety / Relief valve Discharge Piping GS-1 9

-.ma-

- m

..4 *i e

i

-i j

i I

l ~ Doc. No.

DATE From/To/ Entity' poc. Type ~~

D66"~DH Iftption

~ ' ~ ' ' ' '

e 4

i j

MNED 0099930 1/20/81 DVKelly/PGEE Letter Request for info concerning relief &

l 1 pg.

JJCarey/EPRI Safety valves ll CS-1 4

a k

l 1

4 1

i i

1 i

4 s

i 3

i 3

1 4

4 4

b 3

p w

...r..

- ~

o. ---

. 6 m - --

_ _,,_ _,,m,

M e*

.~

  • - ~,

,5..,;.,.

.n_,_

, k

  1. ,4

~

^'

occ. 13 0 DATE From/To/ Entity

-Doc. Type Doc. D6scription MNED 0100302 7/6/81 DABrand/PG&E Memo EPRI Valve Test Prog.

I pg.

GAManeatis/PG&E GS-1 MNED 0100303 7/7/81 DABrand/PG&E Letter PJ&L Participation in a joint block I pg.

DSaxe/EPRI valve test prog.

GS-1 I

h MNED 0100305 6/16/81 Fl.Cullec/EPRI Letter Present status of the safety & relief 1 pg.

Chief Exec. Off. owning valve prog.

GS-1 pressuriz*d water reactors Mt1ED 0100316 6/15/81 FIfuller/EPRI Letter PWR block valve test program 2 pgs.

Chief Exec. Off. owning CS-1 i,ressurized water recictors

( -.

I l

_ rww -

DKTE Fii>fn/ T5/ Ent i ty UUc. T yI>s

-' D50. il5 NC f i lit I GH

~

l Doc. No.

i i

.I i

c l.

i HNED 0100335 7/1/81 JJCarey/EPRI I,etter Ref. I ltr, P. Culler to Chief Exec.

2 pgs.

Tech. 6 I.icensing Contacts Officers owning pressurized water l

OS-A reactors, 6/16/81 l

1 l

t j

MNED 0100398 7/1/81 KPBaskins/SCE Letter San Onofre Nuc. Generation Station j

1 pg.

FMiraglia/NPC Units 263 l

GS-1 I

i

+

i f

l 1

1 1

l

Doc. H5.'

' '91 ATE

~~F7oE7TJEtTtv Doc. Type DOC. UE RcTllit lGR

~

e l

f I

I HNED 101692 8/4/81 DSnas/EPRI Letter Masonallan Pwr operated relief valve j

1 pg.

w/2 attachs.

j GS-1 1

l MNED 101693A 8/4/81 BSans/EPRI List Attach 2 List of plants w/Masonellan PORV's I pg.

GS-1 l

I HNED 101694 8/4/81 CWSullivan/EPRI Ietter PWR block valve data verification w/2 attachs.

I pg.

GS-1 HNED 101695 3/25/81 JJCarey/EPRI Letter Attach 1 PWR block valve test prog.

I pg.

GS-1 i

l HNED,101696 3/81 CWSulilvan/EPRI Survey Attach 2 Catalogued table of responses 5 pgs.

deduced

]

GS-1 1

l

/

e. -

l l

Doc. Description Doc. No.

DATE From/To/ Entity Dec. Type.

e t

l l

l l

1 i

Valve test of CCI PORV prelim. data

(

MNED 101707 6/29/81 TEAuble/EPRIl Letter w/ attach.

j 1 pg.

L PGEE supplement responses re Docket HNED 101721 2/26/81 No Name/PGEE l Letter 50-275 & 50-323 w/ attach. 17 (Inc. doc.)

FJMiraglia/NRC 2 pgs.

GS-1 Contingency analysis v/ attach.

Letter MNED 101745 6/26/61 JJCarey/EPHI Ltr w/ list & ltr w/3 rp+s I pg.

l GS-1 Attach. 2 Definition of level 2 acceptance MNED 101908 6/81 RTDrandt/Dabcock & Wilcox Rpt criteria for pressurizer safety valve PORV LRcartin/"

" Fall Back" Positions 73 pgs.

DADoss/"

GS-1 JWHerchant/"

PWong/"

WLDloomfield/"

Cover 1tr w/ attach offering of Anco MNED 102041 6/25/81 Dr. SHChien/Anco Eng. Inc.

Letter svc to PG&E RLaverty/PGGE 2 pgs.

GS-1 Attach 1 Description of Anco Engineers l

MNED 102042 6/81 No Name/Anco Eng. Inc.

Summary capability to analyze PORV/SRV to meet l

1 pg.

NUREG 0737 GS-1 s

Attach. 2 Anco Eng. Inc. Brochures MNED 102043 6/81 No Name/Anco Eng., Inc.

Brochure 1

7 pgs.

l GS-1

t

,4 8 )e e

/

e Doc. No.

DATE From/To/Rntity Doc. Type

~~

Doc. Desc21plion s:

=

_e HNED 102067 6/15/81 FLCuller/EPRI I.etter 2nd Attachd ltr transmits HURE 0737 2 pgs.

new requirement for qualification of CS-1 PWR block valves w/2 attachs.

\\

l l

MNED 102100 6/15/81 TEAuble/EPRI Summary Attach I sursary of principal 2 pgs.

observations "As Tested" Whyle Phase GS-1 test Mcurix for the dresser relief valve

~. _ _ _ _ _ _.

MNED 102424 6/3/81 Dr. SIIChien/Anco Eng. Inc.

Letter Transmits Anco's desire to help Co.

I pg.

respond to NURPG 0737 w/ attach.

GS-l' c

1--

MNED 102425 6/3/81 Dr. SAChien/Anco Analysis Attach PWR valve qualitication 1 pg.

analysis to NRC Hureg 0578 &

GS-1 0737 requirementu

~._.

~

Doc. Hn.

DATE From/To/ Entity Doc. Type Doc. Desdriptibn e

s MNED 102435 5/28/81 DPilof fman/ Consumer Pwr Co.

Report Attach b Prog,. output / Submittal to 19 pgs.

utilities / submittal to NRC GS-1 HNED 102531 9/11/81 AJWheeler/EPRt I,e tte r Transmits 2 docs backpressure 1 pg.

calculations & piping data w/2 attach.

GS-1 MNED 102532 9/11/01 AJWheeler/EPRI Report Attach 1 EPRI/PWR valve prog back-9 pgs.

pressure calculations GS-1

~

MNED 102542 9/11/81 AJWheeler/EPRI Report Attach. 2 Piping data run 526 Crosby 53 pgs.

3k6 valve w/,long inlet pipe GS-1

)

I-

./ 'j i

Doc. tio.

DhTE Prom /To/ Entity Doc. Type Doc.'bescrip~l6n t

e HNED 102611 8/81 JJCarey/EPRI Summary Attach 3 Sum. Rev. of safety valvo results 19 pgs.

GS-1 MNED 102630 8/81 JJCarey/EPRI Summary Attach 4 frannatome safety valve efforts 14 pgs.

GS-1 4

l HNED 102644 8/81 JJCarey/EPRI Analysis Attach 5 upstream piping / safety valve analysis 1

32 pgs.

i GS-1 I

I MNED 102691 8/01 JJCarcy/EPRI Analysis Attach 9 Downstream Piping analysis 5 pgs.

