ML20032E609

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/81-19 on 811013-16.No Noncompliance Noted
ML20032E609
Person / Time
Site: Davis Besse 
Issue date: 11/03/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20032E610 List:
References
NUDOCS 8111200737
Download: ML20032E609 (2)


See also: IR 05000346/1981019

Text

-

- - - -

- - _ -

--- -

.

,

lE HQ FILE COP _Y

tl0V 3,1981

b

<Q

g

%rrrl

%}

d

Docket No. 50-346

u.s.ym ,,, ,,g7 ,;Y

Il0V2 9 ;g

7

Toledo Edison Company

~1

ATTN:

Mr. Richard P. Crouse

Vice President

-

""5 c"

c

Nuclear

k

,

s/f,

Ediscu Plaza

'9' [IM ,\\ a

300 !!adison Avenue

'

Toledo, OH 43652

'

Gentlemen:

This refers to the routine safety inspection conducted by Mr. D. E. Miller

of this office on October 13-16, 1981, of activities at Davis-Besse Nuclear

Power Plant, Unit 1, authorized by NRC Operating License No.'NPF-3 and to

the discussion of our findings with Mr. T. Murray and others at the con-

clusion of the inspection.

The inspection was an examination of activities conducted under your license

as they relate to radiation safety and to compliance with the Commission's

rules and regulations and with the conditions of your license. The inspec-

tion consisted of a selective examination of. procedures and representative

records, observations, independent treasurements, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified during the-

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room. If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

,

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

,

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

DM'

T E o lo

8111200737 811103

PDR ADOCK 05000346

/l

0

Pon

-.

. -

- - . - - - -

. - -

.

1

. Toledo Edison Company

-2-

NOV 31981

e

a full statement of the reasons which are.the bases for the claim that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-

porated as far as possible -into a separate part of the affidavit. -If we do-

not hear from you in this regard within the specified periods noted above, a

copy of this letter and tne enclosed inspection report will be placed in the

<

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original $lgned by C.E. Ndrelius II

I

C. E. Norelius, Director

'

Division of Engineering and

,

Technical Inspection

Enclosure:

IE Inspection

i

Report No. 50-346/81-19

cc w/ enc 1:

T. D. Murray, Station

-Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power

Siting-Comt:ssion

Helen W. Evans, State of Ohio

J

'

u

k

RIII

RIII

RIII

RII

&W

/&

O k'3

di

-y

Miller /so

Greger

Stteeter

orellus

g[7,

U/12

U t/7'

l

10/31/81

s

L

.

.

.

. .

.

.

.

.

.

.

.

.