ML20032E486
| ML20032E486 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/02/1981 |
| From: | Raidy T SOUTHERN CALIFORNIA EDISON CO. |
| To: | |
| Shared Package | |
| ML20032E483 | List: |
| References | |
| NUDOCS 8111200606 | |
| Download: ML20032E486 (5) | |
Text
-
j AC40. RA i
l l
a NRC MONTHLY OPERATING REPORT DOCKLT NO __50-206 DATE 11/2/8l CONIPLETED BY T.
rainy TELEPHONE 714-492-7700 ext. 210 OPERATING ST ATUS SAN ONOFRE NUCLEAR GENFRATING STATinN. l) NIT 1
- 1. Unit Name:
OCTOBER 1.19861.THROUGH OCTOBER 31, 1981
- 2. Reportmg Period:
1347
- 3. Licensed Thermal Power (Mht):
456
- 4. Nameplate Rating (Gross MWe):
436
- 5. Design Electrical Rating (Net MWe):
456
- 6. Masimum Dependable Capacity (Gross MWe):
436
- 7. Masimum Dependable Capacity (Net M%e):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gi+e Reasons-N.A.
NONE
- 9. Power Lesel To Which nestricted.lf Any (Net MWe):
NONE
- 10. Reasons For Restriction <. If Any:
This Month Yr..to-Daic Cumublise 745 7296 132.356 II. Hours In Reporting Period 0.0 1061.2 85,672.5
- 12. Number Of Hours Resetor has Critical
- 13. Reactor Resene Shutdown Hours 0
0 0.0 953.0 82,067
- 14. Hours Generator On.Line
- 15. Unit Rtiene Shutdown llours 0
0 n
0 985.033 105.069.294
- 16. Gross Thermal Energy Generated (MWH) 0 333,600 36.173.834 17 Gross Electrical Energy Generated (MWH) 0 302.409 33.966.451 lb. het Electrical Energy Generated (MWH) 0%
13.06%
67.87%
- 19. Unit Senice Factor 0%
13.06%
67.87%
20 Unit Asailability Factor 0%
9.51%
65.29Y
- 21. Unit Capacits Factor (Using MDC Net, 0%
9.51%
65.29%
2.'
Unit Capacits Facier ;Using DER Net) 100%
86.93%
22.46%
2V Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (T3pe.Date. ant Duration of Eachi.
SCHEDUIFn. JANttARY 1QRL Fi WTFVR 25 If Shut Down At End Of Report Period. Estimated Date of Startup: -
11/3/RI 26 Units In Test Status (Prior to Commercial Operation)
Forecatt Achiesed INITI AL CRITICALITY INITI AL ELECTRICITY COMMERCI At OPER ATION 8111200606 811106 PDR ADOCK 05000206 R
- _ _ _ _ _ _ b
,g ---
--g-_.-
- r-___-
REFUELING INFORMATION a
DGCKET NO.
50-206 UNIT SONGS 1 DATE 11 /3/81 COMPLETED BY T. RAIDY TELEPHONE 714 497 7700 ext. 210 1.
Scheduled date for next refueling shutdown.
MARCH 1983 2.
Scheduled date for restart following refueling.
MAY 1983 3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
NOT YET DETERMINED What will these be?
4.
Scheduled date for submitting proposed licensing action and supporting information.
NOT YET DETERMINED 5.
Important licensing considerations associated with refueling, e.g.
new or different fuel design or supplier, unreviewed design or iterformance analysis methods, significant changes in fuel design, new operating procedures.
NOT YET DETERMINED 6.
The number of fuel assemblies.
a)
In the core 157 b)
In the spent fuel storage pool.
94 7.
Licensed spent fuel storage capacity. _
21 6 Intended change in spent fuel storage capacity.
NONE 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
OCTOBER 1984 j
.... M.......,,,
~
SUPJMRY OF OPERATING EXPERIENCE FOR THE MONTH t
i DOCKET NO.
50-206 j
UNIT songs 1 DATE 11/3/81 COMPLETED BY T. RAIDY 1ELEPHONE 714-492-7700 ext. 210 The unit was shut down the entire month for Safety Injection System Modification.
,me e
OO
- * * = I 4,
___e--,-.,-
DOCEET NO.
50-206 UNIT SilU1 DOWNS AND POWFR REDUCTIONS UNIT N AME SONGS 1 DATE 11/3/81 I
COMM.ETED 1tY T. RAIDY RFPORT MONMI _ OCTOBER TEl.ErilONE 7I4/492/7700 ext. 210 L
E Cause A Correttive j;
[E 3
hE I.itensee
,g e
I)Jic y
5g 4
- 3E F. vent g
n.?
Atti m to A~
d y 5 :a Repiirt e in U E'
Preveni Rrmerente v
6 l
67 Sept. 3, 81 F
745 Z
2 LER 020 S F Valves Tests show HV valves will net open with design AP. New design being l
Installed and testint' in progress.
LER 021 EB Instru Voltage r'egulator filter choke failed to ground. Regulator was temporarily jumpered for power continuity, and has subsequently been repaired I
2 1
4 I Tarted McJu.n:
Method; i.nhibie F. insionsshms
% % hviloteil A.I spnement l'ailure (f.splain)
- 1. Manual her Prepar.iti..n of DJta n M iintenance ni rest
- 2. Manual Scram.
l.ntes Sheets fin Ikensee
('. Rc j t erlitt p 4 Atllott1Afit* Stf.Itti.
I.wcett He*p..it (l l R I l IIc lNIIN! G.
D Rerul H"'S Restritti..n 4 Other (1:tplanil of tili I () pot.stof lf Jettlety & l is cit %c l.1JttiillJfient I A dttstethlfJ1i4c l'\\Ilihit l l S.tltts' SotHt't*
(s ()l%'t.tfla tet.tl l t f e et ll spf.tillI ll Olhve (1 ipt.inti
[
.. q.9,,..../..
~
,, ~.
AVER 4GL D AILY L* NIT POWER LEVEL e
DOCKET NO. _50-206 UNIT SONGt; 1 l
DATE 11/3/81 COMPLETTD By T. RAIDY TELEPHONE 714-492-7700 ext. 210 l
October MONTH DAY AVER AGE D AILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (Mbe Net)
(MWe Net t 0
0 1
37 0
0 2
gg 3
0 i,
0 0
0 20 4
5 0
21 0
0 0
6 0
0 7
23 0
0 g
9 0
25 0
10 0
26 0
0 O
is 0
0 l
12 33 0
0 l
13 29 l
0 0
l 14
,o l
0 O
Is 3,
O i,,
- siol.)in....,,,
1
^
e M
-6
-