GS-1 t

Attach 2 compilation of the list of 1

List MNED 0103040 8/26/81 No Name/EPRI block valves used in PWR's l

deduced l

6 pgs.

,GS-1 Attached draf t copy of the valve MNED 0103355 JJCarey/EPRI Memo selection / justification rpt from EPRI 1 pg.

Utility tech. contacts w/l Ettach.

GS-1 l

4 a

Doc. IIo.

likiE ~

Prom /To/Er.0ty poc. Type Doc. Desct'aption s

MNED 0103738 10/8/81 Hnilanin/EPRI Memo Attached draft plant conditions 1

1 pg.

T&L contacts justification rpt for Westinghouse GS-1 plants w/1 attach.

l MNED 0103739 10/8/81 No Name/ Westinghouse Report Attach I rpt re S/RV inlet fluid j

50 inj a.

deduced condition during valve actuation in j

GS-1 Westinghouse-designed plants e

l l

I i

~~

~ '.

DATE '

From/To/ Entity Doc. Type Doc. Description No Doc.

e j

HNED 103947 4/1/70 EllFrye/ Westinghouse-deduced Report General pressurizer vest. ell assembly 56 pgs, w/2 attachs.

GS-1 E

i HNED 0104003 5/67 No Name/ Westinghouse Drawing Attach I title-shipping assembly 1 pg.

deduced I

(Oversize)

GS-1 l

MNED 0104004 3/69 No Name/ Westinghouse Drawings Attach 2 title - Outline (oversize)

I pg.

GS-1 MNED 0104093 8/18/71 WGMcKeown/ Westinghouse Report Title Pressurizer spray & heater 13 pgs.

capability & settling continous spray CS-1 w/5 attached drawings MNED 0104106 3/69 JWDorrycott/ Westinghouse Drawing Attach I general assy & final I pg.

deduced pressurizer GS-1 MNED 0104106A 3/69 JWDorrycott/ Westinghouse Drawing Attach 2 general assy & final Mach I pg.

deduced (After hydro test) pressurizer GS-1 l

i

Doc. No.

DATE ~ ~~

From/To/ Entity Doc.-~Typs Ucc. Hencription e

MNED 0104107 2/70 JWDorrycott/ Westinghouse Drawing Attdch 3 Girth & long weld seem 1 pg.

orientation pressurizer GS-1 MNED 0104100 2/70 No Name/ Westinghouse Drawing Attach 4 Girth & long weld seam 1 pg.

- orientation pressurizer GS-1 MNED 0104109 11/69 JWDorrycott/Westinghosue Drawing Attach 5 as built comparison 1 pg.

dimensions pressurizer (6" relief GS-1

& safety)

I I

l l

' ' ~ - - - - - ~ _ _ _, _ _

~_

"h a

Doc. Ilo7 DhTh Prom /To/ Entity Doc. Tyge Doc. Descfliition

~

MNED 0104324 9/9/01 HCGarg/NRC Memo Trip npt audit of PGLE documentation I

6 pgs.

ZRRosztoczy/NRC concerning environmental qualltication GS-1 of electrical equipment por HUREG 0588 for 9C units 162 I

I i, -

,,1 j

e s

lI I I

_u_______

';;' ',. 4.o. ; ~ ?"M' m'L

~*

9

_[

i l

Doc. tio.

DATE From/T6/Entify D60. Typo ~

D6c. DadcrIDLIDH l

MNED 0104373 10/22/81 JVRocca/PG&E Hemo PORV" block valves designated as 1 pg.

JDiloch/PG6E instrument class II. DC Units 1&2 GS-1 HNEb 0104398 8/5/81 ACheutbecher/IT&T corp.

Letter Response to PG&E's inquiries res 2 pgs.

GMJoore/PG&E IEEE qualification of ITT Nil 90 actuators GS-1 HNED 0104426 10 / 2'J i O Paul Provence /PGEE Hemo New correspondence file numbers in mechanical & nuclear file room 1 pg.

GS-1 MNED 0104460 4/28/81 LRDenson/ Westinghouse Letter Limitorque SMD-00 operators failure 3 pgs.

DVKelly/PG&E of 2 valve operators meet requirements established by Westinghouse GS-1 Facsimile use request PORV & PORV MNED 0104891 10/22/81 LRDenson/ Westinghouse Letter

. block valve seismic qualification 1 pg.

JVRocca/PG&E GS-1

Doc. No.

DATH FTom/ To/ En t i ty tIDC. TypG UDC. UUs011ptIDH e

I MNED 0105140 7/79 No Name/NRC Report HUREG 0578 THI-2 lessons learned 161 pgs.

task force status rpt & short-term GS-1 recommendations MNED 0105685 2/80 No Name/ Tech. for Eriergy Corp.

Report Draft 2.1.3.a direct indication of 1 pg.

PORV & S/V position calibration of i

GS-1 the acoustic monitors are described MNED 0105686 2/80 No Name/ Tech, for Energy Corp.

Report Draft 2.1.3.a direct indication of

(

l pg.

PORC & S/V position calibration of GS-1 the acoustic monitors are described l

MNED 0105692 2/80 No Name/ Tech, for Energy Corp.

Report General description acoustic valve j

16 pgs.

position indication systems for nuc.

GS-1 plants MNED 0105715 2/80 No Name/ Tech. for Energy Corp.

Report Tec 914 S/RV flow indicator eng. analysis 4

21 pys.

& design support services GS-1 MNED 0105736 9/14/79 No Name/ Tech for Energy Corp.

Rpt & Diagrams Tec 1414 valve flow monitor system 21 pgs.

