ML20032E829
| ML20032E829 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 06/03/1977 |
| From: | Reid R Office of Nuclear Reactor Regulation |
| To: | William Cahill CONSOLIDATED EDISON CO. OF NEW YORK, INC. |
| Shared Package | |
| ML093561254 | List: |
| References | |
| NUDOCS 8111230338 | |
| Download: ML20032E829 (3) | |
Text
-
n u
s.
June 3,1977 DISTRIBUTION:
Docket File (2) v NRC PDR (2) ucckets Hos.:
SC-247,
L PDR (2) and 50-236 ORB #4 Rdg RRei RI-n
~
r Kson Cer sol 1 dated Edison Conceny DJaffe of new York, Inc.
ATT1:
Mr. t!1111an.'. Cab 11 ), J r.
Attorney, OELD Yice President 018E (4)
DEisenhut I rv i n o'
' lace New Yort, new York ia03 TBAbernathy JRBuchanan Gentlenen:
ACRS (16)
Gray File (2)
Pf:
1%01 A" PClfli UNIT 5 NOS. 2 AND 3 We are currently reviewing the onsi te energency nowr sys tens of all operating nuclear pow'r f acilities to assess "e susceptibility of their safety related electrical equipment witn recarc to (i) sustainen degraded vol tage conditions at the off st te power sourcos ane (2) intor-ac tion between the of f site and onsi te emergency power systens.
we rave conpleted our review of licensee responses to our previcus eneric request for infernation relative to the electrical power li s triaution systems, fiased on this initial roview, we hwe preoereo t% Cafety Evaluation and Statement of Staf f Positions containeo in fnclosure 1.
?
We request tha' you conpare tha current design of the energency power syst e s at ye facility (jes) with the Sta ti Posi tions stated in tne enclosure an (1) orepose L int roc' fications as necessiry to acet the Ststt Positions, or s o-(2) provide a detailed analvsis which shws your facility desiin has equivalent capabili ties ano protec tive f ea tu ro s.
LO oo
~o Mditionally, we recuire that cei tnin technical specifications be incorporated into all factlity ceeratinc licenses.
Model technical
(
specifications, consistent witn tha StOff Desitions contained in mu, are proviced in Enclosure t.
oo EL 24 Accordingly, we request tnat you apply, within forty-five days of y
the receipt of this letter, for ar) acendment to your f acili ty operatin'.
j-wu license (s) to incorporate comparaole technical specificatiens to those
=
presented in the enclosure. Additionally, you shoulo provide a
'/
descriptico and a schedule for the completion of any plant associated
/
nodifications.
d
O O
Consolidated Edf son Conpany of New York, Inc. If you have any questions on this matter, piene contact us.
Sincerely, Robert W. Reid, Chief Operating Reactors Branch F4 Divisicn of Opcrat.ing Recctors
Enclosures:
1.
Staff Positions 2.
flodel Technical Specifications cc: See next page r
f I
/
ORB #4:00R,j ' ORBQ:gqRg C-0J184400R o r,,c.,
gt~
W6v P_Er.ickSonirRL _D.J 1 Reid
.um..*
___.8/.3.lZL_
6/3/f7 6/3 /27 om
- NRC FORM 318 (9-76) NRCM 0240 A us s.oovsRNMENT PftsNTII48 OFFICEi 8974. GAS 4N
O o
Consolidated Edison Company of New York, Inc.
cc: Mrs. Kay Winter, librarian Hendrick Hudson Free Library 31 Albany Post Road Montrose, tjew York 10548 Leonard fl. Trosten, Esquire LeBoeuf, Lanb, Leiby & liacRae 1757 il Street, N. U.
Washington, D. C.
20036 Anthony Z. Roismen, Esquire Berlin, Roisman 6 Kessler 102515th Street,, N.W., 5th Floor Washi ngton, D. C.
20005 Paul S. Shemin, Esq.
Assistant Attorney General State of New (ork Department of Law Two World Trade Center New York, New York 10047 Sa' rah Chasis, Esq.
Richard M. Hall, Esquire 15 West 44th Street New York, flew York 10036 Director, Technical Development Programs State of New York Energy Office Swan Street Building CORE 1 - Second Floor Empire State Plaza Albany, New York 12223 Admiral Paul Early (IP-3)
Power Authority of the State of New York 10 Colunbus Circle flew York, New York 10019
' - - - ~ - -
__