purpose, measurement theory, hardware GS-1 descriptions general

m

' 1H ll Iioc. hot fiATE~~

~ Pf 6m/t67 Rh f.i t'y '

- ~~~~'-

Doc. ' TyTid '

~

Doc. Ddscription e

MNED 0105786 1/31/80 JBHoch/PGEE Report Design changes DC Units 162 Design 6 pgs.

documents list. documents affected GS-1 by' design change notice 1

MNED 0105776 1/18/80 JWRizzi/ Tech. for Energy Corp.

Letter Enc. copy of technology for energy 1 pg.

RJStreich/PG&E corp's quality assurance manual.

If GS-1 ma n c.- 1 in controlled, acknowledge receipt.

HNED 0105777 1/18/801 RJStreich/PG&E Rpt & Diag.

Design change DC Units 1&2,' pressurizer 3 pgs.

GHMoore/PGEE safety valves GS-1 HNED 0105803 10/79 No Name/PG&E Report Direct indication of pwr operated R/SV 2 pgs.

position for PWR's & BWRS (2.1.3a)

GS-1 HNED 0105805 10/9/79 PGJencek/ Tech, for Energy Corp.

Letter Ouotation for 2 3-channel valve flow 3 pgs.

GHMoore/PGLE indication systems for DC Units 162 l

GS-1 i

MNED 0105808 8/10/79 JEMott/ Tech. for Energy Corp.

Letter TEC offers a commercially available 1 pg.

valve flow indicator which provldes GS-1 unambiguous detection of flow through S/RV MNED 0105816 11/7/79 RWDeck/ Westinghouse Letter DC 1&2 critical systems leak monitoring 2 pgs.

RPBenton/PG&E s*/atem our SF12-0075 GS-1 HNED 0105818 11/79 RWneck/ Westinghouse Report Critical systems leak monitoring system 7 pgs.

GS-1

Doc. No.

UNrt; Fro *gyo/t;ntity poc. Jype voc. DusurApcAun i

MNED 0105825 ll/E/79 K.tKozak/Rockwell Int'l Letter Result of TMI incident NRC issued 2 pgs.

RLaverty/PG&E new regulation NUREG 0578 THI-2 GS-1

" lessons learned task force status rpt & short-term recommendations" dated 7/79.

HNED 0105827 11/6/79 KMKozak/Rockwell Int'l Letter Result of TMI inc!. dent NRC issued 2 pgs.

Thomas Crawford/PGER new regulation NUREG 0578 THI-2 GS-1

" lessons learned task force status rpt & short-term recommendations" dated 7/79.

MNED 0105829 5/19/78 No Name/PGEE Report Main steam S/RV position acoustic 6 pgs.

monitoring system GS-1 MNED 0105839 11/79 No Name/PGLE Report HUREG 0578-2.1.3 info to aid operators 3 pgs.

In accident diagnosis & control. NRC GS-1 lessons learned task force short-term recommendations MNED 0105842 11/79 No Name/ Westinghouse Report Westinghouse Acoustic leak monitor 12 pgs.

features, operation GS-1 r

MNED 0105855 8/79 No Name/PGEE Report Critical systems leak monitoring.

7 pgs.

systems technical description GS-1 MNED 0105862 8/79 No Name/ Westinghouse Diagrams Westinghouse proprietary figures 1-2 pgs.

system block diagram Fig. 2 ' typical

+

GS-1 system layout w/22 channels (5 base, 17 optional)

MNED 0105864 8/2/79 Gordon Shugars/EPRI Letter RV acoustic monitoring workshop 2 pgs.

THI Coordinators invitation GS-1

)

,w

_..m...__

)

s

-s s

3 Doc. Ho.

DATE Pr i>m / Tc,/ Un El t.y' ooc. Type noe. ver.ertptian y

_s s

MNEL 0105866 8/22/79 No Name/EIRC Agenda RV acoustic monitoring workshop 1 pg.

GS-1 s

T i

MNED 0105869 8/1/79 No Name/NtlS Corp.'

Report Comme'nts re RV & SV position for PWRS & BWR's HUREG 05'78 & peach 1 pg.

bottom acoustic monitoring system GS-1 s

e

}

)

Doc. No.

DATE From/To/ Entity Doc. Type Doc. Ddacrl[it165 e

HNED 0107420 8/29/81 GilMoore/ PG& E Report DC Units 162 component evaluation 12 pgs.

rpt, ret solenoid valve GS-1 HNED 0107432 8/21/71 JitC/ Unknown Table Elevations & S/H's of solenoid I

1 pg.

Frank Horl/PG&E valves in containment l

GS-1 I

l l

MNED 0107433 8/81 No Name/PG&E Report Elevations & S/H's of solenoid 6 pgs.

valves in containment GS-1 f

I I

l i

~

- "ll-

~

Doc. No, DATE Prom /To/ Entity Doc. TViie

- doc. ' lle sc P I DE ion e

MNED 0109138 11/7/79 RWDeckwith/ West.inghouse I,e t t e r PG&E DC 162 critical systems leak 2 pgs.

RPDenton/PG&E moriitoring system w/ attach, GS-1 s

MNED 0109140 11/7/79 No Name/Wentinghouse Study Attach critical systems leak

)

7 pgs.

monitoring system j

GS-1 i

I J

MNED 0109148 9/17/81 RMI.averty/PG&E Memo EPRI mtg to discuss status of the j

3 pgs.

File /PGLE S/RV testing prog. w/2 attachs GS-1 l

i i

1

'l l

m.

.m y,

_x_.

7

~ Doc. tio.

DATH Prom /To/EntitV~~~

D5c7TVpe 115cr tJt!Bt*fillrIUsi

~~

~

Mr.ED 0112021 2/3/81 HWDeutsch/ General Physics Corp.

I.etter Unsolicited proposals for eng. sycs l

1 pg.

GMoore/PGEE w/ attach.

GS-1 i

Mr4ED 0112022 2/81 No Name/ General Physics Corp.

Rpt Attach. proposal to evaluate S/RV &

57 pgs.

deduced discharge piping for pressurized water GS-f reactors MilED 0112080 4/22/81 GAcarpenter/Teledyne 1,etter TES unsolicited proposal 15646 j

8 pgs.

AWaltner/PG&E evaluation of ptessurizer S/RV w/ attach GS-1 Mt4ED 0112088 4/22/81 CACarpenter/Teledyne Resu:ne Resume Donald l'. 1anders 4 pgs.

GS-1 Mt3ED 0112208 4/22/81 GACarpenter/Teledyne 1,etter TES unsolicited proposal asegu 7 pys.

AWaltner/PGLE evaluation of pressurizer S/RV w/ attach GS-1

(

\\

E I.

E g

l C

3 e

e b

a f

"3 C

i e

se C

a O

C 34 O

W se c

k E

~

3

=

0 m

C C

C E

I I

i

'N

'M h

6 E

3 e

' ')

Q~

e' O

E C

I i

d N

C 1

5 Q

4 6

p s

I

.es be C

U

.~4:

M il C

q O

C N

p O,

i w

(

5 C

O O

1 w

aC L

O 5

0 U

i N3 CG 9

NT 4

%C

,.4

. O

  • T 4

i

.e 4

b N

a 4

I g

Q 4

Z o

m C 7*

a 2

N i

w A

,A l

C EdU l

f.

l a

e i

~

~ ^ * - * -*

w

.ow,

i I

tsuc. i so.

un a e, a a va.'s s us a set a L y uw-awu

'~6.

""*'**v

HNED 0112928 4/21/81 GCHinor/No Affil Affidavit Affidavit re Issues re to PORV's &

9 pgs.

No Name/PG&E block valves GS-1 HNED 0112940 8/10/74 No Name/Nestinghouse Report Dynamic thrust analysis of pressurizer i

70 pgs.

No Name/PG&E SV discharge piping system GS-1 i

HNED 0113013 8/5/18 No Name/PG&B flandwritten Res Pressurizer code safety valve 1 pg.

No Name/PG&E Notes l

CS-1 HNED 0113014 5/19/81 No Name/PG&E IIandwritten Model 138-20771 all PORV Unit 1 1 pg.

No Name/PG&E Notes GS-1 i

L l

l l

i l

l l

l a

f

.wnw I

"C-TYl*

Doc. Description I

HN 0113015 3/2/91 No Name/pG'E ilandwritten PoRVes cs_1 Notes HNED 0113017 4/1/81 1 pg.

DvKelly/PGsE GS-1 RMI,averty/PG&E I.e t te r IMR block valve test PG&E file TEAuble/EPRT 3161.52 Unita 1&2 Diablo il l

MNED 0113018 4/1/81 TEAuble/EPRI 1

2 pgs.

deduced I.etter GS-1 Velan block valve MNICD 0113020 No Name/PGLE j

1 pg.

llandwrit ten j

GS-1 Block valve drawing i

notes MNED 0111030 1/20/81 DVKelly/PGEE 1 pg.

,tter GS-1 JJCarey/EPRI EPRI S/RV test prog.

l MNED 0113032 I pg.

No Name/PGLE Diagram Velan paessurizer relief block valve GS-1 MN 0113033 12/26/79 No Name/PG&E llandwritten GS-1 PORV valves Notes 1

MNED 0113036 10/10/80 PACrane/PG&E 1 pg.

I,etter GS-1 Albert Schwencer/NRC Overpressure transient protection for the long-term DC l&2 l

1 1

t eoc.

i.o.

im e r.

e a u, a ur em t a ty uus.. i v i.e ous,. uu... m. v..

HNED 0113037 No Name/PG&E Outline To startup & shutdown overpressure 7 pgs.

Protection l

GS-1 l

MNED 0113046 7/21/78 DilStitt/No Affil Outline Calibration testing for pressurizer i

4 pgs.

No Name/PG&E Relief valves GS-1 MNED 0113051 No Name/PGLE Summary Summary of pressurizer safetles set-1 pg.

Outline point testing l

GS-1 MNED 0113052 1/16/80 SETraisman/ Westinghouse I.e t te r A TWS conditforse valve testing 1 pg.

HRDenton/NRC GS-1 l

I

>1ED 0113056 3/79 No Name/PG&E Table Valve qualifications llosgri evaluation

pgs.

GS-1 MNED 0113068 11/80 No Name/NRC Plan Clarification of THI action plan 4 pgs.

No Name/PGLE requirements GS-1 I

MNED 0113072 5/80 No Name/NRC Plan NRC action plan developed as a result 5 pga.

No Name/PGLE of the THI-2 accident GS-1

i t

f s

i l

4 a suu.

..v.

u.. + n.

..v,

. v,..... = 6 r

  • 2r

---**e-+-**

i MNED 0113077 80 No Name/NRC Report TM7-2 Lessons learned Task Force i

2 pgs.

No Name/PG&E Status Report cad Short-Term GS-1 Accmmendations l

MNED 0113082 4-9-81 RHEngelken/NRC Cov. Letter Encl. NRC Bulletin R Valve Failure 1 pg.

PACrane/PG&E GS-1 MNED 0113081 4-9-81 RHEngelken/NRC Report Failure of Gate Valves to c'e'e 1

8 pgs.

PACrane/PG&E against Differental pressure GS-1 f

MNED 0113.J1 12-5-80 No Name Par-Report Re, 150 PSI Opavt from PORV (For limit, i

j 1 pg.

No Name condition for operation) l l

GS-1 1

l l

MNED 01:3102 12-5-80 Na Name/7 Partial Part concerns, Action to be taken in GS-1 No Har.e/7 Report case press Ltra are inoperable.

I i

l i

I '

I

  • l!

l MNED 0113111 1968 No Name/NP.C Regulations (Section III Nuclear Vessels-Class Al l

, i 6 pgs.

Article 9 l

GS-1 Protection Against Overpressure l

i I

L

.a mi t joc.

i.u.

am a c.

e a o..y a up r..

o a o y asuu. ayvu uvv.

u= =u a v ' a s...

HNED 01:3117 1971 No Name/NRC RegulationsSection III Article HD-7000 Protectiun 9 pgs.

against overpressure GS-1 MNED 0113126 9/75 No Name/PG&E Table Section III Piping systems I pg.

GS-1 MNED 0113127 7/80 No Name/PG&B Partial Rpt Classification of structures, 3 pgs.

components, & systems GS-1 MNED 0113153 10/71 No Name/NRC Cover Page Transmitted herewith I pg.

PACrane/PG&E GS-1 MNED 011J154 10/71 JMGeets/ Westinghouse Rep rt Topical rpt overpressuire protection 15 pgs.

PACrane/PG&E for Westinghouse pressurized water GS-1 reactors I

l MNED 0113185 3/13/81 POSI./PG&E Phone Record Discussing design codes for PORV's 2 pgs.

CNirst/ Westinghouse

& SRV's GS-1 MNED 0113187 5/5/81 Buuckley/NRC Phone Record Valve specifics for DCPP 2 pgs.

DSlew/PG&E GS-1 m

l *1 e

=

Doc. No.

un a r, r a umi t oi r.n t i ty.

WC. 8Yl*

WC -

"""'12D""

l MNED 0113189 5/6/01 GCWu/PGEg Phone Record Valve specifics for DCPP 1 pg.

FCherny/NRC GS-1 HNED 0113191 5/14/81 Rouckley/NRC Phone Record Request for info on valve positions I pgs.

FCWu/PGLE of PORV's Riock, & Safety valves GS-1 MNED 0113198A 5/11/01 RSiluffman/

Hemo ppt Certification w/ refurbishment of I'pg.

SNChin/EPRI GS-1 electromatic relief valve i

l HNED 0113233 5/13/81 TEAuble/EPRI Letter Trar.t.mitted he mwith I pg.

RLaverty/PGEE GS-1 MNED 0113261 1/13/81 JJCarey/EPRI Cover 1.tr Transmitted herewith I pg.

GS-1 HNED 0113304 3/24/81 JJCarey/EPRI cover Ltr Attached valve status rpt I pg.

GS-1

_~

NNED 0113336 3/21/75 No Name/PGE Drawing of Pressurizer relief line 1 pg.

CS-1 MNED 0113337 8/80 No Name/PGEE Drawing Of PORV 1 pg.

CS-1 MNED 0113338 8/6/80 No Name/PGLE Drawing Data outline 1 pg.

e

00c. a v.

. m a r.

rav iavin.iitaty ouv. aypu uuc. uw.ca apuces MNED 0113339 1/21/75 No Name/PCEE Drawing Of pressurizer RV system 1 pg.

GS-1 MNED 0113354 10/20/76 AGwalther/PG&E Hemo Response to DP-p.1116-M Pre-I pg.

File /PG&E operational piping dynamics effects GS-1 test prog.

l MNED 0113484 7/7/78 DilStitt Report Calibration testing for pressurizer l

l 4.pgs.

relief valves CS-1 l

l MNED 0113522 7/21/78 DilStitt Report Calibration testing for pressurizer.

4 pgs, relief valves I

cs-1

.~-,.

/ 't poc. teo.

unae, r a um, s ur c.iii.ny uvu.

y new u.~. uu w 4 e s.v..

I MNED 0114441 8/24/70 No Name/PG&E Sketches Air operated valve installation 4 pgs, sketches GS-1 P3NED 0114455 12/6/77 DVKelly/PGER I,e tte r Re Report 58228 titled " Seismic 2 pgs.

JJAnderson/WYLE Lab Testing-4 SRV GS-1 HNED 0114479 No Name/'destinghouse Report Westinghouse improved charging pump 12 pgs.

No Name/PGEE miniflow system modification GS-1 4

MNED 0114499 7/1/81 RCYoungdahl/EPRI Letter Status of EPRI/PWR S/RV 3 pgs.

Ilarold R. Denton/NPC NUREG-0737 GS-1 l

1 l

f I

I l

I C

i l

I o

my l

l J

i WG

\\

C e

O be m

3 A

T E

G C

O J

e o

1 m

w e

L G

=)

we 1

D J

m 3

C E

e e

d e

M

?

e n

k C

C m

a G

.G Q

se J

Q J

)

3 I

l i

d me

>w A

A D*

W i

s 5

.L C

I

.e 4

?

A 4

8 O

U

)

41 Efa m

m m

cc N

W f%

N e

e e

v O

M M

%C 8

e v

m

=

(

"o "o

C P.==

C Pv Wf 8 W G8

.d Z

L*J Z

Cf) k EaG Z=0 1

1 l

l l

'j e

a I.

Doc.'iio.

EhY'E" ~ ' ~ ~/ rom /To/ r:ntity SE Type Doc. Descriptirsn MNED 0114636 8/27/01 No Name/PGEE Diagram Diagr#.a i pg.

deduced GS-1 MNED 0114637 8/27/01 Garrett Pheumatic Sys. Div.

1.is t 3x6 straight thru POP.V Wyle test I pg.

configuration GS-1 MNED 0114645 9/22/81 No Name/PG&E Outline Proposal for eng. follow & evaluation 2 pgs, deduced of HRC mandated S/RV GS-1 l

MNED 011'652 r./31/81 No Name/PG&E Ilandwritten "No strategy on block valves-llave I pg, USlew/PG&E agreed "to EPRI Prog."

GS-L l

i9 J

_m.,,,,,...,,-.~.

-. + - 1m

's Doc. No.

DATE From/To/t<ntity 180 0 Type Doc. tiesertist1Gil l

MNED 0114694 6/15/81 FLCulle-/EPRI 1.e t te r New requirement for NUREG 0737, 3 pgs.

Chief Exec. Of f. owning PWR's qualification of PWR block valves w/l attach GS-1 MNED 0114697 6/10/81 No Name/EPRI Draft Study Attach 1 EPRI Task action plan for varification of PWR block valve 16 pgs.

functionability GS-1

~.-_.-. _.

HNED 0114724 5/5/81 DVKelly/PGLE Letter Analysis of R/SV to meet the requirements 1 pg.

JEMurphy/ Westinghouse of NUREG 0737 GS-1 MNED 0114724 5/5/81 DVKelly/PG&E Letter Analysis fo R/SV to meet the require-1 pg.

JEMurphy/ Westinghouse ments of NUREG 0737 GS-1 HNED 0114839 2/3/81 DSmith/Velan Eng. Cos.

Imtter Re b$ock valve 1 pg.

RLaverty/PG&E GS-1 MNED 0114840 12/79 No Name/Velan Eng Corp.

Report The 2 " ERV block valve RC-V2 &

performance importance in TMI acc.

12 pgs.

GS-1 HNED 0114853 No Name/Velan Eng Corp.

Catalogue Block valves & Other types of valves (2 h* block valve etc) 68 pgs.

GS-1

/'j i

g;

.__m ki% ?

~

.',g a.

Aq[

Doc. No.

f)EfE From/fo/ Entity Doc. Tyrie Dod. DE50fliH.lOn i

HNED 0115017 9/16/80 DKing/ Westinghouse I,etter "PORV sensitivity study" 1 pg.

SMSkidmore/PGEE GS-1 MNED 0115018 8/20/01 JJCarey/EPRI I,e tte r PWR S/RV prog. contingency analysis 1 pg.

DJorgenson/Wes t inghouse efforts l

GS-1 HNED 0115045 12/21/79 FFHautz/PGE&

Cover Ltr Enc. isometric drawings of piping 2 pgs.

.JCarey/EPRI Gs-1

.4HED 0115047 12/79 FFHautz/PG&B Tables Tables & Drawings on DC overpressure 6 pgs.

JJCarey/EPRI Protection Sys.

GS-1 HNED 0115059 11/79 No Name/EPRI Mtg Notes Discussed adding issues raised by 1 pg.

NUREG 078 CS-1 HNED 0115057 12/21/79 FFHautz/PG&E 1,e t te :

Discussing EPRI's relief valve system 2 pgs.

JJCarey/EPRI GS-1

-~.

HNED 0115143 12/11/79 JRStevenson/PG&E Hemo Valve testo startings test data 1 pg.

rail./

GS-1 HNED'0115146 4/1/80 WTracy/ Dresser Industries Letter THI Incident - Relief & safety valves 2 pgs.

FFHautz/PGEF.

(ASHB Codel GS-1

. a)

I 4

Doc. No.

DATF From/To/ Entity Doc. p pe

' Doc. Descr1Dt10ft HNED 0115151 2/26/80 CIEot sha ll /Wes tinghouse Letter itenpohne to request 1/11/80 mtg 1 pg.

JDEJeffries/

re PORV's & block valves w/ enc.

CS-1 MNED 0115152 2/26/80 CLGottshall/ Westinghouse List Attach. Identification of Westinghouse 1 pgs.

JDEJe f f ries /

supplied valves GS-1 Attach. General description & tech.

HNED 0115186 11/29/79 DKing/ Westinghouse Report parameters 9 pgs.

GS-1 HNED 0115227 1/23/80 DPilof fman/ Consumers Pwr Co.

Minutes Attach. Minutes of 1/21/80 mtg 3 pgs.

w/ attach A,B,c,D GS-1

5

+

fn' e

e a

CO

<*e eda be T

==

8 COO C

P 3

e

.J 3

9

-o to M

3e C

C O

3 a

=

3 e

O O

E.

Uh C

C he G

S t

E=

W DC e

U M

C C=

0 ee lel a

a C

O tas C=

C C

E=

E es E

Z O

he C

ti.

Z c4 r* G

%O W

c3 6'

N= T c

C

.= 9 m

N d

C.

.=

Z o

J 7-O k, C. I C

L m

~*

C 3*O i

9 O -

I Hlll 3

._ h&4.i h.

w.

w, --

., _, _,_ _ 4, m m... __

____,_.l l in l

ll g,,T -

-.., g r,..- :

_.2nr."

-, i i ll Doc. No.

DATE Frors/To/ Enti ty Doc. Type Doc. Description HNED 0116667 No Name/PG&E Report Description & analysis of Protective 14 pgs.

relief system for containment purge GS-1 valves DC 152 HNED 0116796 3/27/79 DVKelly/PG&E Hemo Solenoid valves, DCPP DCO-E-M-216

1. pg.

RDEtzler/PCEE GS-1 SG

el*

I (P

l e

C O

w I

U i

e 64 i

l Twe C

O 1

0 C

C D5 3

  • e sa O

O 9

==

h.s m

Oe C

e Q

l a

w I

a e

3 O

w l

o o

l 2

=

l l

C l

c w

L 3

T f*

O U0

=

0 ha O

Q.

I 2

l I

i i

t a

Ta2 a

.a C

0 D:

G.

O C

la E

w e

E Z

Ow O

in.

Z fa2 l

E*

1 A

8 C

l l

Nm e

m l

O m

2 o

C Om I

O h3 Q e i

O Z

to "T

  • C E-C t

f t

J r-

__,_ww--___._m-_v---,-+ - - - - - - - - - -- -- - - - _ - - - -,

-e---

f Doc. No.

DATE l' rom /To/ Entity Doc. type Doc. Descr1Dt10n HNED 0117078 1/0/81 No Name/Lonegran Co.

Record Index Lonegran Co supplier document record 13 pgs.

index for relief valves GS-1 MNED 0117094 5/11/79 DESmith/PGEE Reviewal Eng. Quality control dept, perform.

2 pgs.

RSpain/PG&E of PG&E QC Requirements GS-1 RDEteler/PG&E HNED 0117096 5/11/79 DESmith/PGEE Reviewal Eng. quality control dept. perform.

2 pgs.

RSBain/PG&E QC requirements GS-1 MNED 0117114 5/19/79 No Name/ Steam Specialities Co.

Purchase Order Please refer to above order da$ed 3/6/79 2 pgs.

RDEtzler/PGEE for safety valves GSel e

4 6

i 'j e

j Doc. No.

DATE Prom /To/ Entity Doc. Type Doc, Description HNED 0117327 10/19/73 JWSale/PG&E Memo Volume chambers relief valves 1 pg.

THCrawford/PGEE CS-1 MNED 0117370 No Name/ Westinghouse Info Package Material extracted from Westinghouse 209 pgs.

Introduction to pwr plant operation GS-1 prog.

l.

i l

)

i 1

e s

v.-

.....-('

q

~ Doc. No.

DATF.

From/To/ Entity

Doc. Type Doc. DescriEElon

' - ~

HNED 0117578 No Name/FG.E Data sheet S/RV', data sheet 2 pgs.

GS-1 HNED 0117612 5/7/91 Sochilk/NRC Summary License requirements for pending operating 42 pgs.

License applications GS-1 l

f MNED 0117861 No Name/Dechtel Report Control valves application & material l

34 pgs.

CS-1 l

l 4

1 i

l l

l I

')

i i

e 0

j'l e

4 inoc. Ho.

DATE From/?o/ Entity Doc. Tygis '

D6c. De86tiptioh e

MNED 0118727 3/13/81 BSLew/PGEE laone Meme S/RV & PORV design codes 2 pgs.

Carl ilirst/ Westinghouse (deduced)

GS-1 MNED 0118729 3/3/81 DSLew/PGsE Memo Comments on EPRI valve testing 1 pgs.

JUShiffer/PGEE prog.

GS-1 MNED -118730 3/2/81 DShew/PG&E Phona Memo EPRI Valve testing prog.

2 pgs.

RMLaverty/PG&E GS-1 l

MNED 0118731 2/20/81 HilSecha n/ PGE E-Phone Memo PORV's i pg.

Rilowe/ PG& E GS-1

.-----.~.

[

?

l MNED 0118870 10/22/81 JVRocca/PGEE Memo PORV block valves 1 pg.

J ntioch/ PGE E GS-1 I

i 6

l l

1.-_.

L l.

I I

i l

b C

4e

.,e 8mt

[

C

.c e ed =

Cf.

W2

\\

0 C=

l 0c c

I e

ese YW gl:

CC c

8-4 m

.=e d 3 l

na D.

c Ee

.-e OC k

U>

U M

e N C C

l 2

4 u Jo

,e eU l

.C M C c

4-O 44 l

I r

,y' l9

[

i I>

s e

G

' 'J e

'O C

O I

~.

i a

w w

4J C

3

' O.

Fe E

2 O

O 1

I b

.t eN

~

w R.

l eo 4:

t e

b kt 4

I Pb the

,O b

.z a-g g; 6 l

E b4 8

E4e c

h e

^

, <3

.-___m poc. tao.

h ATP.~~~~ ~PRiiE/ To / I:n L ily Doc. Typ6 Doc. Descrii> Lion

' ~

f EEDD 0119079 12/80 No llame/PGLE ligandwr i t t en Pressurizer heater connecting cablen I pg.

tiotes GS-1 EEDD 0119085 8/79 No Name/PG&E llandwr i t ten Press, heaters emerg. pwr adpply was 1 pg.

Notes class IE ltem GS-1 l

EEDD 0119086 8/16/79 J Biloch/ PG&E Hemo Engineer's material memo, showing 2 pgs.

No Name/PGEE press. heaters emerg pwr supply au CS-L class IE item e

I h

i l

1 4

k 4

4 e

m e.

I l(ll ll eg t

r n

u a

p l

o t

o n

c em r

n o

i t

a c

t as n

ee o

rv c

1 l

ma m

n av a

o r

r i

gd g

t ae a

p it i

i Da d

r r

c ce c

s i p i

e t o t

u a

am mr me r

eo et c

ht hs c

4o cy u

Sm Ss k\\l o

m m

i ly a

a T

r r

g g

a a

U i

i O

D D

d x

~

V l

l F.

F.

.E T

G G

S P

P I

/

/

/

5 e

e f

m m

/

a a

N N

8'm f

o o

F N

N 1

1 7

7

/

/

E 3

1 T

1 3

A

/

/

U 2

5 9

0 3

4 4

4 0

0 2

2 o

1 1

l 0.

0 i.

I s

D g1 D g1 c

Ep-Ep-e o

N S

t S

4 f

MIG MlC I

I[

,l c

l (l

- _. m e-

.__m.---

I l

y f.
- - - a 4.s.
-
-

~ ' _ g -

  • ]

' vs

j.,,.-

f s

s 4

poc. No.

DATE Prorn/To/ Entity Doc. Type Doc. Descriptibin s.

+

TCED 0121590 5/4/R0.

TERA Reference flear source attenuation of peak 60 pgs.

borizontal acceleration by KWCampbell Gs-1.

Reference Attenuation of peak horizontal

' TtED 0121650 12/80~

acceleration w/in the near source TERA 104'pgs.

- Gs region of snoderate to large earthquakes.

TERA tech. rpt 80-1 by KWCampbell TCED 0121754 11/79 Applied Tech. Council Report Proceedings of a workshop on earthquake 608 pgs.

resistance of Ilwy bridges helt! on 1/29-31/79 GS a l I

i t

O N

g o

l Doc. No.

DATE From/To/ Entity Doc. Type D00. D080f1pt10n l

l CEDD 0122363 No Name/PG&E Computation 260 meteorological test at DC 3 pgs.

Sheet w/11 attachs.

GS-1 CEDD 0122366 12/8/66 No Name/PGLE Diagram Attach 1 meteorological facilities 1 pg.

GS-1 CEDD 0122367 5/23/69 No Name/PGGE Diagram Attach 2 meteorological tower 1 pg.

foundation modification GS-1 CEDD,0122368 7/26/62 No Name/PG&E Diagram Attach 3 concrete guy anchors I pg.

GS-l i

i CEDD 0122369 7/21/62 No Name/PGEE Diagram Attach 4 erection diagram 260' l

1 pg.

deduced meteorological mast let used at GS-1 Bodega Bay l

l CEDD 0122370 7/62 No Name/PG&E !

Diagram Attach 3 details 260' meteorological 1 pg.

deduced mast let used at Bodega Day CS-1 6

CEDD 0l?2371 7/62 No Name/PGEE Diagram Attach 6 ladders 260' meteorological 1 pg.

deduced mast let used a2 Bodega Day GS-I CEDD 0122372 7/20/62 No Name/PGEE Diagram Attach 7 gratings 260' meteorological mast I pg.

Gs-1 CEDD 0122373 6/5/62 No Name/PG&P, '

Diagram Attach 8 Guy mast footing 1 pg.

GS-1 CEDD 01'2374 8/3/62 No Name/PG&E Diagram Attach 9 260' meteorological mast I pg.

GS-1 9

4 1

~ ~ ~

Doc. No.

L %TE Prom /To/ Entity poc. Type ucc. uunutapLaus CEDD 0122375 8/3/62 No Name/PG&E Diagram Attach 10 260' meteorological mast 1 pg.

GS-1 CEDD 0122376 7/20/62 No Name/PG&E Diagram Attach 11 Platform 260' meteorological 1 pg.

mast CS-1 I

i e

I l

l i

o e

~'

O 4.$

_a,..

_ N _

_ _ i

' ~

s g

Doc. No.

DATE Prom /To/ Entity Doc. Typo Doc. Description NPOD 0122378 7/13/81 WKeyworth/PGEE Memo Emerg. plan drill rpt 7/31/81 w/l attach 3 pgs.

GS-l l

NPOD 0122381 7/3/81 WJKeyworth/PGEE Report Attach 1 DCPP Unit 1 emerg. plan drill 7 pas, scenario GS-1

,I NPOD 0122388 7/23/81 WJKeyworth/PGEE Memo Emerg plan drill rpt 7/22/81 i

2 pgs.

GS-1 NPOD 0122390 5/2/79 JDShiffer/PGEE Hemo Discussion of emerg. exercise of 5/7/79 t

21 ~ pgs.

GS-1 NPOD 0122411 10/19/81 JOSchuyler/PG&E Transmitt.al I.tr Additional request for VPEGM authorization

,I 1 pg.

GAManeatis/PG&E for a study of earthquake effects on DC j

GS-2 emerg. plans / w/2 attachs 1

NPOD 0122412 10/12/81 Bob Cudlin/TEFA Transmittal Ltr

' Attach I earthquake emerg. planning

)

1 1 pg.

SMSkidmore/PG&E follow-on taska proposal ITR-81-1401 GS-2 w/es:s.

NPOD 0122413 10/12/81 Bob Cudlin/ TERA Report Enc. 1 Proj. summary estimated budget l

8 pgs.

deduced SMSkidmore/PG&E l

GS-2 i

j NPOD 0122421 10/12/81 Dob Cudlin/ TERA Summary Enc. 2 Tl A Corp. feet for sycs 1

I pg.

deduced SMSkidmore/PGEE j

GS-2 NPOD 0122422 10/12/81 Dub Cudlin/ TERA Change Form Enc. 3 Job change form 1 pg.

SMCkidmore/PGEE GS-2 i

s l

,)

f.

s Doc. No.

DATE From/To/ Entity poc. Type poc. Descr1Dtion HPOD 0122423 6/19/R1 JOSchuyler/PGEE Letter Attach 2 request for VP&GM authorir.itinei 2 pgs.

GAMancatis/PG&E for earthquake effects on DC emerg.

GS-2 planning & full-pwr hearing support l

l NPOD 0122415 10/12/81 Rob Cudlin/ TERA Duplicate of documents numbered 11 pgs.

SMSkidmore/PG&E GS-2 NPOD 0122436 9/28/81 Dob Cudlin/ TERA Transmittal Ltr Consultant control rpt for 8/1/81 I pg.

SMSki.dmore/PGEE through 9/8/81 j

GS-2 I

NPOD 0122437 9/28/01 Rob Cudlin/ TERA Report Consultant control rpt for 8/1/81 5 pgs.

deduced SMSkidmore/PG68 through 9/8/81 i

GS-2 i

j NPOD 0122442 9/25/81 JJMcCann/PGEE Transmittal Ltr Subject change order to contract I pg.

EDCogswell/PG&E w/ TERA, w/l attach l

GS-2 JFTaylor/PG&E j;

)

NPOD 0122443 9/14/81 PSchleifer/ TERA Changu Order Contract change order Attach I I pg.

JOSchuyler/PG&E" i

GS-2 NPOD 0122444 6/8/81 DKDavis/ TERA Transmittal Ltr TERA proposal TR-81-1247 emerg.

I pg.

SMSkidmore/PG&E planning assistance w/2 attach.

j GS-2 l*

NPOD 0122445 6/8/81 RI. Cud l i n/ TERA Change Form Attach 1 Job scope change form DC 1 pg.

DKDavis/ TERA emerg. plan assistance TERA job 17709 GS-2 SMSkidmore/PGEE JWShiffor/PG&E i

l i

NPOD 0122446 6/8/81 plrudlin/ TERA Proposal Attach 2 proposal TR-81-1247 emerg.

]

3 pgs.

deduced SMSkidmore/PGEE planning activities required for fulI-GS-2 pwr license I

1 i

i i

i

,i.

4

-...a.-.

l_

~

f,'<.

+

- - -.g,_y r&Ty x=

y.r

.m

,. w s

Doc. No.

t >ATM From/To/ Entity tenc. sype asoc. asesor tist auri NPOD 0122449 6/15/81 DKDavis/ TERA Transmittal I.tr TERA proposal TR-81-1274 rev. I 1 pg.

SMSkidmore/PG&E w/l attach.

GS-2 NPO3 0122450 6/15/81 DKnavis/ TERA Proj. Summary Attach I estimated labor & other 7 pgs.

deduced SMSkidmore/PGLE direct costs TERA proposal TR-18-1174 QS-2 NPOD 0122457 6/29/81 RLCudlin/ TERA Letter Clarification of the scope of work I pg.

SKlein/PG&E applicable to job scope change 17709-2 GS-2 i

I I

I f

I i

l l

i

i

_.m.

s-m Doc. No.

DATF From/To/ Entity Doc. Type Doc. Descript10n QADD 0122459 4/8/81 GCLaguens/PG&E Verification Design verification for press. RV 3 pgs.

GS-1 QADD 0122462 12/4/80 No Name/PG&B Review Loss of coolant accident (thCA) from 1 pg.

a single electrical failure GS-1 i

OADD 0122463 6/23/80 No Name/PG&E Analysis rpt NSAC/INPO significant event-event description I pg.

GS.1 OADD 0122464 9/26/79 DLKing/ Westinghouse Letter DC transmittal of results of study 4 pgs.

JiiGormly/ PG&E pressuirizer heaters GS-1 j

QADD 0122468 4/8/80 No Name/PGLE Procedure PG&E Eng. Quality Control Dept.

j 2 pgs.

inspection section inspection plan GS-1 OADD 0122470 1980 No Name/PG&E Report PGGE Nuc. Plant problem reports 10 pgs.

GS-1 OADD 0122480 6/6/75 EMatis/PGLE Report PGEE Eng. Dept weekly inspection rpts 6 pgs.

JRobinson/PGEE GS-1 OADD 0122486 5/27/81 No Name/PGEE Analysis PG&E Design calculations-valves I pg.

GS-1

Doc. No.

DATE From/To/ Entity Doc. Type Doc. De'cription NPOD 0122491 5/12/78 LFGond/Wyle Labs.

Transmittal Ltr Fed. Signal Corp. purchase order 2 pgn.

KGrachan/ Fed. Signal Corp.

ID122556; Wyle Laboratories job GS-1 IND58306 w/2 attach.

NPOD 122494A 5/12/78 KGrachan/ Fed. Signal Corp.

Comments Attach. Ils comments on seismic 3 pgs.

deduced test of siren GS-1 HPOD 122497 5/23/78 JJAnderson/Wyle Labs Report Attach f2; seismic testing of 1 96 pgs.

LFGoad/Wyle Laba thunderbolt siren, 1003A w/A.F. control GS-1 No Name/PG&E 2 300GC selectone units, 1 RCM1A, &

1 RCM3 for Fed. Signal Corp Signal Div.

including appendices A-E.

NPOD 122594 3/14/80 BDEtzler/PG&E Purchase Order,

Pressurizer heaters w/2 attach.

I pg.

Fed. Pacific Electric Co.

GS-1 NPOD 122595 3/B0 No Name/PGEE Description Attach I detailed description of material 1 pg.

deduced GS-1 NPOD 122596 2/26/80 No Name/PG&E Purchase Order Attach 2 pressurizer heaters 2 pgs.

GS-1 tPOD 122598 4/6/77 Okonite Co.

Purchase Order Insulated Electrical Conductor w/3 attach.

I pg.

MRTresler/PGEE GS-1 NPOD 122599 4/77 No Name/PGEE Description Attach I description of insulated 2 pgs.

deduced electrical conductor GS-1

Doc. No.

DATE From/To/ Entity Dock Type Doc. De cription e

i NPOD 122601 4/27/77 HRTresler/PG&d Purchase Order Attach 2 insulated electrical conductor 1 pg.

Okonite Co.

i GS-1 NPOD 122602 4/77 No Name/PGEE Description Attach 3 description of insulated 1 pg.

deduced electrical conductor GS-1 NPOD 122603 9/9/79 RDEtzler/PGEE Purchase Order Circuit breaker w/3 attach.

I pg.

Fed. Pacific Electric Co.

GS-1 NPOD 122604 9/79 No Name/PGEE Description Attach I circuit breaker 1 pg.

deduced CAPrand/PG&E

,GS-1 RSnain/PGLE I

Material memo ret pressurizer heaters /

NPOD 122605 8/16/79 No Name/PGGE Memo 2 pgs.

DADrand/PGEE attach 2 GS-1 NPOD 122607 9/11/79 No Name/PG&E Instructions Instructions for preparing safety related 1 pg.

purchase orders /3 attach GS-1 HPOD 122608 9/79 No Name/PG&E Diagram Typical mounting detail of 480V 1 pg.

deduced air circuit breaker GS-1 i

P

Doc. No.

DATE From/To/ Entity Doc. Type Doc. De cription NPOD 122610 5/8/69 EliFrye/Wes tinghouse Equipment Re: pressurizer 5 pgs.

specification GS-1 sheet NPOD 122615 12/23/66 EllFrye/We stinghouse Eqt:1pment General pressurizer vessel assembly 55 pgs.

specification GS-1 sheet NPOD 122672 2/81 DCWood/Wes[inghouse Report Probabilistic analysis & operational 88 pgs.

G140ttshall/ Westinghouse data in response to NUREG 0737 GS-1 s

a l

l

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

~:'Z22 i

~~~ -

j 4

~ ~ - -... ~. _ _

.g: c In the Matter of

)

g gg I

PACIFIC GAS AND ELECTRIC COMPANY

)

Docket No. 50-275

)

Docket No.- 50--3.131t,R f Diablo Canyon Nuclear. Power Plant,

)

ri:: G & SERVICt-Units 1 and 2

)

(Full Powe#@EIceeding) i

)

CERTIFICATE OF SERVICE The foregoing document (s) of Pacific Gas and Electric Company has (haze) been served today on the following by deposit in the United States mail, properly stamped and addressed :

Judge John F. Wolf Mrs. Sandra A. Silver Chairman 1760 Alisal Street Atomic Safety and Licensing Board San Luis Obispo, California'93401 U. S. Nuclear Regulatory Commission Washington, D.

C. 20555 Mr. Gordon Silver 1760 Alisal Street Judge Glenn O. Bright San Luis Obispo, California 93401 Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission John Phillips, Esq.

Washington, D.

C. 20555 Joel Reynolds, Esq.

Canter for Law in the Public Interest Judge Jerry R.

Kline 10951 W. Pico Boulevard - Suite 300 Atomic Safety and Licensing Board Los Angeles, California 90064 U. S. Nuclear Regulatory Commission

_ Washington, D.

C. 20555 David F. Fleischaker, Esq.

1 P. O. Box 1178 Mrs. Elizabeth Apfelberg Oklahoma City

.C/o Nancy Culver Oklahoma 73101 192 Luneta Drive San Luis Obispo, California 93401 Arthur C. Gehr, Esq.

Snell & Wilmer Janice E. Kerr, Esq.

3100 Valley Bank Center Public Utilities Commission Phoenix, Arizona 85073 of the State of California 5246 State Building Bruce Norton, Esq.

350 McAllister Street Norton, Burke, Berry & French, P.C.

San Francisco, California 94102 3216 N. Third Street Suite 300 Mrs. Raye Fleming Phoenix, Arizona 85012-2699 1920 Mattie Road Shell Beach, California 93449 Chairman Atomic Safety and Licensing Mr. Frederick Eissler Board Panel Scenic Shoreline Preservation U. S. Nuclear Regulatory Commission Conference, Inc.

Washington, D.

C. 20555 4623 More Mesa Drive Santa Barbara, California 93105 i

Chairman Judge Thomas S. Moore Atomic Safety and Licensing Chairman Appeal Panel Atomic Safety and Licensing U. S. Nuclear Regulatory Commission Appeal Board Wxhington, D. C. 20555 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Sacretary U. S. Nuclear Regulatory Commission Judge W. Reed Johnson Washington, D. C. 20555 Atomic Safety and Licensing Appeal Board Attn.:

Docketing and Service Section U. S. Nuclear Regulatory Commission Washington, D. C. 20555 William J.

Olmstead, Esq.

Bradley W.

Jones, Esq.

Judge John H. Buck Office of Executive Legal Director Atomic Safety and Licensing BETH 042 Appeal Board U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D. C. 20555, Washington, D. C. 20555 Mr. Richard B. Hubbard MHB Technical Associates 1723 Hamilton Avenue, Suite X San Jose, California 95125 Mr. Carl Neiberger

'Telecram Tribune P. O. Box 112 San Luis Obispo, California 93402 Herbert H. Brown, Esq.

Lawrence Coe Lanpher, Esq.

Christopher B. Hanback, Esq.

Hill, Christopher & Phillips 1900 M Street, N.W.

Washington, D.

C. 20036 Byron S. Georgiou, Esq.

Lcgnl Affairs Secretary Governor's Office State Capitol Sacramento, California 95814 h

?

f P

lip A.

C ane, Jr.

Attor ey Pacific as and El tric Company Date: November 18, 1981